A grey shaker cabinet order rarely goes wrong at the drawing stage. It goes wrong at the handover between design intent and shop reality: the grey that was approved on a mood board, the panel profile that looked obvious in a 3D render, the appliance recess that was dimensioned to a nominal size rather than an actual model. A product submittal is the document that closes those gaps before panels are cut. If you are specifying cabinetry for a villa, apartment or boutique hotel fit-out, the submittal is also where you protect your schedule, because every unresolved item becomes a variation order later.
1. Scope Definition and Project Reference
Start with the boring part that most submittals skip. State the project name, unit or room list, and the scope boundary in plain words. Cabinetry packages routinely overlap with other trades: a tall pantry run may sit inside the joinery package while the cornice above it belongs to the ceiling contractor; an island carcass may be supplied by the cabinet maker while the stone top is measured by the benchtop supplier.
Write down which rooms are included, and equally which are not. A grey shaker cabinets package for an open-plan kitchen usually extends into a butler pantry, a laundry wall, a media unit and bedroom wardrobes. If your submittal covers only the kitchen, say so on the first page.
- Project name, unit numbers, floor levels and drawing revision referenced
- Rooms in scope, with a simple room-by-room schedule
- Explicit exclusions: benchtops, splashbacks, appliances, sinks, tapware, structural walls, cornice, skirting removal
- Interface items where your package meets another trade's work
2. Shop Drawings at a Readable Scale
Plans alone are not enough for shaker cabinetry, because the defining feature — a framed door with a recessed centre panel — is a section and elevation detail, not a plan detail. Provide elevations of every wall run, with overall heights, toe-kick height, carcass heights, and vertical stack dimensions from floor to ceiling.
- Elevations for each run, dimensioned overall and between key elements
- Sections through base units, wall units and tall units, showing carcass depth and door thickness
- Detail callouts for the shaker door profile, corner construction and any scribe or filler at uneven walls and ceilings
- Appliance elevation with cut-out openings marked to the selected models
- Ceiling and floor levels noted where the room is out of level — this decides whether scribes are needed
Where the design carries glass-front uppers, open niches or integrated lighting, show those as separate details rather than assuming they read correctly from a perspective render. A light grey shaker style kitchen cabinet scheme with glass display cabinets and warm LED niches needs the light position, driver location and access point drawn, not just implied.
3. Door Profile and Panel Construction
"Shaker" is a family, not a specification. Two cabinets both described as shaker can differ in frame width, rail-and-stile proportion, centre-panel material and whether the panel is captured or fixed. Put the actual profile in the submittal: a template drawing at 1:1 where possible, with rail and stile widths, panel thickness, edge break and the radius on any machined edge.
- Rail and stile widths for doors and drawer fronts, top to bottom
- Centre-panel material and whether it floats or is fixed
- Rebate depth and the visible shadow line around the panel
- Door direction, reveal between doors, and whether handles sit on the frame or across the panel
- Matching details for drawer fronts so the horizontal lines align across runs
If the same profile appears elsewhere in the building — a shaker panel wardrobe, a pantry door or a wall lining — include that matching detail too, so one approval covers the whole family instead of being re-litigated per room.
4. Substrate, Surface and Colour Approval
Grey is the highest-risk colour in cabinetry, because it shifts with sheen level, light temperature and panel orientation. A submittal that only names a colour code has not actually specified anything. It should name the substrate, the surface system, the sheen band and the physical sample being approved.
| Item to state | Why it matters |
|---|---|
| Door and carcass substrate | Determines machining behaviour, edge treatment and suitability for humid rooms; a shaker door with a machined frame behaves differently from a flat-panel door with a wrapped edge. |
| Surface system | Painted, lacquered, foil-wrapped or laminated surfaces look similar in a render but differ in repairability, edge appearance and cost. The same grey reads warmer on a matte surface and cooler under gloss. |
| Sheen level | Matte, satin and gloss change how a grey reads under the same lamp. Fix this in writing with the sample. |
| Colour reference | Quote the colour system used and attach a physical sample reference; note that on-screen colour is indicative only. |
| Sample panel size and orientation | A 50 mm chip tells you nothing about grain direction or how a large door reads. Request a full-door-size sample in the actual finish. |
| Carcass interior colour | Open shelving and glass uppers expose the interior. Confirm whether interiors match the doors or use a standard white. |
Grey on matte versus gloss
Where a project mixes sheen levels — a painted shaker run in the butler pantry beside a matte-finish laundry wall and gloss-fronted display uppers — ask that every grey be sampled on one board so the tones can be compared side by side under site lighting.
5. Hardware Schedule
Hardware is where submittals get thin and sites get slow. List every item with a make, model or clear equivalent, and state who supplies it. Hinges, drawer slides, lift systems, handles, legs, brackets and internal fittings all have lead times, and a substituted hinge can change the door gap you already approved.
