A swim spa quote is easy to compare on price and hard to compare on substance. Two proposals for a Outdoor Swim Spa WS-S06 can look identical on the first page and diverge sharply once you read the pump schedule, the electrical assumptions and the scope of what arrives in the container. The checklist below is written for procurement teams, contractors and facility owners who need to turn a WS-S06 quotation into a decision they can defend to a client or a board.
What the WS-S06 actually is before you judge the quote
The WS-S06 sits in our configurable outdoor swim and hydrotherapy range, alongside longer formats in the same swimming pool category. The catalogue entry lists a shell of 5820 × 2220 × 1110 mm, which places it in the compact end of the range: long enough for lap-style resistance swimming and jet massage, short enough to sit on a terrace deck, a rooftop podium or a resort garden without the excavation footprint of a full pool.
That positioning matters when you read a proposal. A unit of this size is usually specified where floor area, structural loading or site access rules out a 10-metre spa. If a supplier answers your enquiry by pushing you to a much longer model without asking about the slab, the access route or the plant room, they have quoted a product rather than solved your site.
Line item 1: the specification sheet, not the brochure photo
Ask for the specification block in writing and read it line by line. For the WS-S06 our catalogue records the following:
| Item | What the catalogue lists for WS-S06 |
|---|---|
| Catalogue dimensions | 5820 × 2220 × 1110 mm |
| Control system | 1 set |
| Water pump | 2 pcs |
| Filter pump | 1 pc |
| Jet total | 56 pcs |
| LED lighting | 2 lights plus 18 small LED lights |
| Total power | 6.35 kW |
| Features shown | Water jets, LED lighting, Ozone, Waterfall, 4 water columns |
Three things in that table are worth checking on any proposal you receive. First, the pump count: two water pumps plus one filter pump is a specific arrangement, and a cheaper quote may quietly reduce it to a single water pump while keeping the same jet count in the description. Second, the total power figure of 6.35 kW is the basis for your electrical design — if the number is missing from a proposal, the supply, breaker size and cable run have not been designed yet. Third, features such as the waterfall and the four water columns should appear as named line items with quantities, not as decorative adjectives in an introduction.
Line item 2: what is optional and what is assumed
Most of the price difference between two swim spa proposals lives in the options list. For this range, catalogue-listed options include control systems, UV sterilisation, additional water pumps, heat pumps, sand filtration, insulation and steps. Compare proposals by building your own table of six columns — included, optional at extra cost, excluded, site-supplied by others, not stated:
- Heat pump. Determines whether the spa is usable outside summer and what the running load looks like. A unit quoted without a heat pump for a year-round facility is incomplete, not cheaper.
- Filtration. Sand filtration versus cartridge changes both water quality and maintenance labour. For a hotel or gym, ask what the maintenance interval is on the quoted system.
- Insulation. Directly affects energy loss overnight. In a commercial tariff this shows up in the operating budget within the first year.
- Steps and access. Often left off because they are treated as accessories, then added on site at a premium.
- UV sterilisation. Reduces chemical load, which matters where the facility is enclosed or close to guest rooms.
A supplier who lists these items with prices and states what is excluded has given you something usable. A supplier whose quote says "fully equipped" has given you a negotiation for later.
Line item 3: the site interface — this is where commercial projects fail
A swim spa is a wet, powered, drained structure. Before signing, confirm in writing who is responsible for each of these:
- Structural support and the deck or slab, including the loaded weight of a filled shell.
- Electrical supply to the unit, protection devices and the isolator, designed against the stated total power.
- Drainage, overflow and any pump-out route.
- Delivery access: crane, forklift or manual carry, and whether the unit must pass through a building to reach the terrace.
- Water supply and first fill.
Get these as named responsibilities in the quotation or in the contract annex. On Australian villa and hospitality jobs we work on, the interface list is usually what decides whether an installation runs to programme.
Line item 4: the supplier's delivery and after-sales scope
For imported fit-out packages the commercial risk sits in logistics and handover, not in the jets. Our logistics and door-to-door delivery service covers freight forwarding by sea, air and rail, customs paperwork, packaging and container loading, shipment tracking and door-to-door delivery. Ask any supplier to state the Incoterms they are quoting, the port of delivery, and who handles import clearance at your end.
Then read the after-sales section as carefully as the product section. Spares for pumps, jets, control boards and LED fittings should be identified by part reference, with an agreed route and lead time for replacement. Warranty terms, exclusions and who performs service visits on site are all worth settling before award — a proposal that is silent here transfers every future cost to you.
Line item 5: does the spa belong in a larger package?
On resort, villa and clubhouse projects a swim spa rarely stands alone. It sits beside poolside loungers, cabana daybeds, pergolas and hardtop shade structures, outdoor dining sets and wet-area cabinetry. Coordinating those items with one supplier reduces interface clashes, keeps finishes consistent between the deck furniture and the water feature, and consolidates freight into fewer containers. Our turnkey solutions for villa, hospitality and office projects run from design consultation and material selection through production, project management, site coordination and handover, which is why swim spa enquiries frequently arrive as part of a wider package rather than as a single line.
A scoring sheet before you award
- Specification block attached, with pump count, jet count, total power and named features — not marketing copy.
- Options priced separately, exclusions stated in writing.
- Swim current arrangement confirmed if lap swimming is part of the brief.
- Site interface list signed off: structure, power, drainage, access, first fill.
- Incoterms, delivery point and clearance responsibility named.
- Spare-parts list, warranty terms and service route agreed before award.
- Reference detail drawings issued for the selected configuration, not a generic brochure.
Score every proposal against those seven points. The lowest price usually loses on two or three of them, and each gap becomes a variation order after the container has shipped.
Send us your WS-S06 enquiry
Share the site drawing, the intended use (hotel, gym, residential clubhouse or private villa) and your target handover date, and we will return a configuration with a full specification block, priced options and a delivery plan. Contact details are on our contact page, and the wider product range is in the products section.