Most disputes on a built-in joinery package do not start with workmanship. They start with a specification that left too much open. “Full house custom wall cabinets, arched detail, warm wood grain” can mean very different things to an interior designer, a site builder and a factory two thousand kilometres away. The Arched Niche & Full House Custom Wall Cabinet Project we delivered is a useful reference point, because it bundles several different elements into one wall-driven scheme: an arched display niche with concealed lighting, layered floating shelves, a full-height flush wardrobe, an integrated vanity with drawers and an arched textured glass panel, plus a stone bathroom countertop with twin basins.

Below is the specification structure we ask buyers, designers and builders to complete before a quotation is issued. It is the same structure we work from on villa and residential fit-out packages, and it applies whether you are specifying one wardrobe wall or a whole-house joinery scope.

In short: a workable specification for an arched niche and full house custom wall cabinet project defines six things — the scope of each element per room, the substrate and surface system, the arch geometry and how it is produced, the internal layout and hardware, the integrated lighting and electrical interface, and the survey plus installation sequence. Anything left undefined becomes a variation later.

1. Scope by room, not by product name

The first mistake is specifying items instead of walls. A wall cabinet package should be listed per space, with the wall identified and the element named. In our project, the bedroom wall carried three separate elements that had to be designed as one composition: open display niches for ceramics and artwork, a full-height concealed wardrobe behind flush wood grain panels, and a vanity table with drawers beside it. The bathroom was a separate line item — a countertop with two basins in a veined natural stone.

Write the scope as a room-by-room schedule. For each wall state whether the unit is built-in or freestanding, whether it runs floor to ceiling, and whether adjacent finishes (skirting, cornice, flooring, tiling) are in your joinery scope or another trade's.

  • Room and wall reference tied to the architectural drawing number, not a room name alone
  • Element type: display niche, floating shelf, wardrobe, vanity unit, countertop
  • Built-in or freestanding, and whether it is fixed, suspended or recessed into the wall
  • Finish handover points — where the joinery ends and paint, tile or flooring begins

2. Substrate, surface system and edge treatment

“Wood grain” is not a specification. In a full-house package the same visual tone may be required across wardrobe doors, niche surrounds, a vanity carcass and a media unit, and those parts are made differently. State the board substrate, the surface system and the edge treatment for each element. Our custom minimalist bedroom wardrobe range is specified on stable board materials with flat panels in matte or gloss surfaces; the same logic applies when a warm wood grain has to be repeated across several element types without visible tone drift.

ElementWhat to specifyWhy it matters on site
Wardrobe doors / flush panelsSubstrate, surface (veneer, lacquer, melamine, acrylic), grain direction, edge band or mitred edgeGrain direction and edge detail decide whether a wall of panels reads as one surface or a grid of separate doors
Arched niche surroundFrame construction, radius, whether the arch is formed or solid-surfaced, finish continuity into the revealAn arch cannot be corrected on site; the radius and finish must be agreed from a shop drawing
Floating shelvesBoard thickness, hidden bracket type, load expectation, maximum unsupported spanThin shelves with heavy ceramics need concealed reinforcement inside the wall or carcass
Vanity carcass and drawersCarcass material, moisture exposure level, drawer system, pull-out configurationBathroom-adjacent units sit in a different humidity regime than a bedroom wardrobe
Stone countertopStone type and slab reference, thickness, edge profile, basin fixing method, cut-out positionsSlab veining is unique; approve the actual slab or a cutting diagram, not just the stone name

3. Arch geometry: fix the radius on paper before anything is cut

The arch is the element that most often arrives wrong. As a custom furniture and interior products manufacturer, we fix this geometry on a shop drawing before production starts. Specify the clear opening width, the springing point (where the curve starts from the vertical), the radius or the rise, and whether the arch is a semicircle, an ellipse or a soft segmental curve. Then state how it is produced: bent lamination, CNC-machined solid, or a formed frame with a finished face. In our project the arched wall niche was designed as a display shelf for artworks and decorative ceramics, with built-in LED lighting inside the reveal — which means the arch profile also carries the light line and any driver access.

Where an arch is repeated, ask for one prototype or a dry-assembled section before the full package is produced. This is where our Custom & OEM service is genuinely useful: prototyping and 3D modelling are part of the process, so the curve, the reveal depth and the finish can be signed off physically rather than argued over from a rendering.

