A quotation for the washdown one piece toilet, model 1003A usually comes back within a day when the buyer supplies six items up front: trap type and rough-in dimension, quantity per bathroom type, glaze and colour preference, packaging and marking requirements, delivery terms, and the destination port or site. When those details arrive together, the factory can lock the ceramic specification, carton count and container loading plan in one pass instead of trading three rounds of clarification emails.

Why the Same Toilet Model Produces Different Quotations

Buyers are often surprised when two enquiries for model 1003A return different prices. Nothing about the bowl changed. What changes is everything wrapped around it: which trap geometry was selected, how many pieces sit in one carton, whether the glaze has to match an existing hotel wing, and how far the goods have to travel. A sanitary ware line is a heavy, fragile, low-value-per-cubic-metre shipment, so packaging volume and handling rules move the unit price more than most buyers expect.

The 1003A itself is fixed in its basics: vitreous ceramic with a glossy glaze, a one-piece seamless body between tank and bowl, and washdown flushing. What a supplier genuinely needs from you is the information that sits outside that fixed core.

1. Trap Type and Rough-In Dimension

This is the single most important line in the enquiry, because it determines which moulding and which internal waterway you receive. The 1003A supports two installation types:

  • P-trap, wall drain — 180 mm rough-in, measured from the finished floor to the centre of the waste outlet in the wall.
  • S-trap, floor drain — 250 mm rough-in, measured from the finished floor to the centre of the waste outlet in the slab.

Send the dimension as a finished-floor figure, not a structural slab figure. A tiler working off an unfinished-slab measurement will shift the outlet by 15–20 mm, and a toilet bought to the wrong rough-in cannot be corrected on site without moving pipework. If your project mixes both conditions — for example wall-drained guest WCs and floor-drained ensuite bathrooms — state each quantity separately. Suppliers price and pack the two variants as distinct line items even when the visible ceramic is identical.

If you are unsure which trap your drawings call for, send the bathroom layout or a photograph of the existing waste outlet. A factory that runs sanitary ware production can read the condition from either; guessing in the enquiry is what causes returns.

2. Quantity, Split by Room Type

Give quantity per room type rather than one project total. A hotel tender typically needs 40 pieces for guest ensuites, 6 for public restrooms and 4 for staff facilities, and those rooms often carry different accessories or finish levels. A villa project may need matching ceramics across several bathroom designs plus a separate set for the pool WC.

Also state whether you want spare units held for future maintenance. Hotels commonly order a small percentage as spares so that a replacement bought two years later matches the original glaze and waterway rather than a revised moulding.

3. Glaze, Colour and Surface Detail

Standard specification is white with a glossy glaze chosen to resist staining and yellowing under routine cleaning. Confirm three things in writing if your project deviates from that:

  • Colour — whether the whole order is one colour or split across bathroom types.
  • Seat and cover — included, supplied loose, or omitted so you fit local seats on site. State hinge material and soft-close requirement if a seat is included.
  • Flush mechanism and button — the actuator style and whether a single-flush or dual-flush arrangement is required for the market you are shipping into.

Colour matching across batches is the usual source of complaint on ceramic orders, so if a specific white tone matters, say so before production starts rather than at inspection.

4. Packaging and Marking

Packaging choices change both the price and how many pieces fit your container, so they belong in the enquiry, not in a later email. Useful points to specify:

  • Retail carton, plain brown export carton, or neutral packaging for onward wholesale.
  • Whether cartons must carry your item codes, barcodes or batch marks for warehouse receiving.
  • Palletised or loose-loaded, and whether you need corner protection for site storage.
  • Marking of trap type on each carton. On mixed P-trap and S-trap orders this prevents the wrong variant reaching the wrong floor.

5. Delivery Terms, Destination and Handling

State the Incoterm you want quoted, the destination seaport, and — if goods go straight to a site rather than a port — the delivery address and whether the site accepts container traffic. Sanitary ware is breakable and heavy for its volume, so the loading plan matters: ask for the pieces-per-container figure with the price, because that number is what tells you whether your unit landed cost is competitive.

For multi-phase projects, say which quantities are needed in which phase. A phased release lets the factory schedule production runs to match site progress instead of asking you to store a full project order for months.

6. Documentation and Compliance Requirements

List the paperwork your customs broker and client require: commercial invoice, packing list, certificate of origin, and any test or conformity documents your specifier has written into the project. The 1003A detail page records CE certification for this model; treat that as a specification point to confirm against current documentation for your market rather than assuming it covers every destination.

If your client's specification names water-efficiency or flushing-performance criteria, send the exact clause text. Flushing terminology and test methods differ by market, and a supplier quoting from the clause can confirm whether the standard washdown arrangement satisfies it or needs an alternative.

How the Information Maps to the Quotation

What you supplyWhat the supplier prices from it
P-trap 180 mm or S-trap 250 mm, per room typeMoulding and waterway variant, separate line items, carton marking
Quantity split by bathroom type, plus sparesProduction batch size, spare-mould planning, price band
Colour, seat inclusion, flush actuator styleComponent set per unit, assembly steps, colour-run scheduling
Packaging and marking rulesCarton spec, pieces per container, loading plan, landed cost
Incoterm, destination port or site, phasingFreight basis, release schedule, storage exposure
Required certificates and specification clausesTesting and documentation scope, any specification adjustment

Ordering One Toilet Model Inside a Larger Fit-out

Most 1003A enquiries do not arrive alone. They come as part of a bathroom package that also carries basins, shower sets and cabinetry, and coordinating those items with one supplier reduces the number of separate deliveries landing on site. Within our bathroom sanitary fixtures range you can specify matching wall-hung basins and pedestal basins alongside the WC, which is how hotel projects keep the ceramic tone consistent across every washroom in a wing.

Where a project needs more than ceramics — vanities, wall panels, lighting for the same bathrooms — buyers working through a one-stop furniture and building materials supplier place those items against one production and shipping schedule. That is also where custom and OEM work sits: bespoke finishes, private labelling and flexible minimum order quantities are handled through our custom and OEM service, with the enquiry details above forming the starting brief.

A practical sequence: send trap type and rough-in, quantity by room type, glaze and seat requirements, packaging rules, destination and Incoterm, plus required documents. Ask for pieces per container with the price. Confirm the specification in writing before production starts, and inspect against that written sheet rather than a sample chosen informally.

Send your enquiry details

If you are specifying sanitary ware for a hotel, villa or commercial restroom project, prepare the six items above and send them with your drawings. We will confirm the specification, packaging plan and container loading before production is scheduled.