A set of high gloss lacquer cabinets looks finished the moment it leaves the factory. It only performs once it arrives on site, square, unscratched and ready to install. For a project order crossing an ocean, most of the risk sits in the months between purchase order and handover. This guide walks through the decisions that actually matter: what you order, how it is packed, which freight mode you choose, who clears customs, and how the site is prepared for the day the crates land.

Why lacquer cabinetry needs a delivery plan of its own

A lacquered door is a panel plus several coats of cured finish. The surface carries the visual value of the whole kitchen, and it is also the part most exposed to handling: corner chips from a dropped carton, abrasion where packing material rubs a fresh finish, thermal shock inside a container sitting on a dock in full sun.

Project cabinetry is made to measure as well. SANTERSON's lacquer kitchen collection is made to project-specific dimensions, with material and finish options and a layout tailored to each space. That means there is no shelf of standard sizes to draw from if a crate is damaged in transit. A replacement door has to be re-machined, re-sprayed, re-cured and shipped again. Every planning decision below exists to keep that scenario from happening.

Step 1: Lock the specification before the order is released

Delivery problems usually start as specification problems. A change made after production begins becomes a re-shipment, and a re-shipment costs more than the original freight. Before you release a purchase order, confirm:

  • Final room dimensions with site-verified measurements, not architectural drawings alone — takeoffs on site absorb tolerances that plans miss.
  • The finish family for every run: two tone lacquer cabinets for a mixed-height wall, black high gloss cabinets as the anchor, or a matte lacquer front where fingerprints and light reflection are a concern.
  • Hardware and internal fittings, because these often travel in separate cartons and arrive on a different leg.
  • Which elements are cabinetry and which belong to another trade — worktops, splashbacks, integrated appliances — and who supplies each.

Where the project also needs wardrobes, vanities or built-in storage from the same manufacturer, group them into one production window. Ordering joinery for different rooms months apart is how a suite ends up with fronts that read slightly differently under the same light; a single production run and one shipment keep the specification and the delivery date aligned.

Step 2: Agree packaging and container loading before dispatch

Ask for the packing method before you compare freight quotes, because packaging changes volume, weight and therefore cost. For lacquered fronts, build the specification around four things:

  • Individual protection of each door and carcase.
  • Cushioning between panels — never panel-to-panel contact.
  • Protection on mitred and post-formed edges, which are the first points to chip.
  • A carton list that names every crate and the panels inside it, so site teams can find a specific unit without opening everything.

Confirm with the factory how those requirements are met for your order — crated, palletised or boxed is a production decision, and you want it documented before dispatch rather than discovered at the port.

Container loading deserves the same attention as packing. A partially filled container shifts at sea; cabinets should be braced and blocked, not wedged with loose site materials. Ask your supplier for the loading plan and photographs of the loaded container before the doors close — images taken at the port of loading are the most useful evidence you can hold if a cargo insurance claim follows.

Practical rule: never accept a quote that bundles "packing" into one line item. Ask for carton dimensions, total cubic metres and the number of crates. Those three numbers drive your freight cost, your storage space on site and the labour needed to unload.

Step 3: Choose the freight mode against your programme, not the rate alone

International cabinetry moves by sea, air or rail, and each has a different trade-off for a made-to-measure order. Sea freight is the default for full project packages — a kitchen plus wardrobes plus other joinery will fill enough volume to make a container economical. Air is rarely justified for a whole suite, but it can rescue a handful of replacement panels or late hardware. Rail sits between the two on some Asia–Europe corridors.

ModeBest suited toWhat to watch
Sea (FCL)Complete project packages, multiple rooms, full container volumesPort congestion, the last-mile leg from port to site, dwell charges if the site is not ready
Sea (LCL)A single kitchen on a smaller renovationConsolidation handling adds touch points; make sure your crates are rigid enough for a shared container
AirUrgent replacement panels, hardware, samples for sign-offCost per cubic metre; check that oversized panels can be accepted at all
RailMid-range speed on corridors where it is availableMore transhipment points than a direct sea service

The logistics service described on the SANTERSON site covers freight forwarding by sea, air and rail along with customs paperwork, packaging and container loading, shipment tracking and door-to-door delivery. Use that as your starting point, then confirm the Incoterms on your own quotation. Whether you are buying FOB or CIF decides who pays freight, who insures the goods, and where risk transfers — three questions that determine who absorbs a damaged container.

