A classic panel hinged door only looks right when the plan behind it is complete. Panel mouldings, frame depths and swing direction all have to be settled before the opening is measured, or the finished line of the door will fight the wall around it. Below is the checklist we work from on residential projects, ordered the way decisions actually have to be made.
1. Door schedule: one line for every opening
Before anything else, list each door as its own item. A door schedule is the document that keeps a project from drifting, and it should record, per opening:
- Room or location reference tied to the drawing set
- Clear opening size and finished floor level at that opening
- Leaf count — single or double, and which leaf is active where a pair is used
- Hinge hand and swing direction, checked against furniture and circulation
- Panel layout: number of panels, panel proportions, stile and rail widths
- Frame type and wall build-up it has to sit in
- Finish — veneer species, paint colour or lacquer specification
- Ironmongery set: hinges, handle, lock body, strike, door closer if required
Anything left off the schedule gets decided on site, and on-site decisions are where cost and delay appear. Our Classic Panel Hinged Doors are made to measure, so the schedule is what we quote and produce against.
2. Site survey and dimensional verification
Drawings give you nominal sizes; a survey gives you real ones. The plan must state who surveys, when, and against which reference lines. What to capture:
- Floor-to-floor and floor-to-soffit heights at each opening, not just one per floor
- Wall thickness and plumbness along the reveal — old walls are rarely parallel
- Squareness of the opening head and jambs
- Position of skirtings, architraves, cornices and any adjacent returns
- Clearances for flooring build-up that has not yet been laid
For panel doors this matters more than for flat ones. A jamb that is out of plumb shows as an uneven reveal against the panel edges, and it cannot be disguised by the architrave once the door is hung.
3. Frame, wall build-up and fixing detail
The plan has to match the frame to the wall it goes into. Specify the wall type at each opening — masonry, stud partition, or a joinery panelled surface — and the finished thickness including plaster, tile or cladding. Then fix the detail:
- Frame depth equal to the finished wall thickness, with architrave on one or both faces
- Whether the frame is set proud, flush or recessed relative to the wall face
- Concealed fixings versus fixed and filled-and-painted fixings
- Head and sill detail where a threshold or flooring transition occurs
- Acoustic or fire-rating requirements at specific openings, if the project has them
Where doors sit in panelled or veneered surfaces, coordinate them with the surrounding joinery early. Our Wood Veneer Hinged Doors are usually specified alongside wall panelling and cabinetry so the grain, sheen and edge profile read as one family.
4. Ironmongery and clearance schedule
Hinges decide how a panel door hangs and how heavy it can feel in use. The plan should lock down:
- Hinge type, count and position — matched to leaf weight and daily use
- Finish of ironmongery, kept consistent across the whole set of doors
- Lock case backset and latch position, marked before the leaf is machined
- Handle height and clearance from panel edges, so hardware does not break a moulding
- Swing path: no clash with switches, radiators, furniture, curtains or another door
- Wall protection and stop position where the leaf meets a wall when open
Getting this into the plan before production avoids re-machining panel edges, which on a moulded panel leaf is usually a remake rather than a repair.
5. Finish sequence and site protection
State in the plan whether doors arrive pre-finished or are finished on site, and who protects them afterwards:
- Factory-applied finish with transport protection, or primed leaves for site painting
- Veneer matching against floors, wardrobes and panelling specified for the same project
- Order of works: wet trades complete, flooring laid, then doors hung
- Protection during the remaining fit-out, and who removes it
6. Delivery, storage and hanging sequence
Doors arrive flat and need space. The plan should name the delivery window, the receiving party, and where the leaves are stored — indoors, off the floor, acclimatised to the building's conditions rather than left in a container or an unheated store.
| Stage | What is confirmed | Owner |
|---|---|---|
| Freight and customs | Mode of transport, documentation, who clears import | Supplier and buyer per contract terms |
| Site readiness | Openings complete, flooring laid, wet trades finished | Contractor |
| Storage | Indoor, dry, flat stacked, acclimatised | Contractor |
| Hanging sequence | Floor by floor, opening by opening, per the schedule | Installers |
7. Handover inspection and sign-off
Close the plan with a defined check for each door, recorded against the schedule number:
- Reveals even on both jambs and at the head
- Leaf closes without binding, and stays put where it should
- Latch and lock engage cleanly with no forcing
- Ironmongery aligned, fixed tight, finish undamaged
- Architrave scribed to wall with no visible gaps
- Finish free of marks; any touch-up agreed and logged
- Spare keys, hardware spares and maintenance notes handed over
Where a manufacturer's plan helps
On projects where doors, wardrobes, panelling and cabinetry come from one source, the schedule is written once and reused across trades, which removes most of the coordination risk. That is how we work as a furniture and building materials supplier: survey data goes into made-to-measure production, then the same schedule drives packing lists, delivery sequence and installation. The Windows and Doors range covers hinged, sliding, folding and concealed doors for residential work, all specified to project dimensions and finish.
If you are assembling a door schedule for a villa or apartment project, send the drawing set and opening list and we will return a schedule with sizes, frame details and finish options marked up for your review.
SANTERSON — custom furniture and building materials manufacturing, with production coordination, logistics and installation support for residential and hospitality projects.
Contact: PHILLIP | Phone / WhatsApp: +86-13928214007 | Email: santerson@qq.com
Send drawings and opening schedules for a made-to-measure quotation.