Open shelving is one of the few built-in items that gets quoted from a drawing and then installed against a real wall, a real floor and a real set of trades. The gap between those two is where change orders come from. This guide sets out the measurements and project inputs we need to turn Santerson Metal Frame Shelves into a makeable, installable specification rather than an estimate.

What the product actually is

Metal frame shelving sits in our Open Shelving collection. It is built for residential bathroom projects and other interior wall applications where a slim metal frame carries shelf planes in an open layout. The listing is explicitly configurable: finish, layout and dimensions are set per project rather than chosen from fixed sizes. That means the drawing you send us is the specification, and the quality of that drawing decides how accurate your quotation will be.

The same configurability runs through the wider shelving range. Santerson Floating Modular Shelves and Santerson Metal Frame Modular Systems are made to measure for wall system projects, and Santerson Floor to Ceiling Systems covers full-height runs. If you are furnishing a whole apartment or villa floor, these items are usually quoted together with vanities, wardrobes and cabinetry so that finishes and metals match across rooms.

Measurements: what to record on site

Send dimensions in millimetres, taken from the finished surfaces rather than the structural shell, and state clearly which is which. A shelf run that measures cleanly on a screed can be several millimetres out once tiling and waterproofing are complete.

MeasurementWhy it matters
Total run length, left to right, at the fixing lineSets the overall frame width. Record the same length again at the top of the run if the wall is not square.
Height from finished floor level, and clear height under any ceiling, bulkhead or pelmetDetermines whether the unit is a low bath-side shelf, a full-height panel or something in between.
Depth from finished wall face to the front edge of the shelfGoverns projection into the room and clearance at vanity edges, mirror cabinets and doors.
Distance to the nearest obstruction at both ends and at mid-runCorners, door reveals, towel rails, shower screens and tapware all cut into a run at different heights.
Vertical position of outlets, switches, mirror cabinets and shower headsA shelf plane that crosses an outlet or a mirror edge has to be re-set before production, not on site.
Substrate type and thickness behind the finishBathroom walls are commonly tile over waterproofed board. Fixing method and fixings themselves depend on what is behind the tile.
Level and plumb check across the runTells us whether to design for a level frame with scribed ends, or to follow the wall.

Where a shelf shares a wall with a Santerson Floating Vanity or a mirror cabinet, send the setting-out drawing for those items as well. We then coordinate heights so that shelf undersides, vanity tops and mirror tops sit on lines that read as one joinery package instead of three separate purchases.

Project inputs: what to tell us beyond dimensions

1. Where it is going and how it will be used

Tell us the room, the country and the project type — a private bathroom, a guest bathroom repeated across villa units, or a common-area washroom in a boutique hotel. Usage decides shelf spacing and load expectation: folded linen and towels behave differently from glass bottles of product, and display pieces behave differently again. We confirm material, finish and intended loading for each project rather than assuming a default.

2. Finish and metal tone

Send the finish reference you are working to: a physical sample, a supplier code, or a photograph of an existing element the shelving has to match — tapware, a wardrobe frame, cabinet handles or a light fitting. Where a project already uses aluminium-framed glass wardrobes or slim-frame doors, matching the metal tone across those items is what makes an open shelf look designed rather than added on.

3. Shelf plane material

Metal frame shelving can be paired with different shelf materials depending on the scheme. Glass shelves are a common choice in bathrooms, and where glass is specified we confirm the glass specification, load limits and installation requirements for that configuration before anything is cut.

4. Lighting and accessories

If you want shelf-level or vertical lighting, say so at quotation stage. Integrated lighting in shelving systems carries electrical specifications that have to be agreed with the electrical contractor before first fix, not after tiling. Matching shelving accessories, vanity lighting and other bathroom accessories from the same package keeps profiles, colour temperature and mounting details consistent.

5. Quantities and repetition

For multi-unit work, list how many of each configuration you need and where each one is installed. Repeating a shelf detail across apartments or guest rooms is where made-to-measure production pays for itself: one approved drawing per type, produced repeatedly, with the same fixings and the same finish.

6. Installation responsibility and programme

Tell us who installs — your joiner, your bathroom contractor or our team — and which trade sequence the shelving sits in. Open shelving is a finishing item: it goes in after tiling, paint, mirror cabinets and tapware. A realistic installation date on your programme lets us set production so the shelves arrive when the wall is ready for them.

A simple pre-enquiry checklist

  • Room-by-room dimension sheet in millimetres, with finished-surface references stated
  • Setting-out drawing showing outlet positions, mirror cabinet edges and fixed obstructions
  • Finish reference for the metal frame and a decision on shelf plane material
  • Quantities per configuration, with unit or room numbers for multi-unit projects
  • Confirmation of whether integrated lighting is required, and who supplies the electrical work
  • Delivery address, Incoterms preference and required site-ready date
  • Photographs of the wall in its current state, straight on and from both ends

What we confirm before production. Dimensions, material, finish, load expectation, glass specification where applicable, electrical details for lit units and the fixing method for the substrate on site. Anything unverified at drawing stage becomes a site problem, so we treat those items as mandatory sign-off points rather than optional extras.

How this fits a wider furnishing package

Shelving is rarely ordered alone. As a China-based furniture and building materials manufacturer working on villa, hospitality and office projects, we typically quote open shelving inside the same package as vanities and ceramics, shower systems, wardrobes and cabinetry, lighting, flooring and wall finishes. Coordinating those items against one set of drawings avoids the finish mismatches that appear when each line item is bought separately from a different supplier.

Our service path runs from design consultation and space planning through material selection and product specification, manufacturing and quality control, project management and site coordination, then delivery and handover. Freight arrangements cover sea, air and rail with the associated documentation and door-to-door delivery; installation support covers on-site fitting, inspection and snags. Terms, transit time, duties and warranty scope are agreed case by case for each destination, and we set them out in writing per project rather than quoting general promises.

Send us your drawings

Dimension sheets, setting-out drawings and finish references for metal frame shelving or a wider fit-out package are all welcome. Include the room list and your required site-ready date, and we will come back with a specification-led quotation.

Contact: PHILLIP  |  Phone / WhatsApp: +86-13928214007  |  Email: santerson@qq.com

Manufacturing and office: Longjiang, Shunde, Foshan, Guangdong, China. Enquiries receive a response within 24 hours.