An outdoor swim spa is one of the few line items in a villa or resort package where the quotation, the foundation drawing and the electrical schedule all have to agree before anyone signs. A model code on a purchase order is not a specification. The document below shows how we build a written specification for Outdoor Swim Spa WS-115AⅢ, line by line, so the buyer, the civil contractor and the manufacturer are reading the same numbers.
Why the specification matters more than the model code
Swim spas sit between furniture and building services. The shell has to be delivered through a door or over a slab, filled with water, wired to a dedicated circuit and kept at temperature. Each of those constraints belongs to a different party on your project. When the specification only says "WS-115AⅢ", none of those parties can check their own work against it.
We treat the model code as a starting point inside a configurable outdoor swim and hydrotherapy range. Variants in the same size class differ materially: our Outdoor Swim Spa WS-115AⅢ-U shares the catalog footprint of WS-115AⅢ but lists a different pump count, jet count and total power. Comparing two codes side by side is exactly what a proper specification should let you do.
Step 1 — Fix the shell dimensions against your site
Catalog data for WS-115AⅢ gives an outer size of 3880 × 2200 × 1250 mm. Put those three numbers into your drawing and check four things before you accept the position:
- Access route. Measure the delivery path — gate width, turning radius, door height — not just the final terrace. A spa that fits the pad but not the side passage is a crane lift or a re-sited deck.
- Structural support. A filled shell of this class loads the slab heavily. Hand the dimensions and the filled weight to your structural engineer; do not assume an existing balcony or podium deck will take it.
- Water level and drainage. Confirm overflow, drain-down and any plant-room pipework relative to the 1250 mm shell height.
- Clearance for service. Leave access to the equipment compartment. A spa boxed in on all four sides cannot be maintained without dismantling finishes.
Step 2 — Write out the equipment list line by line
This is the part most quotations get wrong: they describe features instead of counting equipment. For WS-115AⅢ, the site-listed specification reads as follows.
| Specification item | Catalog entry for WS-115AⅢ | What to confirm in writing |
|---|---|---|
| Model | WS-115AⅢ | Exact code, including the Ⅲ suffix, on quotation and packing list |
| Catalog dimensions | 3880 × 2200 × 1250 mm | Outer shell size; your design adds coping and clearance |
| Control system | 1 set | Controller type, display location and who provides the low-voltage feed |
| Swim training system | 1 set | Listed for WS-115AⅢ; confirm the unit type and its flow performance against your swim-training brief |
| Water pump | 1 pc | Pump duty and whether additional pumps are an option on this shell |
| Filter pump | 1 pc | Filtration cycle time and filter media type |
| Jet total | 24 pcs | Jet layout drawing, seat positions served, hydrotherapy zones |
| LED lights | 4 pcs | Fixture positions and control grouping |
| Total power | 8.05 kW | Voltage, phase, dedicated circuit size, protective device — confirm with your electrical engineer |
| Features shown | Water jets, LED lighting, Ozone, Swim training system | Which of these are included versus optional on your configuration |
Read the last two rows carefully. "Total power 8.05 kW" is a catalog figure for that configuration; it is not an electrical design. And a feature list is not an inclusion list. Ask for the included-equipment schedule and the optional-accessories schedule as two separate tables in the quotation.
Step 3 — Decide the options, then exclude them on paper
Catalog-listed options across this range include control systems, UV sterilization, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so an option you have seen on one shell is not automatically available on another. For each option, the specification should state three things:
- Included, optional or excluded. A single word per line item, matched to the priced quotation.
- Who supplies and who installs. Heat pumps, insulation and steps are often site-critical but frequently left out of the supplier's scope.
- Climatic basis. In a cool-climate or shoulder-season project, heating and insulation change running cost far more than lighting does. State the design water temperature and ambient condition you are buying against.
Step 4 — Compare within the size class, not across brochures
Once the equipment list is written out, alternatives become easy to judge. Two useful comparisons from our own catalog:
- Same footprint, different plant. WS-115AⅢ-U is listed at the same 3880 × 2200 × 1250 mm with 4 water pumps, 23 jets and one LED light, and a higher catalog total power — but no swim training system is listed for it. If daily swim training drives the purchase, that single line decides between the two.
- Same plant, longer shell. WS-115FⅢ carries the same 24-jet count, single water pump and 8.05 kW catalog figure at a longer 5000 × 2200 × 1250 mm shell — useful where the terrace allows extra length for a relaxation zone beside the swim lane.
The point is not which model is better. It is that a written specification lets you hold two configurations against each other on the items that actually affect your project, instead of on brochure language.
Step 5 — Tie the swim spa into the rest of the package
A swim spa rarely arrives alone. On villa and hospitality projects it lands in the same window as poolside loungers, pergolas and hardtop shade structures, wet-area finishes, lighting and outdoor cabinetry. Coordinating those trades on one schedule avoids a spa being installed while the deck is still open.
That coordination is where a one-stop project furnishing supplier earns its place. Our Custom & OEM service covers bespoke dimensions, finishes and material choices where a standard shell needs to match surrounding joinery or cladding, and our logistics service handles freight forwarding, packaging and container loading for the whole package rather than one crate at a time. The six-stage workflow we run — consultation, design and planning, production, logistics, installation and after-sales — gives you one document trail from specification to handover.
A pre-order checklist
- Model code confirmed on quotation, drawing and packing list, including the Ⅲ suffix
- Outer shell dimensions checked against access route, slab loading and service clearance
- Included-equipment schedule with counts: control system, swim training unit, water pump, filter pump, jets, LED lights
- Catalog power figure separated from the electrical design; voltage, phase and circuit agreed with your engineer
- Every option marked included, optional or excluded, with supply-and-install responsibility named
- Design water temperature and ambient condition stated for heating and insulation decisions
- Delivery window aligned with decking, finishes and lighting trades
- Spares, warranty scope and service access recorded before the spa is enclosed
Send us your draft specification
If you already have a swim spa line item on a bill of quantities, send it over with the project drawings. We will mark up which figures are catalog data, which need engineering confirmation and which options change the price — and quote against the same list so comparisons across models stay honest.