A mixed open and closed storage wall only works when the drawing, the material schedule and the quotation all describe the same thing. This guide sets out the line items a buyer or specifier should put in front of the factory before Santerson Mixed Open & Closed Storage is priced and made, so that the storage you receive for the room matches what was approved on paper.

Why the Specification Matters More for a Hybrid Wall

Storage that is entirely closed is forgiving. Panels repeat, carcasses repeat, and the differences between units are mostly cosmetic. A wall that combines open shelving, display niches and closed cabinets is different: every change in module type changes the fixing detail, the edge treatment, the load path of the shelves and the way the doors align with the adjacent open bay.

Santerson Mixed Open & Closed Storage sits within the Integrated Storage Walls range and is described as a configurable combination of open and closed storage in an integrated wall system, with finish, layout and dimensions specified per project. That flexibility is the point of the product, and it is also why a vague enquiry produces a vague price. The specification below is the shortest path to a quotation you can compare against another one.

The Six Blocks Every Specification Needs

1. Wall geometry and constraints

  • Overall run length, floor-to-soffit height and depth of the finished wall, taken from a site survey rather than a drawing scale.
  • Position of skirting, cornices, uneven walls or out-of-plaster surfaces, and whether scribing is required.
  • Location of switch plates, sockets, radiators, TV positions and any service runs that must stay accessible.
  • Ceiling type and whether the wall is freestanding, recessed into a niche or built to a structural wall.

2. Module schedule

List each bay from left to right with its width, height, internal arrangement and door or open-face type. A short table is enough:

BayTypeInternal arrangementNotes for the factory
AClosed, full heightHanging rail above, two shelves belowDoor alignment to be continuous with Bay B face line
BOpen displayThree adjustable shelvesConcealed lighting channel required at head
CClosed, lowFour drawersDrawer fronts flush with adjacent carcass
DNiche / recessed openSingle shelf at desk heightSet back from the plane of Bays A and C

If a bay is not on this schedule, it does not exist for pricing purposes. Related layouts in the same family — Santerson Full Height Storage Walls for a closed floor-to-ceiling run, or Santerson Mixed Open & Closed Systems where the wall is treated as modular living furniture — can be quoted against the same schedule so that options are compared on equal terms.

3. Materials and finishes

  • Carcase material and thickness, and whether the carcase colour matches or contrasts with the doors.
  • Door face construction — flat panel, framed, veneer or lacquer — and the edge treatment on visible edges.
  • Shelf material and maximum span before a deflection limit is reached; state the intended load (books, ceramics, media equipment).
  • Colour reference. Give a physical sample number or a supplier colour code, never a photograph alone.

4. Hardware and moving parts

  • Hinge type and whether soft close is required; handleless profile or specified handle, with the handle itself supplied by you or by the factory.
  • Drawer runner rating and the depth of the deepest item to be stored.
  • Adjustable shelf support system — pin, rail or concealed bracket — and hole pitch if it must match existing joinery.

5. Lighting and services

Integrated lighting is where mixed walls most often go wrong on site. Specify the fitting type, its position in the section, where the transformer or driver sits, how it is accessed for replacement, and who runs the supply to the wall: the local electrician or the joinery package. Where a media position is involved, state cable routes and ventilation requirements at the same time.

6. Delivery, access and installation

  • Ship-to address, floor level, lift dimensions and any restriction on delivery vehicle size or working hours.
  • Whether units arrive assembled or flat-packed, and the maximum module size that will pass the access route.
  • Who installs: local contractor or a supervised installation arranged with the supplier. Santerson's stated service scope covers design and production through to door-to-door delivery, installation and after-sales support, so the split of responsibility should be written into the order rather than assumed.

What to Ask the Factory to Return

Before issuing a purchase order, ask for an approved shop drawing showing dimensions and bay sequence, a material and finish schedule naming every surface, a hardware list with make and model, and a packing schedule by module. Those four documents are what you check on delivery and what you hold if something on site does not match.

A practical rule: any item in your enquiry that the returned drawing does not show is an item that has not been priced. Read the drawing against your module schedule line by line, and initial both when they agree.

Confirm Before You Order

Dimensions, material make-up, finish system and load capacity for this product are set by configuration, not fixed in a catalogue. The figures you specify should be confirmed against the production drawings for your project before manufacture starts, and any performance requirement — shelf span, door cycle frequency, fire behaviour of a board, moisture exposure in a wet-adjacent room — should be raised at specification stage rather than at handover.

Getting the Specification Started

Santerson is a China-based furniture and building materials manufacturer working on villa, hospitality and office projects, with custom and OEM capability across cabinetry, joinery and interior fixtures. Send the module schedule, the wall survey and your finish references together, and the specification conversation begins from a comparable position instead of an estimate.

Start a specification enquiry

Project drawings, bay schedule and finish references can be reviewed before a quotation is issued. Contact details are on the contact page, and the full product range is listed under products.

Product configuration, materials and dimensions are confirmed per project; details in this article describe a specification method, not fixed performance values.