A bar unit is one of the fastest ways to make a villa living area feel finished — and one of the easiest items to get wrong. Glass that is too clear, a worktop that clashes with the kitchen, a fridge cavity that will not take the appliance on site: all of these come from a brief that was too thin. If you are specifying Santerson Integrated Bar Systems for a home or hospitality project, this guide sets out exactly what to send us so the first quotation is close to the final one.

Where to start: choosing the custom bar configuration

In our catalogue, Santerson Integrated Bar Systems sits in the Built-in furniture / Bar Cabinets group. Every item in that group is made to measure: sizing, material and finish are chosen per project, and the layout is drawn around the room rather than picked from fixed widths. The same configuration logic applies across the collection — Santerson Compact Bar Cabinets, Santerson Glass Front Bar Cabinets, Santerson Island Bar Units and Santerson Wall Mounted Bar Units.

So before you write a single sentence of the brief, decide which form the bar takes. A full-height unit that reads as part of the wall behaves differently from an island unit that people walk around, and a wall-mounted unit changes what the substrate behind it has to carry.

FormBest suited toWhat the brief must add
Floor-to-ceiling integrated systemLiving walls, media walls, lounge areas in villas and hotel floorsWall build-up, skirting and cornice treatment, where services run behind the unit
Island bar unitOpen-plan kitchens and entertaining islandsClearance on each side, seating overhang, which appliances face which aisle
Wall-mounted unitCompact entertaining corners, guest suites, bars with limited floor areaSubstrate type and fixing positions, permitted depth and projection
Glass-front or compact cabinetDisplay of glassware and bottles next to dining spacesGlass type, internal shelf spacing, lighting wiring route

Section 1: the room, not just the unit

Send the drawings you already have — floor plan plus at least one elevation of the wall the bar will sit on. We need overall length, height and depth, and we need to know what the unit is meeting on both sides: a return wall, a window reveal, a kitchen run, an opening.

  • Floor finish and its thickness at the line of the unit, because it decides whether plinths are scribed on site or built into the carcass.
  • Ceiling condition: flat, coffered, tray, or with a service void. This decides whether the unit stops below the ceiling or is detailed to the soffit.
  • Existing or planned services behind the wall — power, data, water for an ice maker, extraction if there is a grill or hob element.
  • The finish palette of the adjoining joinery, with sample references rather than colour names alone. "Matte grey" means different things to different factories.

Section 2: how the bar will be used

Layout follows service. Tell us in plain language what happens at this bar, and we can translate it into storage zones and worktop length.

  • Bottles standing, bottles racked, glassware hung, or all three — and roughly how many of each.
  • Whether there is a working prep area: cutting board space, sink cut-out, appliance cavity. If yes, name the appliance models now, because cavities are built around them.
  • Glasshouse needs: clear glass to show contents, bronze or smoked glass to soften them, ribbed glass for texture, or solid fronts that hide everything.
  • Who opens it — homeowners, housekeeping, bar staff. This changes hardware choice and how deep a drawer can comfortably travel.

Section 3: materials, finishes and hardware

Our Custom Furniture Materials and Finishes work covers carcass boards, door substrates, surface finishes such as lacquer, acrylic, melamine, PVC and wood veneer, plus metals and engineered stone for tops. For bar units specifically, name:

  • Carcass — board type and edge treatment, especially in humid climates or near a poolside terrace.
  • Doors and fronts — profile (flat panel, shaker, paneled), finish, sheen level, and handleless or handled.
  • Glass — clear, bronze, smoked, frosted or ribbed, plus thickness where the frame requires it.
  • Worktop — engineered stone, laminate, metal or timber, with edge profile and any sink or appliance cut-outs marked on a drawing.
  • Hardware — hinges, runners, soft-close, integrated pulls, and any specialty bottle or glass racks you want supplied or fitted on site.

If you have a finish board or a photo of an installed reference, send it. A physical sample reference settles more arguments than a written specification.

Section 4: lighting and electrical

Bar units fail most often on light and power, because these are usually decided after the carcass is drawn. Decide them in the first round. Shelf lighting, vertical cove lighting and lit glass cabinets all need cable routes, transformer positions and a switch or dimmer location agreed before production. Our Santerson Integrated Cabinet Lighting range is configurable, but electrical specification and compatibility are confirmed against each cabinet design — so send voltage, control preference and the local supply standard for the project country.

Also state what sits inside: wine conditioning units, beverage fridges, ice makers. Their dimensions, ventilation requirements and door swing direction determine cavity sizes, and changing them after production is costly.

Section 5: quantities, phasing and site sequence

Give us a schedule rather than a single number: how many of each configuration, which rooms they belong to, and which units are needed first. On multi-unit residential work it is normal to release bar and joinery packages in phases so that one show unit can be approved before the rest are produced.

Send with your enquiry:

  • Plan and elevations, with dimensions to the line of the unit
  • A schedule listing each configuration, quantity and room
  • Finish references (sample codes or physical boards)
  • Appliance model list with dimensions and door swings
  • Lighting and power layout, including control preference
  • Delivery address, Incoterms preference and required on-site date
  • The trade or site team the units will be handed to for fitting

Confirming the custom Santerson Integrated Bar Systems specification

Because Santerson Integrated Bar Systems are made to measure, we do not quote from a catalogue line. Your information goes into the same sequence we use for other Turnkey Interior Project Solutions: brief and design proposal first, then quotation with detail confirmation, then production, shipment and follow-up. Under that workflow you can expect:

  • A layout drawn to your dimensions, with storage zones matched to the service pattern you described.
  • A specification sheet listing carcass, fronts, glass, worktop and hardware, so substitutions are visible rather than buried.
  • Confirmation of dimensions and selected specifications for each configuration before cutting starts.
  • Packaging marked per unit and per room, which matters when several bar units go to the same building.

Send appliance models, glass type and finish references in the first message. Those three items are what separate a quotation you can approve from one you have to reopen.

What we will ask you back

Expect us to come back with questions rather than an instant price. Typical ones: Is the wall straight and plumb, or is a site survey needed? Is the worktop supplied by us or cut locally? Are the electrical feeds already in position at first fix, or will they be moved? Should the unit be assembled in the factory and shipped whole, or flat-packed for a tight service lift? None of these are obstacles — they are the points that decide fit.

Product pages show one configuration per line. Treat the images as a starting shape, not a fixed specification; dimensions, materials, finishes and hardware are confirmed for each project.

FAQ

Can an integrated bar system match existing kitchen cabinetry?

Yes, when you send the adjoining joinery specification — door profile, finish code, handle style and carcass colour. We build to that reference so the bar reads as part of the same run.

Which is easier to install, a wall-mounted unit or a floor-standing system?

Floor-standing units need levelling and scribing but no structural support. Wall-mounted units are lighter to handle but require a sound substrate and correct fixing positions, which must be shown on your drawings.

Can I order one unit first before committing to a whole project?

Yes. Phased release is common: produce an approved sample configuration, review it, then release the remaining quantities against the same specification.

What if my brief changes after production starts?

Changes before detail confirmation are normal. After cutting has started, they become a variation with cost and schedule impact — which is why the detail-confirmation stage exists as its own step.

Figures and specifications in this article are not fixed values. Dimensions, materials, finishes, hardware, electrical ratings and delivery arrangements are confirmed per project against your drawings and our current production options.