What Procurement Risks Should Teams Review Before Ordering Santerson Glass Folding Doors?

Glass folding doors look simple on a drawing: a run of glazed panels, a track, a stack. On site they are one of the few openings where architecture, joinery tolerance and hardware all have to agree. This article sets out the procurement risks our project teams review before an order is placed, so that buyers, contractors and interior practices can compare like with like.

Why a folding door carries more risk than it appears to

A hinged door fails quietly; a folding door fails loudly. Panels hang from an overhead track and fold against each other dozens of times a day, so any error in the opening — out of level, out of plumb, or an insufficient head height for the stack — shows up immediately as binding panels or a gap that will not close. Once the frame is fixed into a finished opening, correcting it usually means removing linings and making good surrounding finishes.

Our Santerson Glass Folding Doors are made to measure for residential projects, with the finish, layout and dimensions specified per project rather than chosen from a fixed size range. That flexibility is the point of the product, and it is also why the specification conversation has to be finished before production starts.

Risk 1: the opening is measured at the wrong stage

The most common avoidable problem is an order placed against structural openings rather than finished ones. Floor screed, wall lining, tile thickness and ceiling build-up all change the net opening. We ask for dimensions taken after the surrounding finishes are set, or a clear written allowance from the site team for what is still to come.

  • Confirm the finished floor level along the whole run, not just at one end.
  • Confirm head height including track zone and any ceiling detail above it.
  • Check wall build-up on both jambs — a frame needs something solid to fix to.
  • Flag any underfloor heating, skirting or drainage channel that crosses the opening.

Risk 2: layout and stack direction are left to the drawings alone

Panel count, panel width and where the doors fold to all change how the run works in use. A folding wall that stacks across a circulation route, or that folds away from the furniture arrangement shown on the interior layout, will be blamed on the product.

Before we quote, we want three things: which panel is the master (active) leaf, whether the stack folds into or out of the room, and how much clear wall is available to receive it. Where the layout is tight, a glass sliding door or a pocket arrangement may serve the same opening better — worth deciding in the design stage rather than after an order.

Risk 3: glass and hardware are specified as one line item

A single line on a bill of quantities hides three separate decisions, and each one affects price and lead time:

ElementWhat to pin down before ordering
Glass make-upClear, frosted or tinted; single or laminated build-up; whether any panel sits where safety glazing is required by the local authority.
Frame and finishFrame colour and surface treatment matched to the joinery package, not chosen independently of it.
Hardware and trackTrack type, wheel specification, threshold detail and whether a bottom guide is needed for the run length proposed.

Where a project needs doors to coordinate with other openings in the same building, we produce them as part of the wider joinery and interior fixtures package. Ordering doors, folding and hinged joinery together from one furniture and building materials supplier removes the argument on site about which trade owns the tolerance.

Risk 4: nobody signs off the drawings before production

Made-to-measure work has no returns window. We issue shop drawings showing panel layout, opening direction, handle positions and frame details; the buyer or their site team should return them signed, with any coordination notes from the architect or M&E consultant attached. A drawing reviewed by one person only is a known source of change orders.

Risk 5: freight and site storage are not planned

Glazed frames are heavy, awkward and fragile, and they arrive on a pallet that will not fit through a standard internal door. Confirm the delivery point, whether a crane or lift is needed, and where the panels will stand until installation — flat and dry is not suitable for glazed leaves. For international projects we handle freight forwarding, export paperwork and door-to-door delivery as part of the order, but the last leg to the opening still needs a plan from the site team.

Risk 6: installation is treated as the supplier's problem

Folding doors need a level track and a frame fixed plumb along its full height. Decide in advance who sets the frame, who makes good around it, and who commissions the movement after fixing. We provide installation support and after-sales service; what we cannot do from a distance is correct a substrate that was never ready.

A short pre-order checklist

  • Finished-opening dimensions signed off by the site team.
  • Panel layout, stack direction and available stacking wall confirmed.
  • Glass make-up agreed, with any safety-glazing locations marked.
  • Frame finish cross-checked against the joinery schedule.
  • Shop drawings returned signed, not annotated verbally.
  • Delivery route and storage location agreed.
  • Responsibility for setting, commissioning and making good named.

Note: glass build-ups, hardware series, maximum panel dimensions and any performance or compliance testing depend on the configuration selected for your project. We confirm these in writing against your drawings before production; nothing in this article should be read as a standard specification.

Send us the opening. Share finished dimensions, a layout sketch and the joinery schedule, and our project team will return shop drawings with a configuration that fits the opening rather than a catalogue size.