An island unit is the one wardrobe component that arrives as a freestanding piece rather than as wall-mounted carcasses and panels. It carries drawer banks, a hard top surface, sometimes glass or mirrored tray fronts, and hardware pre-fitted inside. That combination — heavy, flat-panelled, with working parts already installed — is exactly what ocean freight tests hardest. Before production starts on Island Walk in Wardrobes, the packaging specification should be agreed in writing, not left to the factory's default habit.

The list below is what a buyer or project manager should confirm, and why each item changes what you find on site when the container doors open.

1. How the island unit is broken down into packages

A made-to-measure island can ship as one assembled box or as a knock-down set of carcass, drawer banks, worktop and plinth. Knock-down packing lowers the risk of a drawer bank shifting inside its case and cracking a joint, and it lets damaged components be replaced individually instead of scrapping the whole unit. Assembled packing saves site time but demands far stronger internal bracing.

Ask for the packing list before shipment — number of packages, dimensions and gross weight of each — and check that the island top travels separately from the carcass. A worktop strapped flat against a loaded carcass is the most common source of edge chips.

2. Corner and edge protection, not just a cardboard sleeve

Flat-pack furniture fails at the corners first. Confirm that each package carries rigid corner protectors, that panels are separated by foam or corrugated sleeves rather than stacked face-to-face, and that wrapped glass, mirrored or high-gloss door fronts travel in their own framed crate. High-gloss and lacquered wardrobe fronts mark permanently where two surfaces rub, so a slip in the liner shows up as a defect you cannot polish out.

3. Moisture protection for the crossing

A container moving between climates sweats on its walls and ceiling. Ask what goes inside the carton — desiccant bags, a vapour barrier liner, a shrink-wrap over the pallet — and whether particleboard or MDF components are sealed on all edges before packing. Untreated cut edges absorb that moisture first and swell, which you only see when the drawer runners no longer sit square.

For timber, veneer and finish-critical pieces, a humidity indicator strip in the carton is worth requesting: it gives you evidence at handover if a package arrived wet.

4. Hardware: pre-fitted, bagged, or in a separate box

Runners, hinges, soft-close mechanisms and handles should be listed explicitly on the packing list. Confirm whether they are fixed in place with protective padding, bagged inside a labelled carton, or shipped in a separate marked box tied to that unit. Loose hardware rattling inside a sealed case dents panels from the inside. Also confirm that spare fixings and adjustment components travel with the order — replacing one runner locally, mid-installation, is what turns a two-day fit-out into a week.

5. Labelling that matches your room schedule

Wardrobe packages look identical once wrapped. Each carton should carry the project reference, the room or unit number from your schedule, the package number of the total set (3 of 7), and a "this face up" mark. If the island travels as a knock-down set, its cases must share one unit code so nobody unpacks them against a different bedroom. Print labels on two faces — top labels get scraped off in transit.

6. Container loading plan and bracing

Ask how the wardrobe packages will sit in the container: on pallets or floor-stacked, blocked and braced with airbags, and kept clear of the container doors. Weight distribution matters when a villa order also carries flooring, tiles or stone panels — heavy board loads pressed against a wrapped wardrobe case crush it slowly over three weeks at sea. Request photographs of the loaded and braced container before the doors are sealed.

7. What happens if a package arrives damaged

Settle this before production, not after. Confirm which documents your freight documents must include so a claim is possible — packing list, bill of lading, cargo insurance if you have taken it — and confirm the replacement route: which component can be re-made and re-shipped, by which mode, and who covers the freight when the damage arose in packing. Because these wardrobes are made to measure, a replacement is a new production run, so the agreed lead time matters as much as the price.

Confirm before you order: a short checklist

Item to confirmWhat you should receive in writing
Packing breakdownAssembled or knock-down; package count, size and weight per unit
Panel protectionCorner protectors, inter-panel sleeves, separate crate for glass or gloss fronts
Moisture controlVapour liner, desiccant, sealed cut edges, optional indicator strip
HardwareFixing method, labelled cartons, spares included
LabellingProject code, room/unit number, package 3 of 7, orientation mark
LoadingPallet or floor-stack plan, bracing, pre-sealing photos
Damage routeDocuments for a claim, replacement lead time, who pays freight

SANTERSON manufactures these wardrobes to project-specific dimensions and finishes and states packaging and container loading as part of its logistics and door-to-door delivery service. Send your room schedule with the enquiry and ask for the packing list, labelling convention and loading plan to be written into the order confirmation — that single document is what you hold at handover.

Related wardrobe layouts on the same project

Island units rarely stand alone. If your schedule also carries perimeter runs, confirm the packaging of those runs separately — tall carcasses and full-height panels need vertical bracing in the container, whereas an island travels flat. Walk-in layouts specified as U Shaped Walk in Wardrobes or L Shaped Walk in Wardrobes bring corner carcasses whose mitred ends need their own edge protection; note that requirement in the same packing specification rather than assuming one standard applies to every case.

Should I ask for the island unit assembled or flat-packed?

Flat-packed if the site crew is experienced and the island has drawer banks already joined; assembled only if the unit is simple and your installation window is tight. Ask which option the quoted freight price assumes — assembled units cost more to ship and insure.

Who inspects the packages on arrival?

Agree this in advance. Photograph every carton, opened and unopened, before your installers start, and record package numbers against the packing list. Without that record, a claim against the carrier or the packing fault is difficult to attribute afterwards.

Packing specifications, protective materials, freight mode, insurance and replacement lead times are confirmed per project and per destination; figures quoted on product pages are not a guaranteed service level.