A double basin countertop looks simple on a drawing and complicated on site. This guide sets out what buyers should actually compare when sourcing a Santerson Double Basin Countertop: the layout numbers, the basin-to-slab decision, the storage behind the slab, and the documentation that keeps two batches identical.
Start With the Wall, Not the Slab
Two bathrooms with the same wall length can need completely different vanities. Before you request a quotation, fix three measurements on the drawing: the clear wall run, the position of the waste and soil pipe, and where the tap supplies come out of the wall or floor. A fabricated top can be made to almost any width, but drain locations and shut-off valves do not move for free.
Then decide who uses the basins and when. Two people brushing their teeth side by side need more elbow room than two people using the same sink at different times of day. That single question drives basin spacing, mirror width, tap selection, and whether the vanity should be wall-hung or floor-standing.
The Comparison Sheet: Six Things to Put Side by Side
When suppliers quote a double basin top, ask each one for the same six items in writing. Comparing quotes that describe different scopes is where most cost overruns begin.
| Item to compare | What to ask each supplier |
|---|---|
| Overall size and orientation | Width, depth and thickness of the finished top, plus which end holds the drawers and which end is a blank panel. Confirm whether the unit mirrors left or right against your drawing. |
| Basin type and integration | Whether basins sit above the counter as vessels, sit under it as an Undermount Basin, or are formed from the same material as the top in an Integrated Basin. Each option changes cut-out work, sealing, cleaning and tap height. |
| Surface material | The exact slab or engineered surface specified for the project, with its finish. The Stone & Marble Surfaces range covers stone and marble options for tops and matching surfaces. |
| Cabinet construction | Case material, door style, drawer runners, soft-close fittings, and whether the carcass is built for wall-hung or floor-standing installation. |
| Mirror and lighting | Whether an LED Mirror Cabinet is included, how its width relates to the two basins, and how it pairs with the project's Vanity Lighting. |
| Inclusions and exclusions | Taps, waste fittings, traps, sealant, wall protection, packaging and the drawing set. State clearly what is not in the price. |
Basin Choice Changes More Than the Look
Buyers often treat basin style as a cosmetic decision. It also decides installation time and long-term upkeep.
- Above-counter vessel basins sit on top of the slab, so the cut-out is mostly a hole for the waste. They read as a design feature, but tap height and cleaning behind the basin need checking against the mirror. See the Vessel Basin (Above Counter) option.
- Undermount basins are fixed beneath the counter, giving a clear ledge you can wipe straight into the bowl. The cut-out and edge polish must be exact, so ask for the cut-out drawing before production starts.
- Integrated basins are formed from the same material as the top, with no seam to seal. Bowl depth, corner radius and slope to the waste all become fabrication questions worth confirming on a sample.
Whichever route you choose, ask for one physical sample of the surface with its edge profile, and one cut-out detail drawing. Those two items settle most arguments before they cost money.
Fit the Unit to the Project Type
The same manufacturer can supply a family villa and a block of serviced apartments, but the specification should not be identical.
Private villas and renovations
Here width is usually available, so the design question is how much storage sits behind the doors. A Double Vanity with deep drawers at one end and a blank panel over the plumbing at the other keeps the front clean without wasting space around pipework.
Apartments, hotels and rental stock
Repetition matters more than novelty. A Floating Vanity leaves the floor visible and easy to mop, which housekeeping teams value, and it hides the wall fixings behind the carcass. For rooms where two basins compete with a shower and a WC, an Integrated Countertop Vanity keeps the number of separate components down.
Guest bathrooms with tight widths
If the clear run is short, compare a Single Vanity against a narrow double before forcing two basins into the space. Two shallow bowls with no shelf room between them are a daily frustration; one comfortable basin with drawer storage usually serves better.
Custom Sizing, and Where It Stops Being Useful
Made-to-measure is the main reason to buy from a manufacturer with its own production rather than a catalogue reseller. Santerson's bathroom ranges are specified project by project, with finish, layout and dimensions set against each space, and the Custom & OEM service covers bespoke sizes, materials, finishes and hardware.
Custom sizing earns its cost in three situations: an awkward wall run where a standard unit leaves a dusty gap; a project matching tops to other stone work such as kitchen or reception surfaces; and multi-unit work where one drawing should repeat across many rooms. It adds little in a straightforward bathroom that already fits a standard width.
Documentation That Protects Repeat Orders
Ask for a shop drawing per configuration, signed off before production: overall dimensions, basin centres, cut-out positions, tap holes, waste and trap drops, drawer layout, and the material reference for both the top and the carcass. Keep one approved reference unit and its drawing set as the benchmark for later batches.
Logistics, Installation and After-Sales
A double basin top is heavy, brittle in transit, and useless until it is plumbed in. Santerson describes global freight forwarding by sea, air and rail with customs paperwork, container loading, shipment tracking and door-to-door delivery, together with on-site installation, inspection and snag lists, warranty coverage, spare parts and ongoing maintenance as part of its service scope.
Treat those as service descriptions to verify for your own shipment rather than guaranteed levels. Agree the packing specification, the Incoterms, and who handles customs clearance, and confirm installer availability in your city before you commit to an installation date. For multi-unit jobs, ask how spares for runners, hinges and handles are held, because that is what keeps a snag list short two years later.
A Five-Step Comparison Routine
- Send the same drawing and the same six-item schedule to every supplier you quote.
- Compare basin type, cut-out detail and material reference before comparing price.
- Order one sample top with its edge profile and one approved reference unit.
- Sign off shop drawings covering centres, tap holes, waste drops and fixings.
- Write the packing, delivery and after-sales terms into the purchase order, not into email correspondence.
Compare on those points and a double basin countertop stops being a decorative line item. It becomes a documented component you can reorder, install and maintain without renegotiating the specification every time.
Talk to us about your bathroom specification. Send your floor plan, clear wall run and preferred basin type, and we will quote the layout, material and storage configuration around them, with drawings for approval before production. Enquiries reach our team through the SANTERSON website.