A cherry wardrobe looks finished on a sample board and quite different once a whole bedroom wall of it is installed under site lighting. Most disputes over cherry solid wood wardrobes are not about the layout or the joinery — they are about finish details that were agreed verbally and never written into the order. The checklist below covers the points worth putting in writing before production starts.
1. What "cherry" actually means on your quotation
The word cherry can refer to the species, to the cut of the board, or only to a stain colour on a different substrate. Before approving an order, confirm which one you are buying:
- Material declaration. Our cherry solid wood wardrobes sit in the Solid Wood Wardrobes collection with made-to-measure sizing and material and finish options, so the specification sheet — not the product name — is what fixes the timber. Ask for the species named on the specification, and ask which parts are solid timber and which are engineered substrates with a cherry face.
- Cut and grain direction. Plain-sawn and quarter-sawn cherry read very differently across a run of doors. State the required cut, and whether grain must run the same way on every door in the set.
- Colour tolerance between pieces. Cherry moves as it ages, and heartwood and sapwood take colour at different rates. Agree a reference sample and keep it signed; that sample is what you inspect against at handover.
2. The coating: type, sheen and number of coats
"Natural finish" is not a specification. Nail down four separate items:
- Coating system. Lacquer, varnish or oil each behave differently on cherry — different repair behaviour, different feel, different maintenance.
- Sheen level. Matt, satin and gloss change how grain and any colour variation read at arm's length. Confirm the sheen for both carcass exterior and door fronts.
- Coats and sanding between coats. The number of coats, and whether edges and profiles get the same build as flat faces, is what you will feel on a handle edge six months later.
- Underside and back faces. Sealed or unsealed rear panels matter in an attached bathroom or wardrobe wall. Specify them rather than assuming.
For villa and apartment fit-outs where the joinery is one line in a larger package, it is easier to lock these details once across walnut and oak solid wood wardrobes in the same order, so every timber is judged against the same coating standard.
3. Colour matching against the rest of the room
Cherry rarely stands alone. It sits next to flooring, doors and sometimes classic paneled solid wood wardrobes in another room. Confirm in writing:
- Which sample the colour is matched to, and who signed it.
- Whether matching applies across different timber species — a cherry door and an oak skirting can never match exactly, and pretending otherwise creates an argument at handover.
- How the finish should look against the site's lighting. Ask for a large enough sample to view on site, not a card in a showroom.
4. Hardware and detail finishes that get missed
- Hinge brand, opening angle and whether soft-close is included on every door.
- Drawer runner type and load rating, plus whether runners are concealed or side-mounted.
- Handle, knob or integrated pull specification, including finish colour and whether hardware is supplied by us or by the site.
- Interior fit-out finish: shelf edging, hanging rail material, and whether lighting provisions are included in the carcass.
These items rarely appear in a headline price. Ask for them as a line item so nothing is substituted to hold the number.
Before production starts, confirm on paper
- Timber species and cut, plus which components are solid and which are engineered with a cherry face.
- Signed colour and sheen sample, kept for inspection at handover.
- Coating system, number of coats, and treatment of edges, backs and undersides.
- Hardware make, model and finish as a separate line item.
- Final dimensions and layout, since our wardrobes are made to measure for each project.
How we handle it
SANTERSON has manufactured furniture and building materials since 2008, with custom and OEM service covering bespoke finishes, textures and prototyping. Wardrobe orders are made to measure: dimensions, layout, material and finish are specified per project, and specification is confirmed with the buyer before production. If you are specifying joinery as part of a villa or apartment fit-out, send us the drawings and the finish references you want matched, and we will confirm the specification back in writing.
Send us your wardrobe drawings and finish references — we will return a written specification covering timber, coating and hardware before production begins. Contact SANTERSON to start the confirmation.