When a hotel, resort, clubhouse or residential amenity scheme reaches the wet-area line item, the swim spa proposal usually arrives as a one-page specification sheet with a model code on it. If that code is WS-PC05, the question for a procurement team is not whether the unit exists — it is whether the document in front of them actually describes the unit their site needs. The following checklist walks through the places where commercial swim spa proposals are most often incomplete, using our Outdoor Swim Spa WS-PC05 as the worked example.

Start with the shell dimensions, not the jet count

Catalogue data for WS-PC05 gives a footprint of 5000 × 3000 mm and an overall height of 1100 mm. Before anyone discusses jets, read those numbers against your setting-out drawing. Height is the figure that gets quietly changed between tender and construction: a lower shell is cheaper to build, ship and fill, but it changes how an adult stands in the water and how the jet array performs. Our catalogue also lists closely related variants under the same 5000 mm length — one at 5000 × 3000 × 900 mm and others at 5000 × 2400 × 1470 mm — which is exactly why the model code has to appear in the quotation, the drawing and the packing list, all matching.

Ask your supplier to confirm three things in writing: the external footprint, the overall height, and whether that height includes steps, coping or an integrated plant compartment. A difference of a few hundred millimetres in shell width is invisible on a marketing render and expensive on site once waterproofing and tiling are set.

Check that hydraulic equipment is itemised, not bundled

The catalogue entry for WS-PC05 lists one water pump, one filter pump, eighteen jets, two LED lights and a total power figure of 2.25 kW. A usable proposal does not stop at "18 jets". For a commercial duty cycle — many users per day, shared changing facilities, an operator on staff — the itemised list should name:

  • the circulation pump and the filtration pump as separate line items, with flow rate stated for each;
  • the jet layout and how many jets are adjustable, plus where they sit in the shell;
  • the water treatment method shown for that configuration — ozone is listed on WS-PC05, while UV sterilisation appears in our optional-accessories list rather than as standard kit;
  • filtration media type, since sand filtration is an option and not standard on this configuration;
  • the control system, quoted as one set with its user interface described.

Where a proposal bundles all of this into "complete equipment package", request the itemised schedule before you compare prices. Two quotations that look identical at package level frequently differ on pump size and treatment method.

Reconcile the power figure with your electrical design

Total connected load for WS-PC05 is shown as 2.25 kW in the catalogue. Treat that figure as the base configuration and check what it covers: heating equipment appears on our optional-accessories list, so a heat pump added to the same shell changes the load materially, and with it the cable run you may have already priced. Reconcile the number against three documents — the electrical single-line diagram, the tariff your operator will actually pay, and the distribution board serving the terrace, rooftop or spa deck.

A practical test: ask the supplier to state, per configuration, the total connected load and whether that figure includes heating. If the answer is ambiguous, the electrical contractor will discover it during installation, at your cost.

Treat options as part of the price comparison

Options listed for this range include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Two buyers comparing "the same" model can end up with very different delivered products if one quotation includes insulation and steps and the other treats them as site-supplied extras. Insulation in particular is easy to omit from a tender and hard to retrofit on an outdoor shell that runs overnight.

Put every option in a column of your comparison sheet, mark each one included / excluded / site-supplied, and have the supplier confirm the sheet in writing. This single step removes most post-award disputes over what was actually priced on wet-area equipment.

Confirm the model variant matches the brief

The PC05 family covers more than one use case. If the brief calls for lap swimming or counter-current training, check whether the quoted unit lists a swim training system at all — WS-PC05 does not list one in its catalogue specifications, while the taller 1470 mm versions in the same family do. That is a specification mismatch to resolve at tender stage, not on site with a programme slipping.

What the brief asks forWhat to verify in the proposal
Hydrotherapy and seating for guestsJet count and layout, adjustable jets, shell height suited to seated use
Swim training or counter-current swimmingA named swim training system and the internal length it needs
All-year outdoor operationHeating option, insulation, control strategy for unattended periods
Low-maintenance public useFiltration type, sterilisation method, access for servicing the equipment

Read the delivery and after-sales scope as carefully as the product

A swim spa is a freight problem before it is a plumbing one. Our logistics and door-to-door delivery service covers sea, air and rail freight with customs paperwork, packaging and container loading planning — for an oversized shell, ask which mode is quoted, who handles the last metre into the plant room or onto the slab, and who bears damage in transit. Then read the installation and after-sales support terms: commissioning, snag inspection, warranty scope, spare parts availability for pumps, jets and controls, and who responds when a unit is out of service during peak season.

Where the swim spa sits inside a wider amenity package — swimming pools and swim spas alongside outdoor furniture, wall cladding and lighting — coordinating one supplier for the whole wet-and-outdoor zone removes interface disputes between trades. Our turnkey project solutions are built around that single-point-of-contact model: design consultation and space planning, material selection and product specification, manufacturing with quality control, site coordination, then installation and handover.

Where customisation belongs in the process

Standard shells do not always fit. A terrace with a structural bay, an L-shaped rooftop deck or a spa alcove with a view to frame may need a non-rectangular basin; our customisable shape outdoor spa is produced in square, round, oval and curved layouts on an acrylic shell with structural reinforcement. If you go that route, add time for design sign-off: a bespoke shell needs drawings approved before production starts, and the approval date — not the purchase order date — drives the delivery programme.

Rule of thumb: if a proposal can be compared on price alone, it is not detailed enough to award. The comparable version names the shell dimensions, every hydraulic component, the treatment method, the connected load with heating stated separately, and the delivery and commissioning scope.

A short pre-award check

  • Model code identical in quotation, drawing, packing list and invoice draft.
  • External footprint and overall height both stated, not just length.
  • Pumps, jets, filtration, sterilisation and controls itemised with quantities.
  • Total connected load given, with heating shown as a separate figure.
  • Options marked included / excluded / site-supplied and initialled by the supplier.
  • Freight mode, offloading responsibility and commissioning attendance named.
  • Spare parts for pumps, jets and controls identified with lead times.

Figures quoted above are catalogue values for the referenced model and configuration. Included equipment, options and electrical requirements vary by configuration and site conditions, so confirm them on your specific quotation before ordering or issuing construction information.

Send us the model code, your setting-out dimensions and the duty you expect from the unit, and we will return an itemised specification with options priced separately — including heating, insulation and filtration — so you can compare quotations on a like-for-like basis. As a one-stop furniture and building materials supplier, we specify the shell, equipment and finishing trades for the same zone from one drawing set — start with the specification rather than the price.