- Hinges: type, opening angle, soft-close or not, and cup drilling for the chosen panel thickness
- Drawer slides and boxes: extension, load rating, soft close, and finish of the visible box side
- Overhead lift systems for wall units, including clearance needed to open
- Pulls and knobs: finish, fixing centres, and whether they are supplied or site-provided
- Built-in appliance brackets, support legs and connecting hardware
- Internal fittings: pantry shelving, trays, bins, cutlery organisation, and their positions on the drawings
- Integrated lighting: fitting type, driver location, switching point and spare access
Where matching hardware is available from the supplier, ask for it to be listed in the same schedule rather than sourced separately. Splitting cabinet and hardware supply across two vendors is a common cause of finger-pointing when a hinge fails or a handle finish does not match.
6. Appliances, Services and Interface Dimensions
Anything with a cable, a hose or a flue needs its actual product data in the submittal — not a category description. Nominal appliance widths are not reliable; recess dimensions should be drawn from the selected model's installation sheet.
- Appliance schedule: brand, model, dimensions, door swing, ventilation requirement
- Cut-out openings for ovens, cooktops, rangehoods, dishwashers, fridges and specialty units such as wine storage
- Electrical points: position, height, and access to drivers and outlets behind cabinets
- Plumbing for sinks, water treatment and ice makers, including waste routing
- Ventilation and clearance requirements stated by the appliance manufacturer
- Benchtop and splashback template responsibility and timing
Note in writing that cabinet dimensions depend on confirmed appliance models. If an appliance is substituted after approval, the affected carcass should be re-issued rather than adjusted on site.
7. Site Conditions and Tolerances
Cabinets are manufactured to a fraction of a millimetre; buildings rarely are. The submittal should record who verified the site dimensions, when, and how out-of-level walls, ceilings and floors will be handled.
- Date of site measurement and by whom
- Finished floor levels and where tiling or screed is included in that level
- Scribes, fillers and packings at walls and ceilings, with expected sizes
- Protection requirements for completed work on upper floors or adjacent rooms
- Access route and lift dimensions — a one-piece tall unit that will not fit the stairwell becomes a split unit late in production
8. Packaging, Delivery and Installation Sequence
For cross-border supply this section carries real schedule risk. State the packing method, container or shipment plan, delivery point, and the installation sequence with responsibilities on each side.
- Pack marking that matches the room schedule on the drawings
- Shipment mode, consolidation plan and expected arrival window
- Who handles import clearance, duties and last-mile delivery to site
- Storage conditions on site before installation — cabinetry should not sit in an unconditioned space while trades finish wet work
- Installation crew, sequence, and the point at which benchtop templating occurs
- Snag inspection and sign-off process at handover
A supplier running the package as one scope — design coordination, production, freight and installation support — should show that chain in the submittal so the buyer sees who owns each stage. Our own project workflow follows six stages: consultation, design and planning, production, logistics, installation and after-sales.
9. Quality Control, Warranty and After-Sales Terms
Ask for the inspection record and the warranty wording in the same document as the specification. Vague promises of "premium quality" carry no weight; what matters is what gets checked before shipping and what gets fixed afterwards.
- Pre-shipment inspection points: panel flatness, colour consistency across a batch, edge integrity, door alignment
- Pack inspection photos or video released before despatch
- Warranty period, what it covers and what it excludes — state the exclusions plainly
- Spare parts availability for hinges, slides, handles and replacement doors in matching finish
- The route to report a snag after handover and who responds
10. Approval Block and Change Control
Close the submittal with an approval block that names the reviewer, the revision number and the date, plus a short statement of what is frozen at approval. This is the paragraph that saves you money.
- Document number, revision and issue date on every page
- Named approver for design, for the client and for the supplier
- A clear list of items still pending at the time of issue
- A change-control note: changes to dimensions, finishes or appliances after approval require a re-issued drawing set and may affect price and lead time
Keep the pending list short and honest. A submittal issued with three open items and clear dates is more useful than one presented as complete that quietly assumes an appliance, a floor level and a handle finish nobody confirmed.
Frequently Asked Questions
How many grey samples should I approve before signing off?
At least one full-door-size sample in the exact finish and sheen, viewed under the actual site lighting at both day and night. If the package mixes matte and gloss greys, request them on a single board for comparison.
Should wall units and base units share one approval?
Yes, if they use the same door profile and finish — but keep separate dimensioned elevations for each run. One colour approval covering the whole apartment prevents a later mismatch between kitchen, laundry and wardrobe greys.
What is the single most common cause of rework on shaker cabinetry?
Unconfirmed interface dimensions: appliance recesses drawn to nominal sizes, finished floor levels that did not include tiling, and ceiling levels assumed rather than measured. All three are resolved by a dimensioned drawing set with named responsibility for each level.
Can a custom built-in package be specified the same way as freestanding furniture?
No. Built-in work is fixed to the building, so it needs drawings, tolerances and interface details that freestanding pieces do not. Where a project combines both — cabinetry plus loose furniture for the same villa or hotel floor — keep them on separate submittals with one shared finishes schedule.
Getting a Submittal Set Prepared
SANTERSON manufactures custom kitchen cabinetry and interior fixtures for villa, apartment and hospitality projects, with made-to-measure sizing, material and finish options, and layouts drawn to each project. Submittals are prepared from your drawings and site dimensions, then coordinated through production, logistics and installation support. Send us your room schedule, appliance list and preferred grey reference, and we will return a dimensioned submittal set with the finishes and hardware schedules described above for your review.