A procurement brief that only says "high gloss PVC cabinets, as per drawing" will come back with six quotations that are not comparable. This guide sets out the line items a buyer, contractor or design team should lock down before requesting pricing, so the offers you receive describe the same cabinet.
What the brief has to settle before prices mean anything
High gloss PVC-fronted cabinetry sits in the middle of most fit-out budgets: visible every day, expected to survive a decade of handling, and usually ordered late in the programme when nobody wants an expensive clarification round. The reason quotations diverge is not that suppliers are behaving badly — it is that "high gloss PVC" describes a surface look, not a build. A brief that leaves substrate, edge treatment, panel thickness, hardware grade and tolerance unspecified lets each factory quote its own default.
SANTERSON manufactures this category as part of the PVC kitchen cabinet range, including high gloss PVC cabinets, alongside matte and wood-grain PVC fronts in the same family. The product pages state made-to-measure sizing, material and finish options, and a layout tailored to the project — which is precisely why the brief has to be explicit. Configurable means you choose; it does not mean the factory chooses for you.
1. State the finish by name, and state what it is being matched against
"High gloss" spans a wide reflectivity range between factories, and gloss is where sample disputes start. Write the finish as a named item from the supplier's own catalogue rather than an adjective, then say how it will be approved.
- Name the finish in the schedule (for example: high gloss PVC, matte PVC, wood grain PVC) and keep one naming convention across drawings, BOQ and correspondence.
- Require a physical sample panel before order confirmation, and record the approved sample with a reference number on the purchase order.
- Specify the direction of any wood-grain pattern — vertical or horizontal grain run — because it changes cutting yield and the look of a completed wall.
- Note the viewing context: north-facing glazing, recessed downlights and open-plan sightlines all expose surface defects that a sample on a desk will not.
Where a project mixes finishes — gloss fronts on one wall, matte PVC cabinets on another, or wood grain PVC cabinet doors to warm up a run — list each finish separately in the schedule with its own quantity and location. Mixing finishes in one line item is a reliable way to lose comparability between bids.
2. Specify the door construction, not just the surface
The PVC film is the visible layer; what determines performance is what sits behind it and how the edges are closed. In the brief, split the door into four items and require each to be answered.
| Brief item | What to write | Why it changes price |
|---|---|---|
| Substrate | Board type and thickness for the door core and for the carcase, stated separately | Different cores behave differently near sinks, dishwashers and steam |
| Surface | PVC film finish, gloss level, grain direction, sample reference | Film quality and application method are the main cost differentiator in this category |
| Edge | How door edges are finished — wrapped, bonded or profiled — and the edge colour match rule | Weak edges are the first thing to lift in a humid kitchen; the methods are not interchangeable |
| Profile style | Flat slab, routed/shaker profile, or glass-front door | Routed profiles and glass inserts need different machinery and different lead time |
If the design calls for a routed profile rather than a flat slab, quote it as its own line: PVC-fronted doors in a routed profile and in a flat slab are built differently and priced differently. The same applies where the brief mixes solid fronts with glass front PVC cabinet doors: glazing, gasket or channel detail, and glass type all need their own description.
3. Put the tolerance question in writing early
High gloss fronts show misalignment more unforgivingly than any matte surface. Two millimetres of rack on a satin door is invisible; the same two millimetres across a run of gloss doors reads as poor workmanship even when every unit is within tolerance.
- State who sets the finished floor and wall levels, and by when. Made-to-measure cabinetry is only as accurate as the site dimensions supplied to it.
- Require a site survey or dimension sign-off before production release, with the survey date recorded on the order.
- Specify the alignment tolerance you expect for door fronts — gap width and step — rather than accepting "to manufacturer standard".
- Agree the adjustment range of the hinges and any levelling feet, so site crews know what they can correct on installation day.
4. Schedule the interior separately from the exterior
The most common value gap in a cabinet quotation is inside the box. Fronts get attention; carcases, drawers and linings get whatever the supplier defaults to.
- Carcase thickness and finish colour on visible interior faces, including the outside of an end panel that faces a living space.
- Drawer construction — box type, runner brand and series, load rating, soft-close or push-open — listed per drawer bank, not "as standard".
- Speciality internals: pull-out larder, corner carousel, tiered spice units, integrated appliance housings, cutlery trays. Each is a priced item; each needs its own line.
- Ventilation and moisture detail at sink runs, oven housings and dishwasher bays, since PVC-fronted doors sit closest to the wettest zones of a kitchen.
- Plinth, scribe, filler and cove details, and whether they are supplied finished or field-trimmed.
Where project-level supply changes the brief
For apartment blocks, villa schemes and hotel guest-kitchen fit-outs, cabinetry usually arrives alongside wardrobes, vanities, doors and joinery from the same source. Coordinating those packages with one supplier — as SANTERSON describes across its kitchen cabinets and hotel appliances range and its one-stop project procurement service — means one set of tolerances, one sample-approval process and one delivery window instead of four. The trade-off is that your brief has to be at least as precise as the loosest subcontractor in the chain, because a single consolidated order carries everyone's assumptions.
5. Fix the logistics and handover terms in the same document
Cabinetry is heavy, low-tolerance and expensive to replace one piece at a time, so delivery terms belong in the specification rather than in a later commercial negotiation.
- Packaging standard per unit, pallet or crate configuration, and how fragile glass-front items are separated.
- Carton labelling convention that maps each box to a room and elevation on your drawings — this is what saves installers from opening everything.
- Incoterms, destination, and who handles customs clearance; SANTERSON's logistics service covers freight forwarding by sea, air and rail with documentation support, but the responsible party must be named per project.
- A named spares and shortage procedure: how a missed handle or damaged door panel is replaced, and what it costs when discovered after the container is opened.
- Inspection and snag window on site, agreed before installation begins rather than at handover.
A short checklist to paste into the brief
- Finish named per elevation, with approved sample reference and grain direction
- Substrate, panel thickness and edge treatment stated for doors and carcases separately
- Profile style declared — slab, routed, or glass front
- Site dimensions surveyed and signed off before production release
- Door alignment tolerance written as a number, not a reference to a standard
- Hardware by brand and series, listed per bank of drawers and doors
- Appliance interfaces and ventilation detail attached, not assumed
- Packaging, labelling, Incoterms and customs responsibility named
- Spares, shortage and snag procedure defined before despatch