A glass sliding panel looks simple on a drawing and demanding on site. The panels are heavy, the opening has to be square, the track has to carry the load for years, and the glass type is a safety decision that cannot be changed after the wall is closed in. That is why an installation plan matters more than the product selection itself. Below is the sequence we use for Santerson Glass Sliding Panels, written so a builder, designer or project manager can hand it straight to the site team.

Start with what the panel has to do

Before anyone measures anything, write down the job the wall is being asked to perform. A panel that separates a study from a living room needs a different detail than one that closes off a walk-in wardrobe or splits a banquet space in half. Note the room it belongs to, how often it will be opened, whether children or guests will operate it, and whether light transmission or visual privacy matters more.

This decision also determines which system from the sliding panel range you are actually specifying. Glass panels keep sightlines open and borrow daylight between rooms; Santerson Acoustic Sliding Panels are specified when sound separation is the requirement; a full Santerson Partition Sliding Systems arrangement covers longer runs that stack back into a pocket. Choosing after the opening is built usually means rework.

Survey the opening, not the drawing

Every plan should carry a survey record taken from the finished floor and finished wall faces, not from an architectural dimension on a PDF. Sliding panels need consistent height across the whole run, and a floor that falls even slightly along the track line will bind the bottom guide.

  • Finished floor level at the left end, centre and right end of the track line, with the difference recorded.
  • Clear opening width and clear height, measured at three points across each dimension.
  • Plumb and square of the jambs, and whether the wall above the head track can carry the suspension load.
  • Position of skirting, architraves, cornices and any recess that the panel must clear when it travels.
  • Location of concealed services — electrical conduits, water pipes, data runs — along the track line and the stacking zone.

Record the measurements on a sketch with the room name and a date. Made-to-measure panels are cut to these numbers, so a survey that is not written down cannot be checked when the crate arrives.

Fix the glass specification in writing

The product listing offers material and finish options rather than one fixed build, so the plan must state what has been chosen. Do not leave glass type for the site team to decide on delivery day.

  • Glass construction — toughened or laminated — and its thickness.
  • Clear, tinted, frosted or patterned surface, and where a mirrored or reflective finish would cause glare from a nearby window or light fitting.
  • Frame profile and colour, and whether the frame matches other aluminium-framed joinery in the same project.
  • Handle style and lock position, especially where a panel closes off a wardrobe or a room used by children.
  • Which edges are exposed and which are concealed inside a pocket or against a wall.

Safety glazing requirements differ between countries, states and building classes. Where the panel forms part of a doorway, a shower enclosure boundary or a low-level barrier, ask the local certifier or building surveyor to confirm what is required before you place the order. Santerson supplies the panels to specification; the certification requirement is a local one.

Specify track, hardware and travel

Half of a sliding wall is mechanical. The plan should show how many leaves there are, which ones move, which direction they travel, and where they stack at the end of the run.

  • Suspension or bottom-rolling system, and why that choice suits this opening.
  • Track length, whether the track is cut on site or supplied to length, and how the ends are finished.
  • Stacking arrangement: bi-parting from the centre, single-stack to one side, or a series of leaves that telescope into a pocket.
  • Clearance needed at the stacking end for overlapping leaves — this is the dimension most often missed.
  • Pivot and bypass geometry where two tracks are used and panels pass each other.
  • Bottom guide or floor track, and how it will be protected from grit during the rest of the fit-out.
  • Soft-close or catch hardware, and door stops at each end of travel.

Where the run is long or the ceiling is a suspended or plasterboard system rather than solid structure, the plan must show what the head track is fixed to. Blocking or a separate support frame is usually specified at this stage, and it is far cheaper to add before the ceiling is closed.

Sequence the panels against the rest of the fit-out

Glass arrives late in most projects and is handled last by everyone on site. The plan should state when the opening must be handed over, because panels cannot be measured reliably until floor finishes, wall finishes and skirting are complete.

StageWhat must be finished before the next step
SurveyFloor finish laid, wall faces plastered and set out, services located and recorded.
ManufactureApproved survey, confirmed glass specification, agreed handle and lock positions.
Head track installationSupport blocking in place, ceiling set-out fixed, level verified along the full track line.
Panel deliveryRoom locked or protected, wet trades complete, dust and grit controlled.
Glazing and hangingTrack cleaned, bottom guide set, leaves hung and adjusted for vertical alignment.
HandoverOperation demonstrated across full travel, hardware tight, protective film removed.

Where the panels are part of a wider wall package — wall panel systems, integrated doors or joinery — order them on the same survey and the same programme. Two suppliers measuring the same opening at different times is a common source of mismatched reveals.

Put responsibilities on paper

The most useful page in the plan is the one that says who does what. For an imported package this usually splits as follows, and each line should be confirmed for the specific project rather than assumed:

  • Supplier: manufacture to the approved survey, packing and container loading, freight and customs documentation, shipment tracking and door-to-door delivery.
  • Local builder: opening preparation, structural support above the head track, making good after installation.
  • Installer: track setting, hanging, adjustment, hardware fitting and operation test.
  • Client or project manager: access, storage for crated panels, sign-off at handover.

Santerson's stated services include installation and after-sales support alongside logistics and door-to-door delivery. For an Australian site, confirm in writing which of those are performed locally for your project, who the attending installer is, and what the warranty covers and excludes. Import terms, duties and transit arrangements also need confirming case by case; they are not fixed across projects.

Site protection and handling

  • Store crated panels upright on a level surface, never flat against a wall or in a wet area.
  • Keep protective film on until the room is otherwise complete, then remove it rather than leaving it to bake in sunlight.
  • Do not slide a leaf along the track while grit, plaster dust or paint drips are on the running surface.
  • Protect the bottom guide during painting and cleaning so it does not fill with debris.
  • Check each leaf for edge chips at delivery, before signing, and photograph any damage on the crate and the panel.

Handover checklist

  • Every leaf opens and closes across its full travel without binding or lifting off the track.
  • Panels hang vertical, with even reveals between leaves and against the jamb.
  • Handles, locks and catches are tight and correctly located.
  • Track is clean, end stops fitted, soft-close working where specified.
  • Glass is clean, free of edge damage, and matches the approved specification sheet.
  • Specification sheet, survey record and hardware schedule filed with the project documentation for future spares.

A note on lead time: panels are made to measure, so the plan should allow time for the survey to be taken from finished surfaces, then for manufacture and sea freight. Building before that survey exists is what forces a compromise on site.

Send us the opening, not just the drawing

For glass sliding panels, partition systems and the rest of the wall package, we work from a finished-surface survey and confirm glass type, hardware and stacking arrangement before manufacture — then arrange delivery to site. Share your room dimensions, drawings and photographs, and tell us how the panel will be used.

Contact PHILLIP by phone or WhatsApp on +86-13928214007, or email santerson@qq.com. Enquiries are answered within 24 hours during business hours, Monday to Saturday.

Explore the range at Santerson Glass Sliding Panels.