Step 4: Treat customs clearance as a scheduled milestone

Cabinetry is held up more often by paperwork than by transport. The documents below are usually straightforward, but they must agree with each other line by line:

  • Commercial invoice with values that match the payment actually made.
  • Packing list whose carton count matches what is physically loaded.
  • Certificate of origin where your import rules require it.

Check which declarations or permits your destination country applies to timber and engineered board products, and lodge them before the goods move rather than after they arrive. Two details cause most delays. First, the tariff classification: cabinetry, joinery and furniture components can fall under different codes, and a mismatch between invoice descriptions and declared codes triggers inspection. Second, packaging material — timber dunnage and crates need to comply with destination-country phytosanitary rules, which is another argument for specifying engineered or treated packing materials up front.

Decide early who acts as importer of record. On a residential project sold through a local builder, that is usually the builder; on a direct developer purchase, it may be you. Whoever it is needs to be named before the goods move, not after they arrive at the port.

Step 5: Sequence the shipment around site readiness

The most expensive delivery failure is a container that arrives at a site which cannot receive it. Cabinets end up in a rented storage unit for weeks, or worse, on an unfinished floor where humidity and dust attack the panels before installation.

  • First fix complete: walls plastered, floors level and dry, services roughed in and tested.
  • Building watertight: windows, roof and external openings installed, so the interior is stable before joinery arrives.
  • Damp trades finished: screed, render and paint have cured. Trapped moisture warps boards and affects finish adhesion.
  • A dry, secure storage area with a clear path from the truck to that area, wide enough for the longest crate.
  • Unloading labour booked for the actual arrival date, not "sometime that week".

Work backwards from your installation date. Allow time for production and finishing, then freight, then clearance, then a buffer for inspection or a rescheduled delivery slot. On multi-unit projects, phase the deliveries by apartment or floor rather than taking everything at once — it reduces double handling and keeps damage claims tied to a specific batch.

Step 6: Inspect on arrival and report defects the same day

Inspection happens at the point of unloading, while the evidence is still there:

  • Photograph crate condition before opening — external damage tells you where an impact occurred.
  • Count crates against the packing list and record any shortage immediately.
  • Open a representative sample from each stack, checking corners, edges and gloss surfaces for chips and abrasion.
  • Group panels by room against the layout drawings so the installer is not sorting cartons on the day.
  • Report defects the same day with photographs, carton numbers and the packing list reference.

Small surface marks are normal on any gloss finish and can be dealt with on site; a chipped corner or a warped carcase is a claim. If your package includes installation support, the inspection also becomes the snag baseline: what was delivered and undamaged is recorded before work starts, which protects both sides at handover.

Keep the carton list with you during that process. A defect report that names the crate, the panel reference on the packing list and the room it belongs to can be actioned immediately; a report that says "one door is damaged" cannot.

A pre-delivery checklist for procurement teams

StageConfirm and record
Order releaseSite-verified measurements, finish schedule per run, hardware list, sign-off drawing
ProductionBatch consistency across rooms, finish approval sample, carton dimensions and cube
DispatchLoading plan, container photographs, seal number, bill of lading
In transitTracking milestones, arrival window, insurance cover in force
ClearanceInvoice and packing list consistency, importer of record named, permits lodged
On siteStorage area ready, unloading crew booked, inspection protocol agreed

None of these steps is difficult on its own. What makes international cabinetry feel risky is that the stages are sequential and unforgiving: a late finish decision pushes production, which collides with a fixed sailing, which lands a container at a site still in plaster. Whoever coordinates those hand-offs — the supplier's project manager or your own — matters more than the freight rate.

Where to go next

If you are sourcing cabinetry as part of a wider fit-out, consolidating it with other joinery and finishes under one turnkey interior project solution reduces the number of separate consignments to coordinate. The same team then holds the drawing, the production schedule and the delivery sequence in one place, which is where most of the savings on a project order actually come from. See how furniture logistics and door-to-door delivery is handled alongside installation for interior projects, and send your drawings and target installation date so the freight plan can be built backwards from site reality rather than forwards from a catalogue.