A wooden sliding door wardrobe is one of the easiest built-in items to specify badly. The doors look right in the render, and then the opening allowance, the track detail or the internal layout turns out wrong on site. Because our wooden sliding door wardrobes are made to measure rather than supplied in fixed sizes, the conversation you have with the factory before production decides whether the unit fits and works. Below is the list of options we ask buyers, contractors and designers to settle during enquiry and drawing review.
1. Size first: the opening, not the nominal room size
Send the finished height, width and depth for every wall the wardrobe occupies, and say which of those figures are already fixed by other trades. Sliding doors travel in front of the carcass, so nothing along that line should be blocked by a skirting return, an air-conditioning grille or a light switch plate.
- Confirm floor and ceiling finish levels. A made-to-measure unit is built to the finished line, so state whether screed, tile, plaster or lining is included in your dimension.
- Tell us if the wall is out of plumb or the floor falls. Scribing and packing are decisions, not surprises.
- Say whether you want a full-height unit to the ceiling or a boxed top with a filler panel above.
- Note any skirting that must be removed or cut back, and who is doing it.
2. Door layout: how many panels and which way they stack
The number of panels and their stacking order change both the look and the usable opening. Two panels on a narrow front give you one open section at a time; three or four panels, with an offset overlap, let you reach more of the interior at once. This is also where corner rooms differ from straight runs — our sliding door corner wardrobes are laid out around the return, so the corner bay access has to be agreed on the drawing rather than assumed.
- Straight run, L-shaped or U-shaped layout.
- Panel count and which panels are fixed versus sliding.
- Stacking side, checked against the door swing and furniture layout of the room.
- Whether a mirrored front is wanted — see our mirror sliding door wardrobes if the mirror is part of the door face rather than a separate panel.
3. Surface and colour: wood grain, gloss or matte
"Wooden" describes the look, not one single board and finish combination. Tell us which direction you are working towards so the sample round is short:
- Timber look with grain texture: our walnut veneer wardrobes and wood grain melamine wardrobes are two ways to get a grained face. Fix the species reference, the grain direction and whether edges are matched.
- Flat colour, low sheen: our matte sliding door wardrobes. State the colour reference and the sheen you expect under bedroom lighting.
- Reflective front: our high gloss sliding door wardrobes. Agree how light falls on the face, since gloss shows fingerprints and wall shadows.
- Two fronts in one run: our two tone sliding door wardrobes. Confirm which panels carry which colour, and where the break falls.
- Handleless or handled face: a handleless profile, a recessed pull or a visible handle each changes the panel edge detail. Decide it before the panel is cut.
4. Hardware and track: what you actually feel every day
Hardware is where buyers save money and then live with the result, so specify it as an item, not an assumption. Discuss the track type and where the track sits relative to the opening, since a floor-mounted track collects dust and lint while a suspended track needs enough headroom above the opening for the panel to hang and travel. Then agree the roller quality and load rating for the panel weight you have chosen, the door stop position, and whether soft-close or a brake is required on sliding panels.
Also settle these details in writing: the handle or pull profile and its finish, whether an internal lighting strip is wanted and where the wiring runs, and how the panels are re-adjusted after installation once the building settles. Where a room needs a full-height closing face rather than a wardrobe front alone, our wooden sliding doors use the same design language and can be coordinated with the wardrobe face.
5. Internal layout: built around how you store, not around a standard kit
Sliding doors expose only part of the front at a time, so the internal plan matters more than in a hinged wardrobe. Give us your hanging mix — long garments, short rails stacked two high, drawer zones for folded items, shelf runs, and space for luggage or a safe. Where a project needs a different storage logic entirely, our custom minimalist bedroom wardrobe covers personalised sizes, internal layouts, door styles and surface finishes together.
- Rail heights you want for long and short hanging, and how many rails per section.
- Drawer count and depth, plus whether drawers sit behind a sliding panel and need full extension.
- Shelf spacing, adjustable or fixed, and any tall bay left clear.
- Accessory positions: trouser pull, shoe shelf, jewellery tray, ironing board recess.
6. Project-level coordination for apartments, villas and hotels
For multi-unit work, the wardrobe is a repeat item, so approve one reference unit and record every deviation from it per room type. Send us the room-type schedule with quantities, and we produce shop drawings per type for sign-off before production. If the same project also needs kitchen cabinetry, media walls, doors and panelling from the same maker, our turnkey solutions cover villa, hospitality and office projects end to end — design and planning, production, logistics, installation and after-sales — which keeps finishes and edge details consistent across trades instead of matching them after the fact.
Our interior design services cover space layout planning, product specification and drawing coordination with on-site guidance, which is useful when the wardrobe face has to align with wall panelling or a headboard wall.
A short checklist for your next enquiry
Before we draw anything, send these:
- Finished dimensions per wall, with fixed and flexible figures marked.
- Floor, ceiling and skirting finish levels, plus who removes skirting.
- Panel count, stacking side and corner-bay access preference.
- Finish direction and colour or grain reference, with the sample round agreed.
- Track type, roller class, soft-close requirement and handle profile.
- Internal layout: rail heights, drawer zones, shelf spacing, accessories.
- Room-type schedule with quantities for multi-unit projects.
- Delivery address, access route and installation responsibility.
None of these choices are difficult on their own. Left unspoken until after production starts, they become site problems. Put them in the enquiry, review the shop drawing line by line, and confirm the dimensions and selected specifications for each project before the panels are cut.
Configurations are made to measure per project; available boards, finishes and hardware depend on the specification agreed for your order.