A wall-mounted media wall looks simple on a drawing: a panel, a screen, some shelving. In production it is one of the most coordination-heavy items in a living space, because the joinery, the television, the cable routes and the wall behind it all have to agree before a single board is cut. Our Santerson Wall Mounted Media Walls are made to measure for each project, which means the specification you send us matters more than the catalogue page. Below is the list we work through with buyers, designers and builders before any panel enters production.

The short version: confirm the wall structure, the exact screen and its mounting, the storage layout, the finish samples, the electrical plan and the delivery route. Everything else follows from those six items.

1. The wall itself, not just the unit

Wall-mounted systems carry their own weight plus the screen, so the substrate decides how the unit is fixed. Before we detail the joinery we need to know what the media wall is being fixed to and what the site team can provide on site:

  • Wall construction — masonry, stud partition, timber frame or an existing finished surface.
  • Squareness and flatness of the wall, and any skirting, cornice or architrave that has to be cut or scribed around.
  • Clear floor-to-ceiling height at several points on the wall, not one average measurement.
  • Whether a structural backing or timber batten frame is required behind the panel zone, and who supplies and installs it.

If the wall is out of square, we can design scribed trims and shadow gaps to absorb the deviation. That decision has to be made at drawing stage — it cannot be fixed with a router on site.

2. The screen: size, mount and service cavity

The television is part of the specification, not an accessory added later. Please confirm:

  • Screen size and model, or at least the exact outer dimensions and weight if the model is not yet chosen.
  • Mount type — fixed, tilt or full-motion arm — and whether the arm needs a recessed pocket so the screen sits flush with the panel face.
  • The centre point of the screen relative to floor level, which drives shelf heights around it.
  • Ventilation requirements for larger panels, and whether rear access is needed for connections.

Where a client has not decided on a television yet, we design to an agreed envelope and mark the mounting zone as adjustable within a stated range. That keeps production moving without locking you into a model.

3. Storage layout: open, closed or both

Media walls fail in daily use when the storage does not match how the room is actually used. Decide early which of these the project needs, because internal carcass dimensions change with the answer:

  • Closed compartments that hide consoles, routers, set-top boxes and games storage.
  • Open niches for books and objects, kept consistent with the Floating TV Units when both systems sit on one wall.
  • Glass-front display sections with lighting, where dust and glare both need thought.
  • A mixed layout, which is what most villa living rooms end up needing.

For larger rooms that want the whole wall resolved, compare this format against Santerson Full Height Media Walls. Floor-to-ceiling systems change the load path and often remove the need for a separate backing frame, but they also require a level floor line and clear ceiling access.

4. Materials, finish and edge detail

Finish approval should happen on physical samples, not screen images. Confirm with us:

  • Board substrate and core for the carcass, and the facing material for the visible fronts.
  • Finish family — matte lacquer, high gloss, veneer, textured melamine or a wood grain effect — matched against the flooring and cabinetry already specified for the project.
  • Edge treatment: mitred, rounded or square profile, and whether handles are used at all or a handleless route is taken.
  • Panel joint pattern on the feature section, including grain direction across joints.

Where the media wall has to match joinery supplied by another trade — wardrobes, sideboards, concealed doors in the same room — send us a sample of that finish rather than a colour name. Names differ between factories; a physical sample does not.

5. Lighting and electrical coordination

Integrated lighting is one of the details most often left too late. If the design includes lit niches or a backlit section, confirm:

  • Which sections are lit, whether the light is top-down, shelf-edge or concealed strip.
  • Colour temperature and dimming method, and which switch or control on site operates it.
  • Where drivers and transformers sit, and whether they remain reachable after installation.
  • Cable routes for the screen, soundbar, speakers and any floor box below the unit.

If you want light to do more than illuminate the shelves, our Santerson Backlit Feature Walls and Santerson Integrated LED Media Units are the configurations to review, since both need the electrical first-fix agreed before panels are machined.

6. Dimensions, tolerances and the drawing sign-off

Production starts from a signed shop drawing, so that document should show:

  • Overall width, height and projection, with module-by-module dimensions.
  • The tolerance allowance at each end of the run and how it is taken up.
  • Screen centre point, service cut-outs and ventilation positions.
  • Assembly sequence and fixing method, so the site team can prepare the wall in advance.

One practical rule: measure the wall after plaster, paint and floor finishes are complete. A media wall detailed off a bare-shell measurement will not sit correctly against a finished room.

7. Packaging, access and installation

Long panels create logistics questions that are cheap to answer early and expensive to solve at the property:

  • Piece sizes against stairwells, lifts, doors and turning spaces on site.
  • Whether the design should be split into modules that pass through the access route and joined in place.
  • Packaging specification for export shipments, including corner protection and moisture barriers.
  • Who installs — our team on site, or the local contractor working from our assembly drawings.

For international projects we handle freight arrangements and door-to-door delivery as part of the same order, so the panel sizes and the container plan are agreed together rather than separately.

Before you place the order — a quick checklist

  • Finished-wall measurements taken at multiple points, with construction type confirmed.
  • Screen model or agreed envelope, plus mount type and centre height.
  • Storage mix agreed: open, closed, glass-front or combined.
  • Physical finish samples approved against the room's other joinery.
  • Lighting and electrical first-fix drawn and coordinated with the site electrician.
  • Shop drawing signed, including tolerances and assembly sequence.
  • Access route checked for the largest piece; delivery and installation responsibility named.

If you are weighing a wall-mounted system against other layouts in the same range, Santerson Integrated TV Panels and Santerson Sliding Panel TV Systems solve different problems — one for a seamless panelled face with the screen set into the wall, the other where the screen is hidden when not in use. Send us the floor plan and the wall elevation and we will tell you which format suits the room.

Can the media wall be matched to cabinetry from another supplier?

Yes, provided you send a physical sample of the finish and the edge profile. Colour names are not reliable across factories.

What if the television has not been selected when we need to order joinery?

We design to an agreed screen envelope and leave the mounting zone adjustable within a stated range, so production is not held up.

Who prepares the wall behind a wall-mounted media unit?

Usually the site contractor, from our fixing drawings. We specify the backing or batten frame required; the on-site team installs it and confirms levels before we finalise the panel dimensions.

Send us your wall elevation

Share the plan, the finished-wall measurements and the screen you have in mind, and we will return a shop drawing, a finish schedule and a quotation for the exact configuration your project needs.