A mirrored hinged wardrobe quotation can look complete on paper and still leave a buyer exposed at handover. The difference between a workable proposal and a risky one is almost never the headline price — it is whether the drawing, the schedule and the paperwork all describe the same set of doors, the same opening clearances and the same finish.

Wardrobes with mirrored hinged doors appear in villa bedrooms, serviced-apartment fit-outs, guest-room joinery packages and back-of-house storage for hospitality sites. They are one of the few built-in items where a small measurement error is visible every single day, because the mirror both reflects the room and reveals the misalignment. If you are comparing furniture and building materials supplier quotations for a project, this article gives you a practical checklist for reading a mirrored hinged wardrobe proposal before you place the order.

1. What the scope line should actually say

Start with the description of the item itself, not the number at the bottom. A usable line item names the door type, the carcass construction, the mirror fixing method and the internal layout. Vague wording such as "wardrobe, mirrored, as per drawing" transfers every unresolved decision to site.

Our Mirrored Hinged Wardrobes are made to measure for each project, with the finish, layout and dimensions specified against the space rather than chosen from a fixed catalogue size. That is the model you want to see reflected in a proposal: sizing derived from site dimensions, a stated material and finish selection, and an internal configuration agreed before production.

2. Reading the drawings before the price

Ask for elevation drawings at a legible scale, one per wardrobe run, with overall height, width and depth dimensioned, plus door widths marked individually. From those drawings you can check three things that decide whether the installation will go smoothly:

  • Door swing and clearances. Hinged doors need a clear arc in front of them. Check the drawing against the room layout: is there enough standing space for the door to open past the bed, the vanity or an adjacent wall?
  • Handle and mirror edge detail. A mirrored door carries its handle on the glass face or on the frame stile. Confirm which, and ask how the mirror edge is finished at the door reveal.
  • Carcass division points. Where two carcasses meet, a visible vertical shadow line appears. The drawing should show whether the run is one unit or several, and where the joints fall relative to the room.

Where the room has an awkward corner, ask how it is treated. A proposal that simply dims around a column without comment usually means the detail will be improvised on site. Compare the mirrored hinged option against the Hinged Door Corner Wardrobes layout to see how a corner run is normally drawn and dimensioned.

3. Mirror specification: the part most quotations skip

Mirror on a hinged door takes daily impact from hands, bags and coat sleeves. When you review the specification sheet, look for these points in writing:

Item to confirmWhy it matters
Mirror thickness and whether it is safety-backedDetermines how the door carries the weight and how the panel behaves if struck
Fixing method — bonded, framed or captured in a rebateBonded glass on an over-wide door shows stress and distortion over time
Edge finish and whether edges are sealedUnsealed edges are where blackening starts in humid bathrooms and coastal sites
Which face the mirror sits on, inside or outChanges the internal clear depth and whether the door can sit flush in a niche
Hinge type and load rating against the finished door weightMirrored doors are heavier; under-rated hinges sag and the gap widens

If a proposal lists none of these, request them as a written addendum. A supplier who can answer in detail has built this item before; one who cannot is quoting it for the first time on your project.

4. Door type: hinged, sliding or an alternative

Not every room suits a hinged mirrored door. Where standing space in front of the wardrobe is tight, a sliding system recovers roughly the depth of the door swing. Compare both options on the same criteria — clear opening width, hardware quality, how the mirror is mounted, and what happens when one panel needs servicing.

The Mirror Sliding Door Wardrobes in the same catalogue are a useful reference point for that comparison, since they share the mirrored finish but solve a different spatial problem. If you are evaluating several wardrobe types across one project, also check the wider furniture range so bedroom joinery, wall panelling and lighting are specified against one finish schedule rather than three.

5. Commercial quantities change what you should ask for

A single villa wardrobe and a forty-key guest-room package are different procurement problems. For repeated units, the proposal should address:

  • A signed first article. One wardrobe produced, reviewed and approved before the balance is made. This is where finish, hinge feel and mirror tone get locked down.
  • Batch consistency of the mirror and carcass board. Ask whether all units come from one production batch, so tones do not shift between floors or blocks.
  • Packaging and pallet labelling by room number. On site this is what allows crews to install floor by floor instead of sorting cartons in a corridor.
  • Spare hardware allowance. Hinges, handles and glazing beads should be listed as an item you can reorder later, not something assumed available.

For projects that need non-standard sizes, repeated layouts or your own branding on the packaging, ask specifically about custom and OEM service, and get the prototyping step written into the programme rather than treated as an informal courtesy.

6. Delivery, installation and after-sales terms

Wardrobe failures are usually discovered at handover, when the paperwork is already closed. Before you sign, confirm how the following are handled for your site:

  • Freight mode, packaging standard and who handles customs clearance — see the logistics and door-to-door delivery service description for what a supplier should be committing to.
  • Whether installation is by the supplier's team, your contractor, or a hybrid, and who is responsible for wall preparation beforehand.
  • The snag process: who inspects after installation, and how replacement panels or doors are supplied if one arrives damaged.
  • What after-sales cover actually includes — installation and after-sales support should be defined in scope, not left as a general promise.

Written terms here are worth more than a lower unit rate. A damaged mirror panel replaced from a new production run can hold a handover date for weeks; the same panel held as project stock is an afternoon's work.

Red flags in a mirrored hinged wardrobe proposal

  • A single price with no breakdown of carcass, doors, mirror and hardware.
  • Drawings without door widths or opening clearances marked.
  • No stated mirror thickness, fixing method or edge treatment.
  • Hinge brand or load rating omitted while the door is described as full-height mirrored.
  • Delivery terms quoted as "door to door" with no named responsibility for unloading, storage or site lift access.
  • Warranty language that covers the carcass but is silent on mirror silvering.

A short evaluation scorecard

Score each quotation from one to five on: drawing completeness; mirror specification detail; door-swing clearance evidence; batch and first-article process; packaging and labelling; installation and snag responsibility. A proposal that scores four or above on all six is normally safe to proceed with. Anything scoring three or below on mirror specification or drawings should come back for revision before the price is even discussed.

If you are sourcing made-to-measure built-in wardrobes for a villa, apartment or hospitality project and want a proposal that answers the questions above, contact SANTERSON with your room dimensions and finish preference, and we will return drawings, a specification sheet and an itemised quotation.