A wardrobe line that mixes two front materials in one run of doors is easy to specify badly. Glass & Lacquer Combination Wardrobes sits in our Lacquer Wardrobes collection and is made to measure, so the drawing pack, not the product name, is what a project is actually buying. The checklist below is the documentation we ask for on this type of order, and it doubles as the record your site team, design consultant and supplier all work from.
Why combination fronts need more paper than a single-material run
With one door material across a whole elevation, most of what matters is obvious on the drawing: size, hinge side, handle. Combine lacquered panels with glass inserts and each elevation starts carrying extra variables: where the glazing stops, which glass type and finish sits in which opening, how the two materials meet at the rebate and how light behaves through the glazed sections against the surrounding wall finish. None of that can be recovered later from a purchase order that only says "wardrobe, made to measure".
The practical test is simple: could a second procurement officer, or a new site foreman, install and hand over this wardrobe using only your documents? If the answer is no, the pack is incomplete.
Item 1: opening dimensions, and how they were verified
Record finished opening width, height and depth for every unit, with each dimension checked at floor level, mid-height and ceiling level. Made-to-measure joinery is built to the numbers you send, so a single spot measurement in an uneven room becomes a site problem later.
- State the datum you measured from, whether finished floor level or structural slab, and whether floor finishes are already installed.
- Note obstructions: skirting, architraves, downlights, ceiling cornices, door reveals and any services that cannot be moved.
- Give the plumb and level deviation per wall, not just "walls are uneven".
- Attach a dimensioned sketch or exported CAD plan for each elevation, with unit numbers that match your schedule.
Item 2: the material and finish schedule
This is where combination wardrobes most often go wrong at handover. Specify every surface separately rather than naming one colour for the whole unit.
| Element | What to write down |
|---|---|
| Lacquered panels and carcass | Colour or sheen reference as stated on the approved sample, gloss level (high gloss or matte), and which faces are visible versus internal. |
| Glass sections | Tint or surface type (clear, bronze, frosted or ribbed) and whether the glass is used in hinged, sliding or fixed doors. |
| Transition detail | How glass meets lacquer: rebate, aluminium or decorative profile, shadow gap. Note it on the elevation drawing. |
| Internal finish | Carcass and shelf material, edge treatment, and whether interiors match the exterior colour or are specified separately. |
| Ironmongery | Hinges, slides, handles or handleless profile, and the loading expectation for each drawer and door. |
Keep a signed physical sample reference for every finish you name. Where the schedule and the sample disagree, the sample governs; say so in writing.
Item 3: interior layout and how it will be used
Document hanging zones, shelf spans, drawer banks, mirror or shoe provisions, and integrated lighting separately from the door schedule. If your project needs storage organised around a specific routine, such as long garments in one column or drawers concentrated near the bed side, that belongs in the layout drawing with dimensions.
- Mark which compartments are behind glazed doors, since contents there stay visible and need a tidier internal finish.
- Record load-bearing intent for shelves holding heavy items, and any span limits you have agreed with the supplier.
- Note where accessories such as pull-out hampers or valet rails are expected.
Item 4: interface documentation
Built-in wardrobes touch walls, floors, ceilings and lighting. A short interface note per unit prevents the classic snag list: a gap at the cornice, a door that fouls the skirting, a downlight that cannot be serviced because a carcass was built over it.
- Confirm which trade installs the setting-out and who makes good around the unit.
- State tolerance allowance at ceiling and floor junctions, and how it is closed off.
- Record electrical points: position, height, and who terminates lighting feeds.
Item 5: approvals, packaging and delivery record
For multi-unit orders, keep the unit schedule aligned with room numbers so that each crate arriving on site can be traced to one elevation. Keep dated copies of approved drawings and signed samples, together with the correspondence in which each finish was confirmed. This is the file you return to when a replacement panel or spare part is needed years later.
How we work from your pack
SANTERSON manufactures wardrobes alongside the rest of a project's joinery, cabinetry and finishes, so one documentation set can serve several trades instead of being rewritten per supplier. Send us the dimensioned elevations, finish schedule and interface notes described above and we return made-to-measure production drawings for your sign-off before anything enters manufacture. Our Custom & OEM Service covers bespoke finishes and layouts, and our project services extend through production, freight to site and installation support.
Where a project compares alternatives, the same pack works for both: High Gloss Lacquer Wardrobes and Glass Sliding Door Wardrobes need identical dimensional and interface data, only the door schedule changes.
Before you raise the order: confirm opening dimensions on site, sign off one physical sample per finish, and number every unit on your drawings the same way it will be numbered on the crates.
Questions procurement teams ask us
Can glass and lacquer doors be mixed within one wardrobe, or must they be separate units?
They can sit in one run of doors. What matters is that your drawing states which opening carries which material, and how the two meet.
What if our drawings only show a room, not individual elevations?
Send what you have. We will mark up the missing dimensions and junction details for your confirmation before production drawings are issued.
When should glazing type be fixed?
Before production drawings are released. Glass tint and surface affect rebates, door weight and hardware, so a late change reopens the whole door schedule.