A two tone sliding door wardrobe looks simple on a render and complicated on site. The doors glide, the panel colours meet cleanly at the reveal, and the carcass has to sit square against a wall that is rarely perfectly flat. Most problems buyers run into are not design failures; they are missing information. This checklist covers what you should have settled before you place an order for Two Tone Sliding Door Wardrobes, and what to ask the factory at each stage.
1. Measure the opening, not the drawing
Sliding doors need overlap clearance that hinged doors do not. Two panels on a two-track track system each travel past the other, so the internal clear opening is narrower than the overall width of the carcass. Before you specify anything, record:
- Width and height at three points each — floor to ceiling at left, centre and right, because slab and screed levels drift. Take the smallest dimension as your working height.
- Floor finish build-up — state whether the measurement includes the final flooring, screed or underlay. A wardrobe ordered to a bare-concrete height will not clear 15 mm of timber flooring later.
- Obstructions in the swing and slide zone — switch plates, air-conditioning returns, curtain boxes, skirting, downlights on the ceiling line above the track.
- Adjacent door and drawer clearance — confirm an adjacent room door or bedside unit does not collide with the leading panel at full travel.
SANTERSON builds these wardrobes made-to-measure, so dimensions, layout and finish are specified per project rather than picked from a fixed size range. That removes the "closest standard width" compromise, but it also means the measurement sheet you send becomes the production document. Send it as a marked-up drawing with the finish level noted, not as a single number.
2. Decide the two tones before you decide the layout
"Two tone" can mean two panel colours on one door, or alternating solid panels and glass or mirror panels in the same run. The choice drives hardware, cost and how the unit reads in a small bedroom.
- Split direction — a vertical split between tones makes a narrow wall look taller; a horizontal band lowers the visual line and works better under a low ceiling.
- Which tone carries the handles — recessed or edge-pull profiles are easier to keep consistent on a solid panel than across a glass frame.
- Finish family consistency — matte, lacquer, melamine and veneer take colour differently. If you are matching an existing Matte Sliding Door Wardrobes finish or a kitchen front in the same apartment, ask for the finish reference to be carried across both, and confirm it on a sample before production.
- Contrast at the reveal — where two tones meet, an aluminium or matching PVC edge trim hides the joint. Ask which edge treatment is quoted; it is often excluded from the base price.
3. Specify the sliding system, not just the doors
The track and hanger set determines how the wardrobe feels after two years of use. Ask the supplier to state, in writing:
| Item to confirm | Why it matters |
|---|---|
| Track type and material | Aluminium tracks carry wide panels with less flex than thin steel channels, and the track depth sets how much ceiling space you lose. |
| Hanger and roller rating | Panels with glass inserts weigh considerably more than a board panel. The roller load rating must cover the finished panel weight, not the bare board. |
| Soft-close or buffer | Optional on most systems. Worth specifying for hospitality and rental bedrooms where doors get slammed. |
| Bottom track or wall-hung | A floor track collects grit and needs cleaning access; a wall-hung system avoids that but needs a solid fixing line above the opening. |
| Panel overlap and stop position | Determines the usable clear opening and where the panels park when open. |
4. Lock down the internal layout against what you actually store
The doors are the visible decision; the interior is the one that decides whether the wardrobe earns its space. Work from a hanging-height list rather than a shelf grid:
- Long hanging for coats and dresses needs roughly 1,300–1,450 mm of drop; double hanging needs two rods at about 1,000 mm each.
- Drawers are more usable than low shelves in a sliding-door unit, because nothing is hidden behind the leading panel. Where budget allows, move storage from the bottom shelf zone into drawers.
- An internal mirror or a full-height Mirror Sliding Door Wardrobes panel saves a separate wall fitting, but reduces the panel colour options — decide this before the two tone scheme is fixed.
- Glass-fronted panels in a Glass Sliding Door Wardrobes detail show what is behind them; use them only for zones you keep tidy, and specify the glass type and safety grade explicitly.
- Lighting inside the carcass needs a cable route decided at drawing stage, not added on site.
5. Confirm materials and the documentation that comes with them
For a project order, the specification sheet should name each component rather than describe the look. Board substrate and thickness, edge banding material, door panel construction, finish system, hardware brand or model reference, and glass safety grade where relevant. Where you are sourcing wardrobes alongside other joinery — kitchen fronts, vanities, media walls — ask for the same board and finish references to be used across packages so colour does not drift between trades.
Ask before you order
Which components are made by the factory and which are bought in? Who supplies the sliding hardware on site, and is it packed with the panels or shipped separately? What tolerance is allowed for wall and floor deviation at installation?
6. Match the order to how the job will actually be delivered
Built-in wardrobes fail most often in logistics, not manufacture. Work backwards from the site:
- Delivery route — panel length versus lift doors, stair turns and corridor widths. A full-height side panel that will not clear a stair landing has to be split, and that changes the drawing.
- Packaging and packing list — every bundle labelled with the room, panel reference and orientation, so fitters are not opening crates to identify parts.
- Sequence — if the wardrobe is one of several joinery packages, confirm it arrives after wet trades have finished and flooring is down.
- Installation responsibility — state clearly whether the factory sends fitters, your contractor installs, or drawings go to a local carpenter. SANTERSON lists installation and after-sales support alongside door-to-door delivery in its turnkey project services; scope for your site should be confirmed in the quotation rather than assumed.
7. Get one sample and one signed drawing
Before production starts, two documents protect the order: a physical finish sample showing both tones and the edge treatment together, and a signed production drawing with dimensions, door split, hardware reference and internal layout marked. Under SANTERSON's custom and OEM process, design goes through 3D modelling and prototyping before manufacture, so this is the point at which changes are cheap. After sign-off, treat the drawing as the acceptance reference for the delivered unit.
The checklist in brief
- Three-point measurements with finish levels noted
- Two tone split direction, edge trim and handle style fixed
- Track, roller rating, soft close and panel overlap stated
- Internal layout built from hanging heights, not a default grid
- Materials named component by component, finish references matched across joinery
- Delivery route, packing labels and installation responsibility agreed
- Physical sample plus signed production drawing before manufacture
If your project needs the wardrobes coordinated with other built-in furniture, send the marked-up dimensions and finish references and we will quote the package against the same board and colour standards. Browse the built-in furniture range or contact us to start with a drawing review.