A request for quote for made-to-measure wall systems lives or dies on the detail it carries. When you send an enquiry about Santerson Glass Sliding Panels, the manufacturer is quoting a configurable product: finish, layout and dimensions are set per project, and the listing itself does not fix glass type, hardware or track details. That means two buyers asking for "the same" panels can receive very different prices, lead times and even product definitions.
The sections below set out what to put in your enquiry so the quotation you receive is comparable, complete and ready to build from — written from the point of view of a procurement manager, contractor or designer specifying sliding panels for a villa, hotel or apartment fit-out.
Why Sliding Panel Quotes Are Harder to Compare Than Furniture Quotes
Loose furniture is specified by model: the item either matches the schedule or it does not. Sliding panel systems are assemblies. A single opening can be quoted with different track types, different suspension methods, different panel constructions and different glass make-ups, and each choice moves both the price and what the installed result actually does.
Because these listings are configurable rather than catalogued to a fixed specification, an incomplete enquiry invites an incomplete answer. A supplier responding to "12 linear metres of glass sliding panels, please quote" has to guess at everything else, and those guesses become the basis of your contract.
The Project Frame: Where the Panels Are Going
Start with context. A quotation prepared for a private villa is not prepared the same way as one for a hotel room or a show apartment, and the differences show up in hardware duty, panel size, handling and replacement parts.
- Project type and location. Residential villa, hospitality, apartment or office; country and city; whether the site is occupied during works.
- Room and function. Closet front, room divider, media wall cover, bathroom-adjacent partition or display screen. The function determines opacity, durability and cleaning expectations.
- Who installs. Your own site crew, a local joiner, or the supplier's installation service. This changes packaging, labelling and whether you need fixing details on drawings.
- Programme. Required delivery date on site, plus any holding points where panels must be stored before the opening is ready.
Dimensions: Give Openings, Not Panel Sizes
You should not be guessing panel widths in your enquiry — that is engineering the supplier does. What you must supply is reliable opening information.
- Width and height of each opening, clearly marked on a floor plan or elevation drawing, with every dimension labelled.
- Finished floor level to finished ceiling level, stated as such, plus the wall build-up if you know it — slab, stud, plasterboard or masonry.
- Whether heights vary along the run. Long runs in existing buildings are rarely level; note out-of-level and out-of-plumb conditions.
- Obstructions: skirting, architraves, light switches, air grilles, door swings, curtain boxes, cornice lines.
- Headroom above the opening and clearance behind the wall — this determines whether a surface-mounted or recessed track is workable.
- Number of openings on the same run, and how the panels stack when they pass one another.
Glass Make-Up and Safety Requirements
This is the item most often left blank, and it is where a request for quote goes wrong. The product page for Santerson Glass Sliding Panels describes configurable sizing with material and finish options, and asks that glass type and safety requirements be confirmed per project — so the enquiry has to say what those requirements are.
- Glass category. Clear, low-iron, tinted, frosted, mirrored or printed. State which, and give a reference if you have one.
- Construction. Single glazed, double glazed, laminated, or glass applied to a panel core. This affects weight, sound behavior and edge treatment.
- Safety expectation. State the requirement rather than assuming it: impact resistance, whether the glazing is in a traffic-adjacent position, and whether child-occupied or commercial use applies.
- Local regulation. Ask the supplier to confirm what they can provide for your market and let you verify acceptance with your certifier or building surveyor. Do not accept a blanket statement of compliance in place of documentation.
- Edge and surface finish. Polished, ground or seamed edges; whether finger marks and cleaning are a factor for the chosen glass.
If you are specifying several panel types across one project — for example Santerson Acoustic Sliding Panels in a media room alongside glass panels elsewhere — state the performance expectation for each separately. Acoustic behavior depends on the selected configuration, so ask what the chosen build is intended to do and how it will be verified.
