A swim spa that looks right in a rendering can still stall a project once it reaches the site. Footprint, power, water treatment, delivery route and who maintains the shell all have to be settled before the purchase order is raised. This guide walks through what to put in a procurement brief for Outdoor Swim Spa WS-PC03, a square shell from our configurable outdoor swim and hydrotherapy range, so that the quotation you receive is comparable with the one your consultant or main contractor expected.

What WS-PC03 Is Designed For

WS-PC03 is a compact, square-format swim spa intended for villa gardens, resort terraces, wellness decks and private clubhouse areas where a full-length pool cannot be justified but year-round lap swimming and hydrotherapy still need to sit in the same shell. The 3000 × 3000 mm plan fits into courtyard plots, roof-terrace setbacks and pool-deck corners that longer rectangular units cannot occupy, which is usually the reason buyers shortlist it rather than a length-based model.

It belongs to a wider configurable range. Where a project needs a longer swimming lane, more jet stations or a different water depth, we quote alternative models from the same Swimming Pools and Swim Spas category instead of forcing an unsuitable shell into the drawing. Stating the intended use — daily training, guest wellness, physiotherapy or a spa-and-lounge combination — at the start of the brief lets us confirm whether WS-PC03 is the right base model or whether a sibling model fits better.

Catalog Specifications to Copy into the Brief

The figures below are the catalog values published on the WS-PC03 product page. List them in your brief exactly as reference points, and ask us to confirm every one of them against the configuration you select, because options change what is delivered.

ItemCatalog valueWhat to confirm for your project
ModelWS-PC03Exact model code on the quotation and on the shipping marks
Catalog dimensions3000 × 3000 × 1000 mmFinished shell size versus the prepared slab, plinth and access width
Control system1 setLocation of the control panel and who operates it after handover
Water pump1 pcPump duty against your intended swim or jet usage pattern
Filter pump1 pcFiltration run hours and access for cartridge or media changes
Jet total50 pcs; 4 water columnsJet layout versus seating and swimming positions in the shell
LED lights1 pcColour temperature, control method and circuit separation
Total power2.75 kWSupply capacity, breaker size and cable route at the site
Features shownWater jets, LED lighting, OzoneWhether ozone is the final disinfection method or UV is added

Two entries deserve special attention. The catalog does not list a swim training system for this model, so if your brief assumes counter-current swimming, raise that explicitly and let us confirm what is supplied rather than reading it into the specification sheet. And the 2.75 kW total power figure is a catalog value for the standard configuration — it is the number your electrical engineer should verify against the selected options before sizing the circuit, not a figure to copy onto an electrical drawing without confirmation.

Options and Accessories: State Them as Line Items

The catalog lists optional accessories for this range — control systems, UV sterilization, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so a brief that says "as per catalogue" invites non-comparable quotations. Write each option as its own numbered line with a quantity, and ask for it to be priced either included or clearly excluded.

  • Heat pump — decide whether the spa is used in cool months; this drives the insulation specification and the electrical load more than any other option.
  • Insulation — specify the climate exposure of the installation position, since an exposed terrace and a sheltered courtyard need different envelopes.
  • Sand filtration versus cartridge filtration — this changes plant-room space, backwash drainage and the maintenance routine handed to facilities staff.
  • UV sterilization alongside ozone — confirm whether both are required for your water-quality standard, and who signs off the dosing regime.
  • Steps and access — internal or external steps change the footprint on site; state which one the landscape drawing assumes.
Record the confirmed configuration in one table on the last page of your brief: model code, dimensions, pumps, jet count, lighting, disinfection method, insulation and options. Every quotation you receive should then be checked against that single table instead of against marketing images.

Site Conditions to Settle Before Ordering

Most swim spa delays on villa and hospitality projects come from site conditions that were never written down. Include these in the brief as questions you expect answers to:

  • Structural support. Confirm slab thickness, bearing capacity and drainage around the shell with your structural engineer before production starts.
  • Electrical supply. Give the available supply, distance from the distribution board and required isolation; the catalog power figure is the starting point for that calculation.
  • Water fill and drain. Identify the fill connection, overflow route and any consent needed for draining to stormwater.
  • Access for delivery. Note gate widths, crane or forklift access, and whether the shell travels fully assembled or in sections on your site.
  • Operating responsibility. Name the party who will run filtration hours, water testing and winterisation after handover.

How Our Project Process Supports the Brief

SANTERSON has been manufacturing furniture and building materials in China since 2008 and supplies project customers in hospitality, villas and offices worldwide. For a swim spa line item, our process follows the same six stages we use across a whole fit-out: consultation, design and planning, production, logistics, installation and after-sales.

Under Custom & OEM Service, we can confirm finishes, dimensions and equipment options against your drawings before the order is placed. Under Logistics & Door-to-Door Delivery, freight is arranged by sea, air or rail with the accompanying commercial paperwork, so the spa arrives with the rest of your consignment rather than as a separate import you have to manage alone. Under Installation & After-sales Support, we cover on-site installation guidance, inspection snags, spare parts and maintenance enquiries. Ask us for the current terms that apply to your country and project before you write any warranty period, response time or delivery date into a client-facing document.

A Short Checklist for the Enquiry

Send the following with your enquiry and you should receive a quotation that needs no further clarification round:

  • Model code WS-PC03, or ask us to recommend a model from the range if your use case differs
  • Site photographs, plan extract and the position of the spa relative to boundaries
  • Confirmed option list with quantities: heat pump, insulation, filtration type, UV, steps, control placement
  • Electrical supply details and water fill/drain arrangement
  • Delivery address, access constraints and preferred Incoterms
  • Project programme: required site arrival date and handover sequence

Send your brief and drawings to SANTERSON and we will confirm the configuration, dimensions and equipment list for WS-PC03 — or recommend a closer fit from the swim spa range — before you commit to a purchase order. Contact details are on our Contact page.