A made-to-measure wardrobe reaches the site in three pieces of glass, a set of lacquered panels and a hardware carton — and only one of them is easy to replace if something goes wrong on the day. For Glass & Lacquer Combination Wardrobes, the difference between a clean handover and a two-week snag list is usually decided months earlier, when delivery sequencing and installation access are written into the order. This guide walks through the decisions that matter, in the order they actually arrive.
Why this product type needs its own delivery plan
Glass & Lacquer Combination Wardrobes sit in our lacquer wardrobe range and combine two fronting materials — glass and lacquered panels — in one run of made-to-measure cabinetry. Each unit is built to the dimensions, layout and finish selected for that room, so a replacement panel is not an off-the-shelf swap; it re-enters production. That single fact drives everything below.
The glass elements also change how the goods travel. Glazed leaves are crated separately from lacquered carcass panels, and they arrive on different handling rules: one is fragile and needs upright storage, the other is heavy and marks easily if it leans. Site teams that treat the whole wardrobe order as one pallet tend to discover this at the worst possible moment.
Confirm the specification before anything is booked
Delivery planning starts with a frozen specification, because every later date depends on it. Before we schedule production, we ask project teams to confirm the following against the site drawings rather than against a sample room or a showroom photograph:
- Final room dimensions and floor levels — including finished floor height, skirting, and any built-in services behind the wardrobe line.
- The exact fronting combination per section: which doors are glass, which are lacquered, and whether the glass is clear, frosted or tinted.
- Layout and interior configuration — hanging zones, shelves, drawers — since these determine panel counts and crate sizes.
- Door operation and clearance: hinged, sliding or folded, plus the swing or slide path needed for each to work on site.
- Finish reference for the lacquered surfaces, confirmed from a physical sample rather than a screen proof.
Sequence production with the site programme
Wardrobes are a trade that runs behind the visible ones: plaster, paint, flooring and joinery all finish before a carcass can stand in place. We work backwards from your installation window rather than forwards from the purchase order.
| Milestone | What should be true on site | Where we are involved |
|---|---|---|
| Specification sign-off | Drawings, finish samples and layout approved by the client or designer | Technical review of dimensions, clearances and glass sizes; production drawings returned for confirmation |
| Production | No pending changes to openings or finishes | Panel fabrication, lacquering and glazing with quality checks before packing |
| Packing and loading | Access route confirmed, lift or stair dimensions known | Crate marking by room and section, container loading plan |
| Transit and clearance | Receiving capacity at the agreed arrival date | Freight booking, documentation, shipment tracking to your door |
| Storage on site | Dry, level, secure area with room to stand crates upright | Packing list and crate guide so the right sections open first |
| Installation and handover | Wet trades complete, floors protected, lighting available | On-site guidance, inspection of finished work, snags closed out |
Two dates in that table cause most of the friction. First, a specification change after production starts does not just delay one wardrobe — it re-cuts panels and re-orders glass to size, which resets the whole delivery slot. Second, an arrival date agreed without checking site storage turns a controlled handover into goods stacked in a corridor.
Plan transport and receiving for mixed fragile and heavy goods
Because one order carries both glazed leaves and lacquered panels, we split the packing list so your site team can read it without opening anything. Crates are marked with room, section and sequence number, and glazing is flagged separately from carcass components.
- Freight mode. Sea freight suits full wardrobe packages for villas and apartment lots; air moves a short set of replacement panels or hardware when a project is already on site. We arrange sea, air and rail forwarding with the customs paperwork that goes with each option.
- Receiving. Book a delivery slot when someone can check crate counts against the packing list the same day. Damage claims on glass are far easier to settle at the point of receipt than after unpacking.
- Storage. Keep glazed crates upright and dry, and keep lacquered panels flat and off the floor. Lacquer edges chip on concrete; glass should never be laid flat against a wall in a shared corridor.
- Vertical transport. Confirm lift car dimensions or stair landings before the goods arrive. A full-height wardrobe panel that will not turn a landing is a design problem, not a delivery problem — and it is cheaper to change on paper.
Prepare the room before the fitters arrive
Installation goes smoothly when the room is genuinely ready. Before our team or your fitters start, check that:
- Floors and walls are finished, dry and clean, with no wet trades scheduled behind the wardrobe line.
- Floor levels across the wardrobe run have been checked, since made-to-measure carcasses are cut to a specified height and scribe to a settled floor.
- Electrical points for internal lighting are positioned to the approved drawing, if integrated lighting is part of the layout.
- Doors and windows in the room are installed and lockable — glazed wardrobe fronts should not be fitted into a room still open to weather.
- Protection is laid on the finished floor along the carry-in route.
Where a project combines wardrobe joinery with other built-in work, it is worth reviewing neighbouring products in the same range so the finishes line up. Projects matching lacquer fronts with glazed doors often compare Matte Lacquer Wardrobes and Glass Sliding Door Wardrobes at the same time, which lets one order cover several bedrooms and keeps the sliding gear, handles and lacquer batches consistent.
Installation sequence that protects glazed fronts
A practical order of work for a combination wardrobe:
- 1. Dry-lay components against the crate guide and confirm every section matches its marked position before anything is fixed.
- 2. Fix carcasses, level them along the run, and check vertical alignment across the whole line — not one unit at a time.
- 3. Fit interior configuration, then hang hinged doors or set sliding tracks, adjusting each to its neighbour.
- 4. Fit glazed leaves last, with protective film left on until the room is otherwise complete.
- 5. Remove film, clean lacquered fronts with a soft dry cloth only, and walk the line with the client against the approved drawing.
The final walkthrough is where most snags surface: a door that rubs after the building moves, a handle position that clashes with a wall light, a shade difference between two lacquered panels from different batches. Recording them on the day, with photographs and section numbers, means replacements are ordered against the right specification instead of a description written weeks later.
What to agree in writing before you order
- Which party receives, stores and moves the goods on site, and for how long.
- The inspection point for damage — at delivery, or within a stated number of days after unpacking.
- Who fits the wardrobes: our on-site team working to the drawings, or your local crew with guidance from us.
- How snags and replacement parts are handled, and what information is needed to raise them (section number, photograph, finish reference).
- The scope of warranty cover and after-sales support for this order, confirmed in writing rather than assumed.
Send us the room drawings, the fronting combination you want and your target installation window, and we will return production drawings, a crate-by-crate packing plan and a delivery sequence that fits your site programme. As a China-based manufacturer of furniture and building materials, we handle made-to-measure wardrobe production alongside freight, door-to-door delivery and installation support for villa, hotel and office projects.
Contact PHILLIP — Phone/WhatsApp +86-13928214007 — Email santerson@qq.com