Hardware, Track and Operation
The mechanism is what a user touches every day, and it should be quoted explicitly rather than bundled into a single line price.
| Item to specify | What to ask for in the quote |
|---|---|
| Track type and mounting | Top-hung or bottom-rolling; surface-mounted or recessed; load rating for the panel weight you are being offered. |
| Panel count and stacking | How many panels per opening, which direction they stack, and the pocket space required. |
| Handles and frames | Frame profile and finish, integrated or surface handles, and whether handles interrupt the glass face. |
| Stopping and locking | End stops, flush bolts, key lock or child restraint where required. |
| Runner and service parts | Whether replacement rollers and track sections can be ordered later, and under what reference. |
| Operating effort | Maximum single-panel weight and expected push force, particularly for tall or double-glazed panels. |
Related Systems Worth Quoting in the Same Enquiry
Sliding panels rarely sit alone. Where a wall is doing more than one job, quote the assembly together so interface details are resolved once, rather than through three separate orders that arrive with incompatible finishes.
- Santerson Closet Sliding Panels — where the panels close a wardrobe or storage bay and internal layout has to coordinate with panel thickness.
- Santerson Partition Sliding Systems — where the panels divide space rather than close an opening, and track and hardware are set by the available opening.
- Santerson Textured Sliding Panels — where opacity and surface texture matter more than transparency.
- Santerson Sliding Panel TV Systems — where the panel conceals a screen and services behind it, so cable routes and access need planning.
- Wall Panel Systems — for the fixed wall returns that the sliding track has to meet cleanly.
Finishes, Colour and Sample Approval
State the finish you want in words and in references, then require a physical sample before production. Frames, anodised or lacquered metals and glass tints all read differently on screen than under site lighting.
- Frame material and surface treatment; brand or colour reference where you have one.
- Glass sample mounted in the actual frame profile, not a loose offcut.
- Your approval process: who signs off the sample, how long it takes, and what is fixed at sign-off.
- Batch consistency for repeat orders — ask how the finish will be matched on later tranches.
Quantities, Packaging and Site Logistics
Glass and large panels are freight problems before they are installation problems. Put the delivery reality in the enquiry so it is priced, not discovered.
- Quantity per opening, listed opening by opening, with a drawing reference for each line.
- Delivery address and access: ground-level dock or upper floor, lift dimensions, stair width, crane or hoist needs.
- Incoterms and delivery basis — the Santerson logistics service covers sea, air and rail freight with customs paperwork and door-to-door delivery; confirm the terms, duties and delivery scope for your specific import rather than assuming them.
- Packaging standard: crating, glazing protection, individual panel labelling against the drawing schedule.
- Staging: whether the order can ship in tranches if openings complete at different times.
Commercial Terms to Require in Writing
- A line-by-line price schedule per opening, not one lump sum for the wall.
- What is included and excluded: track, glass, hardware, fixings, drawings, samples, freight, insurance, installation supervision.
- Validity period of the quotation, and what voids it (drawing revision, finish change, dimension change).
- Payment stages tied to drawing approval, sample approval, production release and shipment.
- Production lead time stated from sample sign-off, not from order date.
- Change-order pricing basis for dimensions revised after measurement.
- Warranty scope on the mechanism as well as the panels, plus spare-part availability terms.
A Simple Checklist Before You Send the Enquiry
- Project type, location and installation responsibility stated.
- Drawings attached with every opening dimensioned; measurement responsibility agreed.
- Glass category, construction and safety expectation written per opening.
- Track, hardware, panel count and stacking direction requested as priced items.
- Finish references given and sample approval built into the programme.
- Delivery address, access constraints and Incoterms stated.
- Required delivery date on site and any phasing noted.
- Same enquiry sent to every bidder in the same format, so responses are comparable.
Frequently Asked Questions
Should I give panel sizes or just opening sizes?
Give opening sizes with drawings. Panel division, track layout and maximum panel weight are the supplier's engineering decisions, and specifying them yourself transfers the risk to you.
Why does one quotation come in far below another for the same wall?
Usually because glass construction, hardware duty or track type differ between the offers. Compare the assemblies line by line — panel construction, mechanism and load rating — before comparing totals.
Can I order replacement rollers later?
Ask this in the enquiry and require it in writing. Hardware is often discontinued or changed between production runs, so the reference you hold after installation determines whether spares remain available.
Do glass sliding panels suit every opening?
Not automatically. Headroom, floor build-up, out-of-level runs and pocket space all constrain what can be installed. Raise these constraints in the enquiry so the supplier proposes a workable configuration instead of an ideal one.