A media unit that mixes open shelving with closed cabinets looks simple on a drawing, which is exactly why quotations for it diverge so much. Two suppliers can both promise a "combination unit to suit your wall" and deliver completely different furniture, because the open-to-closed ratio, the substrate behind the finish, the hardware grade and the cable provisions are decided in the quotation, not in the sketch. If you are specifying Santerson Open & Closed Combo Units for a villa living room, an apartment handover or a hospitality lounge, this article walks through what to request as a sample and how to read the proposal line by line before you place the order.
What You Are Actually Buying in This Product Family
Santerson Open & Closed Combo Units sits in the TV Cabinets / Media Units range and is described on its product page as a configurable media unit that combines open and closed storage, with finish, layout and dimensions specified to suit each space. There is no single fixed model number to compare against, and that is deliberate: the units are made to measure for the wall they sit on, so your quotation is the specification document.
The same configuration logic runs across neighbouring listings you may also be quoted against — Santerson Mixed Open & Closed Storage in the Integrated Storage Walls collection, and Santerson Mixed Open & Closed Systems in Modular Living Systems. Their pages list made-to-measure sizing with material and finish options. Because the detail pages carry limited technical data, each listing tells buyers to confirm dimensions, materials, hardware, safety and lighting specifications for the chosen configuration. Treat that as a checklist of what your proposal must state in writing.
Read the Proposal Line by Line
Comparing two proposals only works when both are written to the same structure. Ask each supplier — including ours — to price against the following items, and reject any quotation that bundles them into one lump sum.
| Line item | What the proposal must state | Where prices usually diverge |
|---|---|---|
| Layout and open/closed ratio | Elevation drawing with overall width, height and depth, plus which bays are open shelves and which are doors or drawers | A cheaper quote often quietly reduces closed storage, because carcass panels, doors and hardware carry most of the material cost |
| Substrate and finish | Board type behind each visible surface, plus the exact finish: laminate, lacquer, veneer or wood, with a reference you can match on site | Two quotes that both say "matte grey" can be built on different substrates and edge treatments at very different cost |
| Doors and drawers | Door construction, hinge and slide brand or grade, soft-close inclusion, handleless or handle detail | Hardware is the first place a quotation gets trimmed; confirm soft-close and cycle-rated fittings are actually included |
| Open shelving | Shelf span, panel thickness, deflection limits for the load you intend to store, and bracket or hidden-support method | Long unsupported spans look identical in a render but need thicker panels or intermediate supports |
| TV zone and services | Mounting method and substrate for the screen, cable routing positions, socket and device locations, ventilation for equipment inside closed bays | Ventilation and a reinforced mounting panel are small costs that get omitted from thin quotations |
| Integrated lighting | Whether LED strips or profiles are included, driver location, switching or dimming control, and who supplies the electrical connection on site | If your comparison also includes Santerson Integrated LED Media Units, check whether lighting is priced in the unit or added as a separate line |
| Scope and delivery | Whether the price covers production only, or also packing, freight to your port or site, installation and after-sales support | A low unit price with sea freight and installation excluded is not a lower total cost |
Santerson's service pages describe the wider scope you can ask to be priced in: design consultation and space planning, material selection and product specification, manufacturing with quality control, project management and site coordination, and final installation and handover. Logistics is listed separately as freight forwarding by sea, air or rail with customs paperwork, packaging and container loading, shipment tracking and door-to-door delivery. Installation and after-sales cover on-site installation, inspection and snags, warranty coverage, spare parts and maintenance. Ask for each of these as a numbered line with its own price, and confirm commercial terms such as Incoterms, duties and insurance for your specific destination rather than assuming what the marketing pages imply.
Request Samples Before You Approve Production
For made-to-measure joinery, a sample is not a nice extra — it is how you test the parts of the proposal that drawings cannot show. For Open & Closed Combo Units, request three things.
