A swim spa quote that looks complete at first glance can still hide the costs that matter most on site: what is actually inside the shell, what has to be supplied locally, and how much power and water preparation the installation needs. If you are comparing proposals for Outdoor Swim Spa WS-PC05CH, this checklist shows exactly which lines to read, which questions to put back to the supplier, and how to make two quotes comparable.
1. Confirm the model code on every page of the quote
WS-PC05CH sits in a configurable outdoor swim and hydrotherapy range, and neighbouring codes in the same family carry different dimensions and jet counts. A quotation that says "5 m swim spa" in the header but "WS-PC04" or another code in the packing list is not the same product. Check that the model code appears identically on the price line, the specification sheet, the packing list and the drawing, and that it matches the order confirmation you sign.
The published catalogue figure for this model is 5000 × 3000 × 900 mm. Treat that as the shell size, then ask the supplier to state the access dimensions separately: door openings, lift or crane requirements, and the clearance needed around the shell if it is recessed into a deck. Site access is where swim spa budgets most often move after order.
2. Read the equipment list line by line
The specification block published for this model lists the following. Every one of these items should appear in your quote with a quantity, not just as a phrase such as "fully equipped".
| Item shown on the product page | What to verify in the quote |
|---|---|
| Catalogue dimensions 5000 × 3000 × 900 mm | Same figure on drawing and packing list; access route confirmed |
| Control system: 1 set | Which controller, display functions, and whether spare parts are listed separately |
| Water pump: 1 pc | Pump brand, flow rate and head; whether it is included or an option |
| Filter pump: 1 pc | Filtration cycle, filter element size and replacement price |
| Jet total: 30 pcs | Total count and jet layout; jet type per seating position |
| LED lights: 1 pc | Fitting location, colour options, low-voltage supply included or not |
| Total power 2.45 kW | Whether the figure covers only listed equipment or a chosen option set |
| Features shown: water jets, LED lighting, ozone | Ozone generator quantity, service interval and consumable cost |
Two details deserve particular attention. First, the product page does not list a swim training system for this configuration, so if your project brief calls for lap swimming or resistance training, ask in writing whether a swim current unit is available for this shell and what it adds to price and power. Second, jet count alone does not describe the massage experience: two shells can both list 30 jets with very different seating layouts, so request a jet layout drawing rather than accepting a number.
3. Separate standard equipment from options
Catalogue-listed options for this range include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so an option you assume is fitted may be priced as an add-on or unavailable on the shell you selected. For each option in your quote, ask three questions: is it factory-fitted or shipped loose; does it change the total power figure; and does it change the insulation or foundation detail.
4. Check the electrical and plumbing scope split
The published total power for this configuration is 2.45 kW. Before signing, confirm with the supplier: supply voltage and phase required; whether a dedicated circuit, isolator or residual-current protection is included or left to your local electrician; cable length from the control panel to the spa; and who commissions the controller on site. On the plumbing side, clarify water fill and drain arrangements, whether drainage falls are supplied by others, and which parts need a water-proofing detail on site.
Write these boundaries into the quote as "supplier scope" and "buyer scope" columns. Most swim spa disputes are not about product quality; they are about an isolator, a step foundation or a crane lift that neither party priced.
5. Ask how the shell is built and finished
For an outdoor unit, shell construction and insulation affect running cost as much as the pump rating does. The catalogue lists insulation as an option for this range rather than stating a build detail for this model, so ask the supplier to confirm in writing the shell material and thickness, the insulation method around the shell and base, and the cladding or cabinet material exposed to sun and rain. Request warranty terms for shell, equipment and finishes separately, plus the annual consumable list with prices, so you compare lifetime cost rather than purchase price alone.
6. Freight, packaging and delivery terms
A swim spa is bulky, awkward and expensive to replace if damaged in transit. A usable quote states the Incoterms and destination, the packaging method for the shell, container type and loading plan, whether cargo insurance is included and at what value, and the inspection procedure on arrival. Also confirm how claims are handled if damage is found after the container is opened. If you are sourcing alongside other fit-out items, buying the spa through the same logistics and door-to-door delivery arrangement as your furniture and finishes means one coordinator, one loading plan and one inspection event instead of three.
7. Installation support and after-sales terms
Check what the supplier commits to after delivery: on-site installation or supervision, an inspection and snag list at handover, warranty duration and exclusions for shell, pumps, controller and LED fittings, spare parts availability for the controller and jets, and the response route if a fault appears in the first season. Warranty wording that covers "the product" as one block is less useful than terms written item by item, because pump and controller failures are far more likely than shell failure.
8. Put both quotes on one page
Once you have answers, rebuild each proposal in the same format: model code; shell dimensions and access route; included equipment with quantities; options priced separately; total power with and without heat pump; electrical and plumbing scope split; freight terms and insurance; warranty by component; spare parts price list. Quotes that looked far apart at first reading often turn out to be close once a missing option or an insulation upgrade is added back into the comparison.
- Model code identical on price line, spec sheet, packing list and drawing
- All listed equipment shown with quantities, not grouped as "fully equipped"
- Jet layout drawing supplied, not just a jet count
- Swim training system confirmed in writing as included or not available
- Heat pump, insulation, UV and steps priced explicitly as fitted or optional
- Total power stated for the exact option set you are buying
- Voltage, phase, dedicated circuit and protection split between supplier and your electrician
- Site access, lifting method and foundation responsibility named in writing
- Incoterms, packaging, insurance value and arrival inspection procedure stated
- Warranty written per component, with spare parts prices attached
Frequently asked questions
Is the catalogue size enough for foundation design?
No. Use the catalogue shell size to check the room, then ask for the weight, support point layout and clearance detail before your builder sets out the slab or recess.
Why do two quotes for this model differ so much in price?
Usually because one includes a heat pump, insulation upgrade or sand filtration and the other lists them as options. Always compare the fitted specification, not the headline model name.
Can the specification be changed after the quote is issued?
Yes, but request a re-issued quotation with the revised equipment list and a new total power figure. An email confirming a change is not enough for procurement records or warranty claims.