A raised panel wardrobe looks simple on a drawing — a frame with a profiled centre panel that stands proud of it. That simplicity is exactly why enquiries go wrong. Two buyers can send the same phrase, "raised panel wardrobes", and receive two completely different quotations, because one has specified a shaker-style moulding and a painted MDF door, while the other has specified solid timber construction with a raised field, a specific grain direction and full-height doors that no standard panel size can produce.

Before you contact a furniture and building materials supplier, it is worth assembling the information that lets them quote accurately the first time. The list below is what we ask our own project customers for, and it is the difference between an enquiry that closes in a few rounds and one that stalls on drawings.

1. Room dimensions and the constraints around them

Give overall length, height and depth, then mark what interrupts the run: skirting boards, architraves, ceiling cornices, downlights, air-conditioning grilles, power points, light switches, radiator pipework and door swings. For built-in work, note where walls are out of plumb — a raised panel door that must sit flush against an uneven wall needs scribing or a filler strip, and that is a manufacturing decision, not a site one.

  • Floor-to-ceiling height measured at several points, not just one.
  • Whether the wardrobe runs into a corner, and whether the return is 90 degrees or off-square.
  • Clearance in front of the doors: hinged doors need room to swing; sliding doors do not, but they need track depth.
  • Access route at delivery — stair width, lift door height, corridor turns, and whether the unit can arrive assembled or must be flat-packed and built on site.

2. The profile itself, not just the word "raised"

"Raised panel" describes a family of profiles, and the visual result varies widely. Attach reference images and state which parts you are fixing: rail and stile width, whether the moulding is a simple stepped profile or a deeply sculpted one, and how much of the centre panel stands proud. If your project already has skirting, architraves or panelled interior doors, send photographs of those too — matching an existing profile is a much easier conversation than describing one from memory.

Our Raised Panel Wardrobes sit within the Classic Paneled Wardrobes collection, and their finish, layout and dimensions are set per project rather than chosen from a fixed size grid. Related profiles in the same family — Recessed Panel Wardrobes and the shaker panel wardrobe — are worth comparing side by side, because a raised profile reads heavier in a small bedroom and a flat or recessed profile reads lighter in a low-ceilinged one.

3. Construction and substrate decisions you should make early

A raised panel door is a frame plus a centre panel, and both can be built several ways. The choice affects cost, how the door behaves in changing humidity, and what finishes are possible.

ElementWhat to decide before you enquire
Frame (rails and stiles)Solid timber or engineered substrate with a moulded profile. Solid timber moves with humidity; engineered substrates stay dimensionally steadier under paint.
Centre panelA solid panel floating in the frame, or a panel set into a grooved assembly. This governs whether the door can be made very tall without a mid-rail.
CarcaseMatching timber, laminated board, or a carcase finish that deliberately contrasts with the doors.
FinishSprayed paint in a specified colour reference, lacquer, veneer or foil. Specify the standard you are matching — a brand and code, not a photograph.

If you want painted doors on a project with a colour schedule, send the schedule itself. Paint colours cannot be judged from an image on a screen, and a supplier working from a photograph will match it badly and blame the reference.

4. Interior layout, in your own measurements

Do not let the supplier guess how you store things. Sketch the interior: hanging sections split at what heights for shirts, coats and dresses; drawer counts and whether they sit above or below hanging rails; shelves for folded linen; a dedicated bay for an ironing board, hamper or vacuum; lighting inside the carcass; and provisions for a safe, trouser pull or jewellery tray. Note the depth of your deepest hanger and whether any garment needs more than the standard hanging height.

Where a fitted layout is not the answer, the same project can be resolved with modular systems instead — Combination Modular Wardrobes and Island Walk in Wardrobes are both specified per project, and for a dressing room the choice between built-in panelled doors and open modular storage changes the whole budget line.

5. Quantity, phasing and the delivery address

State how many bedrooms the order covers and whether every room takes the same design. Repeat units are what make custom joinery economical; a single bespoke unit and a run of twenty are quoted on different logic. Say which rooms you need first — in renovation work, master-bedroom wardrobes often have to land before guest-room ones.

Give the full delivery address with the receiving arrangements: who signs for goods, whether there is a dock or only a kerb, and what the last leg of the journey looks like. For projects outside the country of manufacture, this is also where you set out who handles import clearance and on which delivery terms. Our logistics service covers freight forwarding by sea, air and rail with documentation support and door-to-door delivery, but duties, Incoterms and transit arrangements are agreed project by project — we do not publish a single guaranteed timeline.

6. Site conditions that affect the doors themselves

Panelled doors are the part of a wardrobe most sensitive to their environment. Tell the supplier what the room actually experiences: underfloor heating, a wall shared with a bathroom, direct sun through an unshaded window, a coastal site, or a property left unheated for months. These conditions influence substrate choice, moisture content at manufacture, paint system and whether a solid timber panel is appropriate at all. An enquiry that mentions none of them produces a quotation that assumes nothing.

7. What to ask the supplier back

A prepared buyer asks questions as well as answering them. Before you commit, request:

  • A production drawing with door elevations, profile sections and interior layout, for your sign-off before manufacturing starts.
  • A physical finish sample of the actual door profile, not a flat colour chip.
  • Written confirmation of the carcase material, edge treatment and hardware brand on the quotation.
  • The packing specification and the assembly sequence, so you can brief your installer or site team.
  • What is covered if a panel arrives damaged, and how replacement panels are matched to the originals already installed.

A practical rule: send one document set rather than a stream of messages. Room dimensions with constraints, profile references, finish schedule, interior layout sketch, unit counts and phasing, delivery address and site conditions — that package lets a supplier return an accurate quotation and a production drawing in the first round.

How SANTERSON works from your enquiry

We have manufactured furniture and building materials for project customers since 2008, with villa, hospitality and office work across several continents. For a wardrobe enquiry, the route is the same as for any fitted item: consultation and space planning, then design and specification with material selection, then manufacturing with quality control, then logistics to site and installation support afterwards. Our Custom & OEM Service covers bespoke finishes and dimensions, prototyping and private labelling for buyers who need the profile developed from their own drawings, and our project services cover coordination through to handover.

If you are specifying panelled wardrobes for a villa or hotel refurbishment, send the seven items above and we will come back with a production drawing and an itemised quotation. Enquiries reach us through our contact page.

Can I order one raised panel wardrobe, or is there a minimum?

Single units and multi-bedroom runs are both possible. Minimum order quantities vary by product and finish, so state your quantity early and we will confirm what applies to your specification.

Do you supply the doors only, without the carcase?

Yes, panelled doors can be made to fit a carcase supplied locally when the opening sizes, hinge positions and door thickness are confirmed on a drawing. Send measured elevations of each opening.

How do I check the profile before production?

Ask for a sample of the moulded door in your chosen finish and a signed production drawing. Both are standard practice on custom panelled work, and neither should be skipped because a schedule is tight.