A glass corner wardrobe is one of the easiest built-ins to specify badly and one of the most expensive to fix after production starts. Here is exactly what a manufacturer needs from you to price it properly, and how our quotation process works.
Corner wardrobes sit in the awkward part of a room, and glass corner wardrobes add glazing, door mechanics and frame tolerances on top of that. Because we build them to your dimensions rather than to a standard catalogue size, the quality of your enquiry directly decides how accurate the price is and how few revisions you need later. This guide walks through the information to gather before you write to us, what we send back, and the checks we run before anything goes into production.
Why a Corner Wardrobe Quote Is Never a Single Number
With a straight-run wardrobe, two projects of similar length land in a similar price band. A corner unit does not behave that way. The return leg changes the carcass construction, the way shelves are cut and supported, and often the door configuration on both faces. Glass doors make this more pronounced: each glazed leaf carries hardware rated for its weight and height, and the frame profile has to hold that glass square over years of use.
Our Glass Corner Wardrobes are made to measure, with the layout, materials and finish specified per project. That is why we quote from your drawings and specification rather than from a size chart, and why two projects with the same footprint can price differently once interior fittings and glazing type are set.
What We Need From Your Enquiry
Send the items below and we can usually come back with a usable quotation instead of a round of questions.
| What to send | Why it matters for the price |
|---|---|
| Room drawings or measured photographs | Overall length, return length, ceiling height and the exact corner angle. Out-of-square walls are common in older villas and change both the scribe allowance and the door geometry. |
| Door type for each face | Hinged, sliding or open. Corner access is constrained by which leaf opens first, so this drives hardware selection more than anything else you specify. |
| Glass type and colour | Clear, bronze, smoked, frosted or ribbed glass each behaves differently with light and fingerprints, and each pairs with specific frame finishes. Tell us the room's daylight situation and we will advise. |
| Interior layout preference | Hanging zones, shelves, drawers, pull-out accessories and lighting. Interior fittings are quoted by module, so a sketch of how you intend to use the space is worth more than a finished render. |
| Finish direction | Frame colour, carcass board, handle style or handleless profile. Send reference images or an existing joinery schedule if the wardrobe has to match other cabinetry in the project. |
| Project location and delivery terms | Where the unit is going, and whether you take delivery at site, port or warehouse. This sets freight, packaging and container-loading arrangements. |
A Practical Enquiry Template You Can Copy
If it helps, structure your message like this:
- Project: villa, apartment, hotel guest room or serviced residence; new build or renovation.
- Quantity: how many corner units, and whether matching straight runs are also needed.
- Dimensions: both run lengths, height to ceiling, depth, and the measured corner angle if it is not 90 degrees.
- Reference: a link to the product you are interested in, or photos of what you want.
- Constraints: skirting, cornices, radiators, beams or anything that interrupts a wall face.
- Timeline: target installation month, so production and freight can be planned backwards from it.
For whole-room work, the same brief supports more than the wardrobe. Our custom furniture manufacturer service covers bespoke design and prototyping, material and finish selection, and OEM production, so bedroom joinery, media walls and door panels can be specified together and produced against one drawing set.
What Happens After You Send the Enquiry
Our process follows the cooperation steps we work to on every project:
- Project brief and design proposal. We review your drawings, flag anything that will not build as drawn, and propose a layout. If you have no drawings yet, our interior design services team handles space planning, concept design and 3D visual renderings before anything is priced for production.
- Quotation and detail confirmation. You receive an itemised quotation by module: carcass, doors, glazing, hardware, interior fittings and lighting. Nothing enters production until the drawings and specification are signed off.
- Production, shipment and follow-up. We manufacture to the approved drawings, then arrange packing, container loading, export paperwork and door-to-door delivery under our one-stop furniture and building materials supplier arrangement. Installation guidance and after-sales support follow the delivery.
The Checks We Run Before Confirming Your Drawings
These are the points where corner wardrobe projects most often go wrong, and we verify each one with you before production:
- Floor and ceiling level. Glass doors need square frames. If the floor falls away toward the corner, we either scribe the carcass or set a plinth, and that decision changes the elevation drawings.
- Door swing clearance. A hinged leaf on the short return can collide with the bed, the doorway or an opposite wardrobe. We check the swing against your furniture layout, not just the wall.
- Return depth versus shelf depth. A shallow return leg cannot take a full-depth shelf without stealing hanging space from the main run. This is where drawer and pull-out modules usually earn their cost.
- Glass-to-frame tolerance. We confirm glass thickness, edge treatment and hardware rating against the actual door height you specify, rather than assuming a default.
- Fixity to wall. Built-in corner units anchor to adjacent walls. If one face is stud partition or glass, we tell you what blocking is required before your builder closes the wall up.
A note on dimensions. Please measure in millimetres at three points per wall — top, middle and bottom — and send the smallest figure. Corner units are the worst place to absorb even a small discrepancy, and taking the small measurement gives us the tolerance we need to scribe rather than rebuild.
Ordering With the Rest of the Fit-Out
Wardrobes rarely stand alone. If your project also needs kitchen cabinetry, vanity units, wall panelling, doors or flooring, ordering them against one drawing set keeps finishes matched and consolidates freight into fewer containers. That is how our turnkey furniture and building materials company model works for villa and hospitality projects: design coordination, production, logistics, installation support and after-sales under one supplier, with a single point of contact through the job.
We also work with flexible minimum order quantities, which suits developers specifying a repeated guest-room layout as well as homeowners ordering a single bespoke unit.
Send us your corner wardrobe drawings
Email your dimensions, photographs and reference images to santerson@qq.com, or reach us on WhatsApp at +86-13928214007 (PHILLIP). Include your target installation date and we will work backwards from it. Enquiries receive a response within 24 hours, Monday to Saturday.
Start with the product page: Glass Corner Wardrobes.