A parquet floor changes how a villa or hotel interior reads — the pattern sets the rhythm of the room long before the furniture arrives. That is also why it is easy to buy badly. Samples look convincing under a showroom lamp, and the details that decide performance two years later sit inside a board you cannot see. The checklist below follows the order we use when specifying engineered wood flooring for villa, residential and hospitality projects: construction first, then pattern and tone, then site conditions, and finally the delivery terms that decide whether the floor can be laid on schedule.

1. Construction: top layer, core and how the two are bonded

Ask for the make-up of the board in writing, not just a product name. Two things matter most:

  • Solid oak wear layer. The European oak parquet and engineered boards in our flooring range use a 3mm solid oak top layer. That thickness is what lets the grain read as real timber rather than a printed surface, and it is thick enough to take one or two refinements over the life of the floor — something a thin foil-like layer cannot.
  • Multi-layer core. The cross-stacked layers underneath are what hold the board flat. Our product descriptions put it as a multilayer structure that reduces deformation and helps avoid warping. A stable core matters far more in a project than in a photo, because boards that move after installation produce gaps, cupping and open joints that no cleaning product can fix.

Request the construction drawing or cross-section photograph for the exact item you are buying. Catalogue titles across a supplier's range are often close but not identical, and a name that sounds the same can cover a different format — parquet block, herringbone or straight plank. Confirm what you are approving against the actual board, not against a product title or a brochure line.

2. Pattern and layout: herringbone, parquet block or straight plank

The pattern is a planning decision, not a decorative afterthought, because it changes the quantity you order, the wastage allowance and where the room appears to start and end.

On the checklist: which pattern, which laying direction, where the perimeter border sits, and how much extra you are allowing for cuts. Confirm these before production, because a herringbone field laid in the wrong direction cannot be corrected on site without re-ordering.

3. Colour and finish: tone range and surface treatment

Oak is a light timber, so the colour in the board comes from treatment as much as from the log itself. The European oak flooring we list spans several distinct tones:

Checklist items here: how many boards were used in the sample you approved, whether the surface is brushed or smooth, whether knots and mineral marks are present or selected out, and which sheen level. Grain character varies between boards of the same item; approve a sample that shows several boards side by side, not a single plank.

4. Board size and layout plan

Parquet is ordered by square metre but laid as individual lamellae within each board element, so dimensions belong on the checklist before production starts:

  • Board width and length for the format you have chosen, and the lamella size within each parquet element.
  • Total square metres per room, taken off the drawings rather than estimated from a plan view.
  • A laying layout showing where the pattern starts, how the field meets door thresholds, and where cut boards fall on the far wall.
  • Border or skirting detail — whether the floor runs to the wall with a concealed expansion gap or is trimmed with a beading you are ordering separately.

We do not publish fixed board dimensions for every flooring item on the site, so request them in writing against the specific product code you intend to order. Getting a written dimension sheet back before you confirm an order is a reasonable supplier test in itself: it tells you whether the person quoting has actually looked at the specification.

5. Heating, subfloor and installation method

Underfloor heating is where engineered construction earns its place. Several of our European oak parquet and herringbone items are listed as compatible with underfloor heating in their product descriptions — including the light parquet at 1850, the warm parquet at 1848 and the dark herringbone at 1851. Treat that as an item-by-item confirmation to request, not a blanket statement across the range.

On the checklist:

  • Which specific items are stated as compatible with underfloor heating for your project.
  • The subfloor type and its measured moisture level before any board is opened.
  • Fixing method — glue-down or floating — and the adhesive or underlay you will use.
  • Expansion provision at thresholds, perimeters and fixed columns.
  • Acclimatisation time on site, and who is responsible for it.
Any figure quoted in a product description — top-layer thickness, surface treatment, heating compatibility — should be re-confirmed against the current specification sheet for your order. We treat our own published descriptions as reference points to verify, not as the final word on a specific batch.

6. Quantities, batching and delivery terms

The last part of the checklist is commercial, and it is where flooring projects most often lose time.

  • One dye lot. Order the full requirement plus a cutting allowance in a single production batch. Oak takes stain differently board to board, and a second batch ordered months later can sit visibly against the first.
  • Spare boards held on site. Keep a few boards from the same batch for future repairs or a replacement plank after handover.
  • Packaging and pallet loading. Parquet ends are where damage shows; confirm how boards are packed and braced in the container.
  • Delivery point and Incoterms. Our logistics scope covers freight forwarding by sea, air and rail, customs paperwork, packaging and container loading, shipment tracking and door-to-door delivery. Which terms apply to your site is agreed case by case.
  • Inspection window. Agree in advance how short boards, damaged ends and tone outliers are recorded and handled on arrival, before the floor is opened.

Because we supply flooring alongside cabinetry, wall panelling, doors, lighting and other fit-out items under one turnkey project scope, the floor can be scheduled against the same production and shipment plan as the joinery it has to meet. For a project buying flooring plus several other interior categories, that single coordinated schedule usually carries more weight than a small price gap between two flooring-only suppliers.

Send us your specification, not just a picture

If you have drawings, room dimensions or an underfloor heating detail, we can confirm which of our European oak parquet and herringbone items suit the application, what construction and finish to specify, and how the flooring fits into the wider delivery plan. Talk to us through the contact page and we will quote against your actual requirement.