Open wardrobes on a metal frame look simple on a rendering and complicated on site. The frame carries the shelves, rails and drawers; it also sets the reveal lines against the wall, the fixing detail to the floor or ceiling, and how much adjustment is left when the finished floor arrives late. For a project buyer comparing quotations from different factories, the drawings rarely differ as much as the delivery experience does. The questions below are the ones worth putting in writing before an order is placed.
What an open wardrobe on a metal frame actually covers
In this category the carcass structure is metal - usually an aluminium or steel profile system - while the shelves, hanging rails, drawer fronts and infill panels can be specified in board materials, laminates, glass or wood veneer. Because there are no doors on the elevation, every junction is visible: the frame profile width, the shadow gap to the wall, the edge treatment of each shelf, and the cable routes if lighting is built in.
Our own listing for Metal Frame Open Wardrobes describes the range as made-to-measure, with material and finish options and a layout tailored to each project. That wording matters when you read other suppliers' catalogues: a page that offers only three fixed widths is a stock product, not a bespoke one, and it will be reconciled on site by whoever holds the tape measure.
1. Whether sizing is genuinely made-to-measure
Ask what the supplier needs in order to quote: a room photograph and a rough dimension, or a dimensioned drawing with floor levels, skirting details and the position of services. A factory that can work from your architectural set will normally return a shop drawing with heights marked to the finished floor level, not to the structural slab. That single distinction prevents most site problems, because the screed and floor finish change the number after the wardrobe has been drawn.
- Floor-to-ceiling heights: confirm whether the frame is cut to site height or whether a filler panel is used, and who supplies it.
- Wall returns and corners: ask how the frame meets a non-square wall, and whether scribe pieces are included.
- Integration with other joinery: if the same supplier is also making other built-in furniture, the reveal lines and finishes should be drawn as one package rather than ordered separately.
2. Frame profile, finish system and hardware brand
Request the profile cross-section as a drawing with the wall thickness of the extrusion stated, plus the finish method (powder coating, anodising or laminate wrap) and the colour reference by name and code. Two quotations that both say "black aluminium frame" can differ noticeably in coating durability and in whether the corners are mitred and welded or simply cut and joined with connectors.
Hardware is where a low quotation becomes expensive later. Ask which hinge, slide and rail brands are quoted as standard, what load rating the drawer slides carry, and what cycle testing documentation exists for them. Then ask what substitution is permitted without written approval - this clause protects you when a component goes out of production mid-project.
3. A sample that matches your specification, not a showroom piece
A finished corner sample is the cheapest risk control available: it shows the profile joint, the shelf edge banding, the coating colour under site lighting and the actual board substrate behind the laminate. Specify the sample in your own finish combination rather than accepting whatever the factory keeps on a shelf, and confirm who pays the freight.
4. How open storage is handled across a whole project
Open wardrobes behave differently from closed ones in use: dust settles on shelves, hanging garments are visible, and the tidiness of the room depends on the layout. A supplier who only sends prices will not raise this. One worth working with will ask how the piece is used - walk-in dressing area, bedroom wall, guest room or service corridor - and adjust the balance of open shelf, drawer and enclosed volume accordingly. The Minimalist Open Wardrobes and Freestanding Open Wardrobes listings sit in the same collection for that reason: the configuration, not just the frame, is what gets specified.
5. Design coordination before production starts
For multi-unit work, confirm who produces the coordinated drawing set and what happens when a room dimension changes after the order. Our Interior Design Services cover space layout planning, furniture layouts with 3D renderings, and project design coordination that runs through drawings, production coordination and on-site guidance - so the same team that drew the elevation is available when the drawing needs to change.
6. Customisation depth and order flexibility
Ask whether the factory handles bespoke material and finish work in-house, including veneers, laminates, engineered stone and metals, and whether it can prototype a detail before committing a full batch. For buyers building their own product line, also ask about OEM work and private labelling - our Custom & OEM Service covers custom design and prototyping, bespoke finishes and branding such as engraving or logos. Confirm minimum order quantities per finish rather than per project, since a single villa often mixes several.
7. Packaging, freight and the packing list
Metal frames and long panels are damaged in transit more often than they are made badly. Ask how profiles are protected at the corners, whether glazed infill travels separately, and how each crate is numbered against the room schedule. A packing list keyed to room numbers rather than to carton sizes is what lets a site team confirm receipt in an hour instead of a day. Our Logistics and Door-to-Door Delivery service covers freight forwarding by sea, air and rail, export paperwork and container loading, with shipment tracking through to the delivery address.
Set the Incoterms in the quotation itself, along with who arranges cargo insurance and import clearance. Transit time is a variable, not a promise, so plan the order around your site programme rather than around an advertised number of weeks.
8. Installation, snags and spare parts
Ask whether installation is by the supplier's own team or supervised on site, what the snag process is, how long the warranty runs and which parts remain available afterwards - shelf brackets, rails, slides and replacement panels are the items that matter on open systems. Our Installation and After-sales Support page lists on-site installation, inspection and snags, warranty coverage and spare parts or replacement; the exact terms, response times and exclusions are confirmed per project in writing.
9. Comparable project references
Ask for reference projects of the same type and scale - villa bedrooms, serviced apartments or hospitality guest rooms - and check what was actually delivered in each case: single wardrobes, a full joinery package, or coordination with other trades. Published references show scope, not performance, so treat photographs as a starting point for questions.
Buyer checklist before you place the order
- Shop drawing with heights to finished floor level, signed off by your designer or architect.
- Profile section drawing, wall thickness, finish method and colour code in writing.
- Hardware brands, load ratings and a written substitution clause.
- Corner sample in your specified finish, freight terms agreed.
- Packing list mapped to room numbers; Incoterms and insurance owner named.
- Installation method, snag list process, warranty period and spare-part availability stated per project.
Questions to send with your enquiry
Can you quote from a dimensioned drawing rather than a fixed module size?
Yes, provided the drawing gives finished floor levels, wall construction and the position of services. Send the architectural set and we return a shop drawing for approval before production.
Which finishes can be mixed in one order?
Frame colour, shelf laminate, veneer, glass infill and drawer fronts are specified line by line. Minimum order quantities apply per finish rather than per project, so group the rooms that share a specification before you place the order.
How is an open wardrobe fixed, and does it need a solid wall?
It depends on the wall build-up and the height of the unit. Confirm the substrate with your structural engineer or site contractor; the fixing detail is agreed against that information rather than assumed.
Can built-in lighting be included?
Cable routes, driver position and switching can be drawn into the frame. Confirm the voltage standard and control system for the destination market before the drawing is frozen.
Putting it together
A metal frame open wardrobe is a small item in a project budget and a large item in daily use. The supplier worth paying is the one that answers with drawings - profile sections, shop drawings to finished floor levels, hardware schedules and a packing list your site team can read - instead of a price per linear metre. If you are sourcing wardrobes alongside other joinery, flooring, doors or sanitaryware, turnkey project solutions let one supplier hold the coordination for the whole fit-out.
SANTERSON is a China-based furniture and building materials manufacturer working on villa, hospitality and office projects. Specifications, hardware, freight terms and warranty conditions are confirmed per project in writing before production. Contact: PHILLIP, +86-13928214007, santerson@qq.com.