A short design intent note such as "concealed doors, seamless with the wall" is enough to start a conversation, but rarely enough to get an accurate quotation. Below is the practical sequence we use on villa and apartment projects so that a flush door concept becomes a confirmed, made-to-measure order instead of a round of guesswork.

Why the Design Brief Alone Cannot Price a Concealed Door

A finished wall line depends on decisions that sit behind the visible surface: what is inside the wall, which hardware carries the leaf, how the wall finish continues across the door face, and where the opening sits relative to flooring, skirting and ceiling. Two projects whose briefs read identically can therefore need very different construction. That is why Flush Wall Aligned Doors are quoted from drawings and confirmed specifications rather than from a room name or a reference photograph.

Our product pages list three configuration points for this collection — made-to-measure sizing, material and finish options, and a layout tailored to the project. Turning those into an order simply means supplying information against each of them.

Step 1: Fix the Opening on a Drawing, Not on Site

Before anything else, mark every concealed opening on a plan or elevation for each room. A door that only exists in a mood board cannot be built to align with a wall that has already been set out.

  • Opening width and height, plus the finished floor level the measurement refers to.
  • Which side the hinges sit on and which direction the leaf swings — into or out of the room.
  • Single leaf or paired leaves, and whether any leaf stays permanently fixed.
  • Clearance from corners, switches, skirting and any return wall that the door face has to match.
  • Whether the wall above and beside the opening is a new partition or an existing structure.

Where the same wall carries both a door and panelling, send them as one drawing. Integrated Door & Paneling is specified that way: the leaf and the surrounding panels are produced together so the joint lines, reveal and surface finish read as one plane.

Step 2: Choose the Operating Type Early

The opening detail changes with the operating type, so decide it before hardware is discussed. Within our Windows and Doors range, these are the types most often compared at brief stage:

TypeWhat it settles at brief stage
Santerson Flush Hinged DoorsSingle or double swing, hinge side and hand, hidden hinge choice, whether the leaf sits on one face of the wall or is aligned to both.
Santerson Flush Sliding DoorsTrack position, pocket depth or surface run, wall build-up needed to carry the gear, and clearance for handles.
Santerson Handleless Concealed DoorsHow the leaf is opened without visible ironmongery, and how the wall finish wraps the edge.
Santerson Decorative Concealed DoorsWhether the door face carries a pattern or moulding that must continue the wall treatment.
Santerson Flush Interior DoorsA flush interior leaf where the full concealed-wall build is not part of the scope.

If a hinged or standard opening suits the budget better, Standard Interior Hinged Doors and Classic Panel Hinged Doors are specified on the same drawings, so you can compare both on one page.

Step 3: Decide How the Door Face Finishes

This is where most enquiries stall. Tell us what the finished wall looks like, and we match the leaf to it:

  • Painted flush. The door face takes the same primer and paint system as the wall, with a shadow gap or square edge — state which profile you expect.
  • Veneered or laminated. Grain direction and board layout across the leaf and adjacent panels need to be agreed before cutting. Our Wood Veneer Panels and Wood Veneer Hinged Doors are matched this way.
  • Panelled or moulded. Send the panel layout, spacing and moulding profile so the leaf repeats them exactly.
  • Stone, tile or cladding. Note the thickness and the fixing method, since these set the leaf build-up.

Attach a finish schedule or a sample reference. A material name alone — "oak", "matte lacquer" — is not enough to reproduce a surface across separate production batches.

Step 4: State the Wall Build-Up and Hardware Intent

Concealed doors are only as good as the wall they sit in. Share what you know, even if it is provisional:

  • Partition type and total thickness, including insulation or acoustic infill where specified.
  • Required leaf size beyond standard heights — floor-to-ceiling openings are common in villa work and change the hardware selection.
  • Hinge hand and load intent, plus whether concealed hinges or a pivot are expected.
  • Ironmongery: concealed handle, edge pull, magnetic catch, door closer, or access control.
  • Acoustic or privacy performance called for in the specification, so we can confirm what the build supports.

Where you are unsure, say so and mark it as an open item. An honest open item is easier to resolve at quotation stage than a wrong assumption carried into production.

Step 5: Send One Enquiry Pack

A complete pack usually closes the specification in one pass rather than several:

  • Plan and elevations with every opening numbered, dimensioned and handed.
  • A door schedule listing type, size, finish, hardware and quantity per room.
  • Finish samples or a written finish reference for the leaf face and surrounding panels.
  • Wall build-up details, finished floor levels and ceiling heights.
  • Project location, delivery address and the stage your programme is at.

Because doors are rarely ordered alone, projects that also need joinery, wall finishes or loose pieces can be handled together. As a one-stop furniture and building materials supplier, we coordinate cabinetry, wall panelling, flooring and doors on the same package, which keeps finishes matched and deliveries consolidated.

Step 6: What Happens After You Send It

Our cooperation steps follow a fixed sequence: project brief and design proposal, then quotation with detail confirmation, then production, shipment and follow-up. For your doors enquiry that means:

  1. We review the drawings and schedule, then come back with the points that are unclear — usually wall build-up, hardware hand or finish reference.
  2. You receive a quotation against confirmed dimensions, materials and configuration, itemised by opening.
  3. Layouts and finishes are signed off before cutting, so what is made matches what your drawings show.
  4. Production, packing and shipping follow the agreed programme; delivery, installation support and after-sales cover are part of the same scope if you need them.

A note on lead times and site conditions. Concealed openings interact with wet trades, flooring and ceiling set-outs. Confirm your opening sizes against the completed wall build before final sign-off — we manufacture to confirmed dimensions, and a measurement taken before the wall is finished is not a safe basis for production.

Questions Buyers Ask Before Submitting an Enquiry

Can you match a flush door to wall panelling already specified elsewhere?

Yes, provided we have the panel layout, moulding profile and finish reference. Send those with the schedule and we align the leaf face and joint lines to them.

We are renovating, not building new. Is a concealed door still possible?

Often it is, but the existing wall thickness and structure need checking first. Send photographs and measured sizes of the current opening and we will confirm what the build supports before quoting.

Can doors be ordered together with wardrobes and kitchen cabinetry?

Yes. Under our Turnkey Interior Project Solutions, joinery, panelling and doors are produced on one package so finishes and reveal details match across the project.

Do you supply to Australia as part of a larger fit-out?

Yes. We ship furniture and building materials for villa and apartment projects, with freight arrangements, packaging and container loading handled as part of the order. Import terms and delivery scope are confirmed per project.

Putting It Together

The difference between a slow enquiry and a fast one is not detail — it is the right detail. Numbered openings on drawings, an operating type chosen early, a clear finish reference for the door face and an honest list of open items: send those with your schedule and your Flush Wall Aligned Doors specification moves from concept to confirmed order without repeated rounds.

When your drawings are ready, send them through our contact page with the project location and programme stage, and we will return the points that need confirming along with a quotation against the specified configuration.