An illuminated display cabinet looks simple on a drawing: a carcass, some glass, a strip of light. On site it is one of the easiest items to get wrong, because the light, the finish and the joinery all have to agree with each other before production starts. A Santerson Illuminated Display Cabinet is made to measure for residential living projects, with finish, layout and dimensions specified per project. That flexibility is the point of the product, and it is exactly why the finish schedule needs to be closed out item by item rather than assumed.
The list below follows the order a buyer or project manager actually works in: carcass and door finishes first, then glass, then lighting specification, then the hardware and electrical details that sit behind all of it. Each item is something you confirm in writing before an approved sample is signed off.
1. Carcass finish: substrate, surface and edge
"White gloss" from two factories are not the same product. Specify the board substrate, the surface material, the sheen level and how edges are treated. For built-in display units the visible difference is usually at the edges and at rebates where glass sits into the panel.
- Surface type: lacquer, laminate, veneer or solid timber. Each takes light differently, which matters when the interior of the cabinet is lit.
- Sheen: matte, satin or high gloss. Gloss panels reflect the interior lighting back into the display area and can create hot spots on glass.
- Grain direction: state it on the drawing for veneer and wood-effect panels, especially on door pairs and returns.
- Edge treatment: solid timber lipping, matching edge band or mitred edge. Mismatched edge tone is the most common snag on a lit cabinet viewed close up.
- Interior lining: decide whether the inside of the cabinet carries the same finish as the outside, or a contrasting backing that sets off the objects on display.
2. Door and frame finish: profile, glass retention, sightlines
Where the unit has glazed fronts, the door profile and the way glass is held are finish decisions as much as technical ones. Santerson's display cabinet range covers glass front display cabinets alongside open and wall-mounted configurations, so the same project may need several door types reconciled to one finish standard.
- Frame width and rebate depth: confirm on the elevation, since this changes with each profile option.
- Glass seating: how the glass is bedded, set and retained in the frame.
- Mullion and transom positions: mark them against the objects being displayed, not just against the cabinet grid.
- Handle or handleless: integrated profiles, recessed pulls or touch latch all read differently on a lit front.
3. Glass type and how it behaves under lighting
Glass is where most illuminated cabinets disappoint. Tint, reflectivity and edge colour are only visible once the fitting is switched on in the room.
- Tint: clear, low-iron or bronze/grey. Standard float glass carries a green edge that shows through at the panel border.
- Reflectivity: reflective glass in a bright living room can turn the cabinet into a mirror during the day.
- Safety build: confirm toughened or laminated glass and the required thickness for the door size.
- Cleaning access: specify how interiors are reached, because fingerprints on glass inside a lit cabinet are obvious.
4. Lighting specification: the item most often left open
The product page is explicit that lighting specification and electrical details must be confirmed for the project. Treat this as a separate schedule attached to the cabinet order, not as part of the joinery description. Where integrated lighting is specified elsewhere in the same fit-out — for example Santerson Integrated Lighting Systems in an adjacent wall system — put every lit element on one schedule so colour temperature and control match across the room.
| Item to confirm | Why it matters on site |
|---|---|
| Colour temperature | Warm and cool sources side by side look careless; state one value per room. |
| Colour rendering | Low-quality light flattens timber tones and makes display objects look dull. |
| Lumen output and dimming | A cabinet lit for evening ambience needs a different level from one lit to be read in daylight. |
| Light source type and profile | Recessed channel, surface strip or pinpoint fittings each need different carcass detail. |
| Diffuser and line of sight | Specify whether the source is visible from the seating position; an exposed strip shows glare. |
| Driver location and access | Drivers fail before strips do. Name the access panel on the drawing. |
| Voltage and supply | Confirm the destination country's supply, transformer sizing and cable run. |
| Switching and control | Sensor, door-linked or wall switch changes the wiring first-fix stage. |
| Heat and material compatibility | Confirm the source is suitable for the panel and lining material specified. |
| Spares and replacement | Order spare length, driver and diffuser with the unit to avoid mismatched batches later. |
5. Shelf, fixings and load detail
Glass shelves inside a lit cabinet sag visibly under weight over time. Specify shelf material, thickness, span, and the fixing method — concealed brackets, pinned supports or a rebate.
- Shelf material and thickness: glass, timber or metal, stated with the clear span.
- Intended load: state what will actually sit on each shelf, including heavy ceramics and metal objects.
- Adjustability: fixed or adjustable shelving, and whether adjustment is visible from outside.
- Anti-tip and wall fixing: required for tall and wall-mounted units; the fixing substrate must be confirmed on site.
6. Dimensions to confirm against the built opening, not the drawing
Made-to-measure only works if the site dimension is taken after finishes are complete. Record floor level, wall plumb and the position of sockets, switches and first-fix wiring before the cabinet is released for production.
- Tolerance and scribe: how the unit meets an out-of-plumb wall or uneven floor.
- Skirting and architrave: cut around, scribed to, or terminated against — decide before manufacture.
- Clearance for doors and drawers: confirm the swing arc against adjacent furniture and walls.
7. Sample and sign-off sequence
For an illuminated unit, a flat finish sample is not enough. Ask for a lit mock-up or a corner sample with the glass, light source and interior lining assembled as specified, viewed in the same light conditions as the room.
- Finish board: carcass, door and edge, all three together.
- Glass sample: with the actual frame profile and edge condition visible.
- Lit mock-up: one bay built to specification with lighting energised for review.
- Signed approval sheet: listing every confirmed item above, referenced on the production drawing.
Putting it on one page
A practical approach is to issue the cabinet order with two attachments: a finish schedule naming substrate, surface, sheen, edge treatment and glass build; and a lighting schedule covering colour temperature, output, dimming, driver access, supply and control. Buyers ordering built-in pieces as part of a wider fit-out can specify them alongside other built-in furniture, cabinetry and interior fixtures through one manufacturer, so a single production coordination covers the whole joinery package instead of several suppliers reconciling their own details on site.