Rule of thumb: if a dimension cannot be drawn to 1:1 on a wall, it will not be agreed on site. Draw the arch at full size.

4. Internal layout and hardware schedule

A flush wardrobe looks identical whether it holds two hanging rails or a drawer-focused fit-out. Specify the internal layout per unit: hanging zones by height (short and long hang), shelf spans, drawer counts and heights, and any dedicated storage such as laundry hampers or an ironing bay. Our full height storage walls and open display niches in the integrated storage wall collection are configured per project — made-to-measure sizing with material and finish options chosen at order stage.

  • Hanging rail heights and quantities, including pull-down rails for tall wardrobes
  • Drawer stack: number, internal height, runner type and soft-close requirement
  • Open versus closed ratio — display shelving needs a stated load and span limit
  • Handle or handleless: profile of the recessed pull, push-open mechanism, or integrated lip
  • Integrated accessories: lighting, mirrors, tie and tray rails, ventilation grilles

Hardware should be named by brand and line, or at minimum by duty cycle and load rating. A hinge specified as “soft close” with no model reference is not a specification; it is an intention.

5. Integrated lighting and the electrical interface

Lighting inside joinery has to be designed jointly with the cabinet, not added after production. For our arched niche this meant the light line followed the curve of the reveal; for the vanity it meant an arched textured glass panel behind the working surface, which changes where wiring and a driver can sit. Specify fitting type, colour temperature, dimming method, driver location and how the driver is accessible after installation.

Our integrated cabinet lighting is configured with the cabinet design, and electrical specification and compatibility are confirmed for each design. Two points settle most on-site arguments: who runs the conduit and the isolator (electrician or joinery contractor), and where the driver sits. Record both in the drawing.

6. Survey, drawings, tolerances and installation sequence

Full-house joinery fails when the second survey is skipped. Specify that dimensions are taken on site after flooring, plastering and tiling are complete, and that shop drawings are issued for sign-off before production starts. Our one-stop scope covers site measurement, 3D rendering, manufacturing and on-site installation, coordinated through the wider turnkey solutions workflow — consultation, design and planning, production, logistics, installation and after-sales.

  • Which survey is authoritative: design survey or post-competition as-built survey
  • Tolerance policy for out-of-plumb walls — scribe, pack or re-manufacture
  • Shop drawing sign-off stage, with who signs and what version is frozen
  • Delivery sequence per room, so completed units are not damaged by later trades
  • Snag list and handover record at completion

For imported packages, add the logistics line to the specification: container loading plan, packaging standard, delivery terms and who receives goods on site. Freight is documented under logistics and door-to-door delivery, with installation and after-sales handled separately under installation and after-sales support. Confirm scope, terms and current service coverage for your project location rather than assuming them.

A practical specification checklist

SectionMust be defined before quotation
ScopeRoom-by-room element schedule, drawing references, finish handover points
MaterialsSubstrate, surface system, edge treatment, grain direction, slab or veneer approval
ArchWidth, springing point, radius or rise, curve type, production method, prototype stage
InternalsRail heights, drawer schedule, shelf spans and loads, handleless detail, hardware model
LightingFitting type, colour temperature, dimming, driver location, access, electrical responsibility
DeliveryAuthoritative survey date, shop drawing sign-off, tolerance policy, install sequence, snag process
Verify before you order. Stone veining, veneer matched lots and arch prototypes are approved physically. Dimensions, materials, electrical ratings and installation requirements must be confirmed for each configuration on the drawings that govern your project — not inferred from a catalogue page or a rendering.

Why a single supplier makes this easier

An arched niche, a flush wardrobe wall, an integrated vanity and a stone countertop sit in different categories on most supplier lists. Splitting them across four vendors means four drawings, four tolerance regimes and four sets of variations. As a one-stop furniture and building materials supplier, we produce wall-driven joinery, interior fixtures and finishes as one coordinated package, which keeps the arch profile, wood tone and lighting detail consistent across rooms.

Send us your wall elevations

Share drawings or photographs of the walls you want resolved, with room names and target completion. We will return a material and layout proposal, 3D rendering and itemised quotation for an arched niche and full house custom wall cabinet package.