1. A finish board, not a brochure photo
Ask for physical samples of every visible surface in your specification: door face, carcass edge, shelf panel and any contrasting internal colour. View them next to your flooring, wall finish and lighting plan, because the same lacquer reads differently under warm villa lighting than under a showroom strip light. Where a project requires an exact match to an existing interior, ask for a bespoke material finish; Santerson's Custom & OEM service lists bespoke finishes and textures alongside custom furniture design and prototyping.
2. A hardware and construction sample
Ask for one door or drawer built to your specification so you can open it, close it and check the edge banding, the reveal between doors and the feel of the mechanism. If soft-close is quoted, test it on the sample. This is also where you confirm that the closed bays are built as described rather than as a facade.
3. A mock-up of one open bay at full span
Open shelving is where an attractive unit fails in daily use. Confirm the shelf span and panel thickness from your proposal, then ask how that span behaves with the load you actually plan to store — books and equipment are far heavier than styled display objects. If the answer is not clear in writing, adjust the span or add supports before production, not after installation.
A practical rule: if a supplier will not send finish and hardware samples, or cannot state substrate, hardware grade and shelf span in the quotation, you are comparing an image rather than a product. Ask for those four items in writing from every bidder, and the comparison becomes straightforward.
A Side-by-Side Comparison Worksheet
Use this structure when you have two or more proposals on the desk. Fill it in from the documents themselves; anything a supplier refuses to commit to in writing should be recorded as excluded, not assumed.
Overall dimensions and elevation drawing reference number — same revision in both quotes?
Open bays versus closed bays: count and ratio identical in both?
Substrate named for each visible surface, with finish reference supplied as a physical sample?
Hinge and slide brand or grade, soft-close included, handle detail specified?
Shelf spans, panel thickness and stated load allowance recorded?
TV mounting method, cable routes, socket positions and equipment ventilation shown on the drawing?
Lighting: included or optional, driver location and control method named?
Delivery scope: ex-factory, FOB, CIF or door-to-door, and who handles customs clearance?
Installation, snag inspection, warranty terms and spare-parts support priced separately?
Lead time stated as production time plus transit, with the shipping mode named?
Common Gaps That Distort the Comparison
- Different wall systems priced against each other. A media unit, a full-height storage wall and a modular living system are not interchangeable substitutes. If one bidder quoted Santerson Full Height Media Walls while another quoted a floor-standing combo unit, normalise the scope before comparing figures.
- Hidden surcharges for cut-outs and penetrations. Cable grommets, socket cut-outs, skirting relieves and uneven-wall scribes are routine on site and routinely unpriced.
- Finish upgrades priced late. A quotation built on a standard laminate can rise sharply once a veneer or lacquer finish is requested; agree the finish at sample stage.
- Freight and installation bundled invisibly. Compare delivered-and-installed totals, since door-to-door delivery and on-site installation are services you may or may not have asked to be included.
- Assumptions about site conditions. Made-to-measure units only fit walls that have been measured correctly. Confirm who measures the opening and when, and how re-measurement is handled if the wall build changes.
Turning an Approved Sample into an Order
Once your sample set is signed off, ask for a final production drawing that repeats every item you tested: dimensions, finish references, hardware schedule, shelf spans, lighting positions and service cut-outs. That drawing becomes the acceptance document at delivery, and it is what the installation team works to during the on-site stage of the workflow.
If your project also needs kitchen cabinetry, wardrobes, doors or other built-in joinery from the same finish palette, consolidating them with one manufacturer keeps finishes consistent and reduces the number of deliveries and installation visits. That is the practical reason buyers specify these units as part of a whole-apartment or villa fit-out rather than as an isolated purchase.
To obtain samples, a specification sheet and a line-item quotation for Open & Closed Combo Units, send your wall dimensions, reference images and target finish to Santerson, or call or message +86-13928214007 (WhatsApp) to speak with PHILLIP about your project scope and destination.