High gloss PVC cabinet doors look deceptively simple on a drawing. An elevation drawing shows four rectangles in a shiny finish, and the order looks straightforward until the site team discovers that two doors were cut to different sizes, one panel arrived without its edge banding direction noted, and the splashback rebate is missing altogether. Quantities and coordination are where gloss kitchen projects either hold together or fall apart. The steps below follow how we run these orders as a one-stop furniture and building materials supplier, from the first measurement sheet to the handover list.
Start With Openings, Not Door Counts
Most quantity errors begin when a take-off is done from a plan drawing instead of verified site dimensions. Gloss PVC fronts are made to measure, so the numbers that matter are the finished opening widths and heights after wall finishes, screed and tiling are complete — not the structural shell dimensions. Before any panel is cut, confirm four things for every run:
- Finished floor level and ceiling line. Floor-to-ceiling tall units change height when a screed or raised access floor is added late in the programme.
- Appliance schedule. Built-in ovens, dishwashers, column fridges and wine cabinets set carcass widths. Confirm the model reference before ordering the surrounding units, not after.
- Splashback and worktop interface. Worktop thickness, splashback height and any rebate behind the hob need to be on the same drawing as the base units.
- Service points. Sinks, taps, extractor ducting and power outlets drive drawer layouts and cut-outs. Moving an outlet by 50 mm can change a three-drawer bank into a two-drawer bank.
Once the openings are fixed, count in carcasses rather than doors. A single tall unit may carry two gloss doors, an integrated panel and a vented plinth; if you order by door count alone, the carcass hardware and scribe panels get missed.
Break the Take-Off Into Six Line Groups
Splitting the bill of quantities into six groups makes shortages visible before production starts, rather than at handover. For a high gloss PVC cabinet package we normally schedule:
| Line group | What to quantify | Frequently missed |
|---|---|---|
| Carcasses | Base, wall, tall and pantry units by width and height; island and peninsula runs | Scribe and filler panels at uneven walls; plinth and end panels in matching finish |
| Doors and fronts | Door size, hinge side, opening direction, grain or sheen direction | Handleless profile lengths; integrated appliance fronts that must match the adjacent gloss doors |
| Interior fittings | Drawers, pull-out trays, pantry towers, corner mechanisms, tray dividers | Soft-close hardware on wide drawers; load rating for pantries |
| Worktops and splashbacks | Lengths with cut-outs, edge profile, joint positions | Joints hidden away from the main sightline; cut-outs for hob and sink on the correct face |
| Lighting and electrics | Cabinet lighting channels, transformer positions, switch locations | Feed cables routed before doors are hung; dimmer compatibility |
| Site sundries | Silicone, trims, protective film, touch-up kit | Spare door or two for the maintenance store on multi-unit jobs |
On apartment and villa schemes with repeated kitchen types, produce one prototype kitchen first. Everything downstream — tolerances, joint details, hardware choices — is cheaper to correct once.
Coordinate the Gloss Finish With the Rest of the Package
Gloss PVC reads as part of a wider interior, not as an isolated item. Reflections pick up adjacent surfaces, so finish coordination has to happen at the same time as the quantity take-off, or the site team ends up matching colours after the fact.
Match Sheen Against Neighbouring Surfaces
A high gloss front beside a satin wall panel or a matte floor tile will look brighter than it does on the sample board. Set gloss fronts, wall panels, doors and joinery on one finish schedule with physical samples laid side by side under the actual site lighting. Where a project mixes finishes deliberately — gloss tall units with matte PVC cabinets on the run of base units — record which finish belongs to which elevation, because samples alone will not settle that question.
Align Cabinet Lines With Flooring and Ceilings
Tall units look wrong when their vertical joints clash with a plank joint or a ceiling grid. Confirm the setting-out of engineered flooring and any linear ceiling panel before finalising cabinet widths, so joints in one trade fall into the same rhythm as the next.
Fix Hardware and Appliances Early
Hinge type, drawer runner brand and appliance model all change cut-outs and clearances. As a China furniture manufacturer working on custom and OEM orders, we build these selections into the shop drawings so that hardware, integrated panels and lighting arrive in the same container rather than as separate late shipments.
Sequence Production, Packing and Delivery Around Site Access
Gloss fronts are the part of a kitchen most easily damaged in transit, so packing and delivery sequence matter as much as the order itself. Three practical rules:
- Pack by room and elevation. Crates labelled per unit type and per floor let fitters open what they need without unpacking the whole kitchen, which is where most edge chips happen.
- Deliver carcasses before doors. Carcasses can be levelled and fixed while gloss fronts stay protected in the store until the wet trades have finished. Hanging doors early exposes them to paint, plaster dust and knocks.
- Protect the sheen on site. Keep protective film on until handover, and specify a cleaning method for the maintenance team — gloss surfaces show every abrasive wipe.
For projects overseas, this sequencing has to be built into the shipping plan from the start. Our logistics and door-to-door delivery service covers freight booking, packing lists, container loading and customs paperwork, so a kitchen package can arrive in the order the site needs it rather than as one mixed drop.
Sign Off With a Snag List, Not a Handshake
Close-out on a gloss kitchen is short and specific. Walk each run with the drawings and check: door alignment and gap consistency along the whole elevation; no visible edge-chipping or film residue; every drawer and hinge cycling smoothly; lighting circuits working at the switch, not just at the feed; and cut-outs for hob, sink and appliances seated correctly. Record any replacement panels against the same line codes used in the bill of quantities, so a later order matches what was actually installed rather than what the original drawing said.
Send us your drawings and appliance schedule and we will return a made-to-measure cabinet package with quantities checked against your elevations — including hardware, worktops and integrated lighting in one shipment.