A toilet that arrives on site without a written specification is the fastest way to create a snag list. Rough-in mismatch, the wrong drain direction, or a bowl shape that does not match the vanity line are all avoidable — and they are all settled on paper before production starts. The sections below use our washdown one piece toilet, model 1003A, to show exactly which fields belong in a buyer-side specification, and how each line protects the installation.

Start with the waste connection, not the styling

In ceramic sanitaryware, the trap decides whether the unit fits the plumbing already cast into the slab or wall. The 1003A is offered in two configurations: a P-trap wall drain with a 180 mm rough-in, and an S-trap floor drain with a 250 mm rough-in. Both are listed on the same product page, which is precisely why the trap type has to appear as a line item in your purchase order rather than being assumed from the catalogue image.

For each bathroom type in the project — guest cloakroom, guest room bathroom, master ensuite, shared level-two bathroom — record three numbers on the drawing before you quote:

  • The drain centre distance from the finished wall face, measured after tiling, not to the bare substrate.
  • Whether the waste exits through the wall or through the floor.
  • The finished floor level at the trap, so an S-trap unit does not sit proud of a new screed or waterproofing build-up.

Where an existing building is being refurbished and the waste position cannot be moved, send the measured rough-in to the supplier together with a photograph of the current arrangement. Where a new build is still open, confirm the trap choice with the plumber first, because it changes the wall framing depth.

Specify the body construction and glaze

The 1003A is a one-piece unit: pan and cistern are formed as a single body rather than bolted together. For procurement, that construction detail matters for two practical reasons. There is no visible seam between pan and cistern to collect dust and moisture behind the seat hinge, so housekeeping can wipe one continuous surface; and there is no gasket joint between the two sections that can weep over years of use in a high-turnover bathroom.

Write the material and finish into the specification as testable wording rather than adjectives:

FieldWhat to stateWhy it matters at handover
Body typeOne-piece, washdownDetermines cleaning routine and the number of on-site parts
MaterialVitreous ceramicDense body that does not absorb water at the surface
FinishGlossy glaze, colour (state the colour code)Glaze quality drives staining and yellowing resistance over years of cleaning
Flushing methodWashdownSets expectations for noise, splash behaviour and water use class
Certification markingCE marking as stated on the product page; confirm scope in writingMatches the document pack to what the project actually requires

Keep the model name consistent across documents

One more field that quietly causes rework: this unit appears in the catalogue with slightly different word order in two listings. Choose one form — product name plus model number — and use it identically in your specification, purchase order, packing list and as-built record, with the product page or item number beside it. When the same model shows up under two spellings in a document set, the site team receives whichever version the warehouse recognised first.

Match the specification to the room type

The same bowl can be a good or a poor choice depending on traffic. In private villas and hotel guest rooms, where cleaning is scheduled and users are briefed, a seamless one-piece pan keeps housekeeping time short. In public or semi-public restrooms with heavy use and minimal user care, cleanability of the rim and glaze becomes the deciding factor, so request a sample for a cleaning trial before you commit to the full quantity.

Coordinate the toilet with the rest of the sanitary package at specification stage. Our bathroom ceramics are catalogued together — wall hung ceramic basins, freestanding pedestal basins, bidets and vanities — so a single supplier document can hold the whole set of models, finishes and trap types in one table. That is where a one-stop interior fixtures approach saves real administrative time: one specification sheet, one production batch, one delivery window instead of five separate vendor packs that disagree with each other.

Set the sample and approval sequence

For anything beyond a single unit, ask for an approved sample before bulk production. The purpose is narrow and practical: confirm the glaze colour under your own lighting, check the seat fixing type, and dry-fit the unit against a mock-up wall to verify the rough-in. Record the outcome as a signed approval sheet with a photograph of the sample and its reference number. Production then follows an approved physical object, not a screen image.

  • Request the dimensional drawing for the exact trap variant you ordered.
  • Confirm seat type — soft-close or standard — and whether it ships fitted or loose.
  • Confirm packaging: individual cartons with corner protection, and carton marking that references room numbers so the site team can distribute without opening boxes.
  • Agree spare-parts provision for future replacements, since discontinued models are a common long-term problem in hospitality portfolios.

Order quantities by zone, not as one block

Split the order into the same zones used on the plumbing drawings. Guest-level units and upper-floor units frequently need different trap types, and a single undifferentiated quantity is where mixed deliveries begin. Add a small contingency for on-site breakage during installation, and keep that reserve in the original specification so it ships in the same container rather than as a separate late shipment.

Before placing an order, ask the supplier to confirm current dimensional drawings, glaze colour options and certification scope for the specific model and trap variant. Figures published on product pages should be checked against the document pack issued with your quotation.

If you are specifying sanitaryware for a villa, hotel or refurbishment package, send us the room schedule and measured rough-ins and we will return a specification table — model, trap type, finish and packaging — for review before production. As a China furniture and building materials manufacturer working on turnkey projects, SANTERSON coordinates ceramics with the vanities, cabinetry, lighting and flooring in the same package, so the whole bathroom arrives as one coordinated delivery.