A wall panel line looks simple on a drawing and complicated on site. Texture direction, panel size, substrate, fixing method and the junction with adjacent finishes all have to agree before production starts. The briefing note below is what we ask for when a project specifies Santerson Textured Panels, so that the quotation, the shop drawings and the delivered panels describe the same wall.
What the product page already fixes for you
Textured Panels belong to our Paneling Systems collection and are made for residential wall system projects. Finish, layout and dimensions are specified per space, and each order is produced as made-to-measure sizing with material and finish options selected against your sample approval. In other words, nothing about the panel geometry or surface is standard: you decide it, we build to it. That flexibility is exactly why a vague enquiry turns into rework — an email that says "feature wall, grey, about 12 square metres" cannot be turned into shop drawings.
If your design intent sits closer to stone or timber than to a formed texture surface, the same catalogue covers those directions as well: Santerson Stone & Marble Panels, Santerson Acoustic Panels and Wall Panel Systems in the Custom Partitions & Paneling range. Send the drawing for whichever line you intend, and we will confirm which collection actually fits the detail.
The five items a usable enquiry must contain
| Item | What to send | Why it changes the result |
|---|---|---|
| Room and elevation drawings | Annotated elevations with overall wall width and height, plus a marked layout grid showing panel widths and joint positions. | Made-to-measure panels are cut from these dimensions. Unmarked walls become assumptions we have to guess at, and the guess is usually wrong at corners. |
| Texture direction | A reference image or sample number, plus how deep and how directional the relief should read — fine ribbed, broad fluted, soft stone-like, geometric relief. | The same colour looks different at each relief depth. Lighting angle changes the shadow line, so a photo taken under showroom spots rarely matches a corridor with recessed downlights. |
| Colour and surface | Paint or laminate system, sheen level, and whether the field colour continues into the joints and edges. | Sheen drives how visible the texture is. A matte field reads flat under strong light; a satin field emphasises every ridge. |
| Substrate and fixing | What the panels go onto — framed partition, masonry, existing finish — and whether you want adhesive, mechanical fix or a battened cavity. | This decides panel thickness, edge detail and whether services can run behind the wall. It is also what your local installer needs to see before quoting labour. |
| Junctions and openings | How the panel meets skirting, ceiling, architrave, window reveals, switch plates and any concealed door. | Cut-outs and trims are where a panelled wall looks cheap or precise. Send the detail you want; we will match it in production. |
Send the site photographs, not only the render
Renders show intent; photographs show reality. Wall flatness, floor level and the position of existing services are the three things that most often differ from a drawing, and all three affect panel layout. A short set of photos of each wall, plus one photo of an existing corner or reveal in the same building, tells us more than a paragraph of description.
For renovation work, also state what happens to the existing finish — stripped, overboarded or left in place. Panel thickness and batten depth follow from that decision, and it affects door and architrave reveals on the same wall.
Sample approval before production
For a textured surface we recommend approving a physical sample before the panels are released to production. Photographs compress relief, and colour shifts between screen and material. When you request the sample, tell us the sheen and the lighting condition of the room so the sample is meaningful when it arrives.
A practical rule: quote from a marked-up elevation, produce from an approved shop drawing, deliver against a signed sample. If any one of those three is missing, expect at least one change order.
What we return to you
Once the enquiry is complete, you receive an itemised quotation with panel sizes and finish references, shop drawings for your sign-off, and a production schedule tied to your delivery date. Panels ship packed for the layout rather than as generic sheets, so the joint pattern arrives already resolved. As part of our Custom & OEM Service, we can also produce matching elements in the same finish — niche joinery, concealed doors and integrated storage fronts — so one texture runs across the whole wall instead of stopping at a frame.
Questions worth answering in the first email
- Which rooms, and how many square metres per elevation rather than one total figure?
- New build or renovation, and what is behind the wall face?
- Any part of the wall that must stay accessible — switches, inspection panels, TV mounting, hidden storage.
- Who installs on site: your contractor or a team we coordinate with under our installation support.
- Whether the same finish continues into other rooms, which affects batch consistency and spare panels.
Where to start
Send drawings, photographs and one texture reference, and we will come back with a quotation that names the actual panel sizes and finish rather than a rounded estimate. If you are still weighing the wall direction against other finishes in the project — flooring, cabinetry, ceiling — our design and coordination team can review the full package together, so the wall does not get specified in isolation. That single step is what keeps a textured feature wall consistent from the sample to the handover.