A Santerson Storage & Display Combo is not a catalogue item you drop into a purchase order. It sits in our Media & TV Walls collection as a configurable wall system: the layout, the dimensions and the finish are all set to suit the room it is going into. That is exactly why an early enquiry with half the information missing comes back as a rough range rather than a firm price — and why a complete brief usually comes back as one number.

The list below is what our estimating team works from on residential and hospitality wall-system projects. Send what you already have; we will tell you what is still missing instead of guessing on your behalf.

Start With the Wall, Not the Unit

For a built-in system the room decides the price more than anything else. Please send:

  • Overall wall width and height, plus ceiling height if the run is intended to reach the ceiling.
  • Floor finish and its thickness, because skirting, plinth height and whether the unit sits on the finished floor all change the elevation.
  • Obstacles on the wall face: switch plates, sockets, radiators, downlights, structural columns, beams, return walls and any door or window swing that crosses the run.
  • Room condition at handover — whether walls are flat and square, and whether plastering, painting or flooring is still to be done. A wall system is a finishing trade; it goes in after the wet work.
If your drawings are not finished yet, send what exists — even a measured sketch with dimensions written on it. We work from sketches at enquiry stage and convert them into production drawings before manufacture.

Decide What the System Has to Hold

"Storage & display" covers a lot of internal planning, and each decision moves the cost. Tell us:

  • The TV or screen: model or size, wall-mounted or recessed, and where the power, aerial, HDMI and network points sit relative to the panel centre.
  • Open versus closed ratio: how much you want on show and how much behind doors. Open niches, glass-fronted sections and closed cupboards carry different hardware and different panel counts.
  • Internal fittings by bay: shelving only, drawers, media equipment housings, or a mix — and the shelf spans where long books or heavy items matter.
  • Door type and count: hinged, sliding or concealed; and whether handles are acceptable or you want a handleless reveal edge.
  • Load assumptions: stone or marble tops, heavy display pieces, and equipment weight inside any enclosed bay.

If you are still weighing up the balance of open and closed storage, our mixed open and closed storage pages in the same wall-system family show how that split reads in a completed installation.

Specify Finish, Material and Hardware

Finish is where an enquiry most often stalls. Give us as much of the following as you can:

ItemWhat to tell us
Panel finishLacquer, veneer, melamine, laminate or stone/marine-look effect; sheen level (matte, satin, high gloss); colour reference or physical sample if you have one.
Substrate preferenceAny substrate requirement from your specifier, and whether moisture resistance matters in that room.
Edge and detail languageShadow gaps, mitred corners, rounded radii, light reveals — a photo of the detail you like is worth more than a written description.
HardwareHinge and runner preference or brand requirement, soft-close need, push-to-open, integrated lighting inside niches or cabinets.
Matching scopeWhether the same finish must continue into doors, wardrobes, shelving or kitchen cabinetry elsewhere on the project. Matching a full height media wall to joinery in adjacent rooms is easier when we know at quotation stage.

Say Who Is Coordinating the Works

Quote accuracy improves a great deal when we know the delivery route and who is on site. Please state:

  • Your role: owner, builder, interior designer, fit-out contractor or procurement agent.
  • Delivery terms and destination, including port or site address and whether you want delivery to the door or to a port of entry. Our logistics and door-to-door delivery service covers freight, packaging and container loading, but terms are set per project.
  • Installation responsibility: whether your trades fix the unit or you want our installation and after-sales support, in which case tell us the site country and access conditions.
  • Programme dates: required on-site date, plus any trades that must precede installation.
  • Quantity across the project: how many rooms use the same system, since repeat bays price differently from one-off units.

What You Get Back From a Complete Enquiry

With the wall dimensions, internal layout intent, finish direction and programme in hand, the reply normally includes an itemised quotation by module, production drawings for your sign-off, and material and hardware schedules you can check against your specification. Drawings are confirmed before manufacture starts, so changes are cheaper at that point than after cutting.

As a China-based furniture and building materials manufacturer, we also produce the surrounding elements — wall panelling, doors, wardrobes, shelving and kitchen cabinetry — in matching finishes. Specifying the wall system together with adjacent joinery avoids the small colour and edge mismatches that appear when separate suppliers interpret the same finish reference.

A Short Checklist Before You Send

  • Measured wall width, height and a sketch with obstacles marked
  • Screen size or model, plus location of power and signal points
  • Open-to-closed storage split and drawer or shelf requirement per bay
  • Door type, door count and handle or handleless preference
  • Finish reference, sheen level and any substrate requirement
  • Hardware and integrated lighting preferences
  • Delivery destination, Incoterms preference and required on-site date
  • Who installs, and how many identical units the project needs

Send us what you have. Email santerson@qq.com or contact us through our contact page, quoting the room and the wall dimensions. We will come back with the questions still outstanding and an itemised quotation for the Storage & Display Combo as configured for your project.

Contact: PHILLIP · Phone/WhatsApp +86-13928214007 · Enquiries are answered on the working day they arrive.