A full-height storage wall is one of the few built-in elements in a villa or apartment that touches almost every other decision: ceiling height, skirting and cornice lines, door openings, lighting circuits, joinery finishes and even how the flooring is laid. Because it is made to order, the conversation you have with the manufacturer before production starts decides whether the wall lands cleanly on site or turns into a string of site variations. Below is the practical agenda we suggest buyers, designers and builders take to that conversation when specifying Santerson Full Height Storage Walls.

Start With the Wall Itself, Not the Cabinet Interior

Storage walls in this collection are made-to-measure: overall width and height, the split between sections, the depth of carcass and the door or panel layout are all set per project rather than chosen from fixed modules. That flexibility is the whole point, but it also means the first brief needs to be dimensional and honest about the room.

Before drawings begin, have on hand:

  • The finished floor level and finished ceiling level for the wall run, including any bulkheads, beams or services running above the ceiling line.
  • Setting-out dimensions from a fixed reference point, plus the location of power outlets, switches, data points and air-conditioning returns that the wall will cross or conceal.
  • The floor and wall finishes you have already chosen, so the joinery edge detail can be agreed rather than improvised on site.
  • A note on which side of the wall is a room boundary and which side abuts a corridor, doorway or window reveal.

If your drawings are still at concept stage, our design team can work from space planning and 3D renderings through Interior Design Services, so the wall is resolved in the model before it is quoted.

Decide the Storage Mix Room by Room

The same wall footprint can behave very differently depending on what sits behind each face. These configurations from the collection are worth putting in front of the client early, because they change hardware, tolerances and cost at once.

Open display against closed storage

Santerson Mixed Open & Closed Storage combines open shelving with enclosed compartments in one run. The decision to nail down here is proportion: how much of the wall should be visible, and at what height. Open bays at eye level show what you place on them, so they need a plan for styling as well as for storage; closed compartments below and above carry the everyday clutter. Also confirm shelf spans and whether heavier items will sit there, because that drives shelf thickness and support.

Recessed niches for display

Santerson Open Display Niches sets display back into the wall plane instead of projecting it forward. This is where niche depth, height and the reveal edge need explicit agreement, because a shallow niche reads as an entirely different detail once lighting is added — and unlike a shelf, a recess cannot be adjusted after the wall is built.

Media and equipment behind the wall

Where the wall carries a screen or media components, Santerson Integrated Media Storage is the configuration to discuss. Bring the actual screen size and mounting method, plus what needs to be reachable: consoles, soundbar, power strip, remote line of sight and cable routes. Ventilation and access panels are far easier to design in than to cut later.

Agree the Door and Panel Language

Front-of-wall choice is where a storage wall either disappears into the architecture or reads as furniture. Sliding fronts are covered by Santerson Sliding Storage Panels — confirm track type, overlap, how much of the opening is exposed when a panel is parked, and the clearance the panels need at the ceiling and floor. Where the brief calls for a flush, handle-free look, specify that with the internal doors as well, so the two details match: Santerson Handleless Concealed Doors is made to measure on the same basis, which keeps reveal and finish consistent across the project.

For each opening, write down: swing or slide, handle or push mechanism, panel width, and whether the panel meets a ceiling line or a floor line. Those four answers prevent most on-site surprises.

Lock Down Materials and Finishes With Physical Samples

Finish, layout and dimensions can be specified to suit each space, and the collection is offered with material and finish choices. Under Custom Furniture Materials and Finishes, the range includes woods, metals, engineered stone and laminates, together with detailing such as engraving and logos where branding is part of the brief. Confirm which substrates and finishes are available for the configuration you are specifying.

Our advice on this step is unglamorous but effective: approve finishes from samples in the room, under the room's own lighting, before production is released. Veneer figure and sheen level are almost impossible to judge from a screen or a small offcut, and grain direction across a long run should be agreed on the elevation drawing, not left to the factory.

  • Specify sheen (matte, satin, high gloss) in writing for every face, including edges and internal box fronts.
  • State grain or pattern direction for veneer and textured panels on each elevation.
  • Confirm which surfaces are visible when doors slide or open, so those faces carry the approved finish.
  • Record the sample reference against the drawing revision it applies to.

Lighting Is a Joinery Decision, Not an Afterthought

Recessed display lighting inside a storage wall needs a channel, a driver location and a switching plan, all of which are joinery items. Santerson Integrated Cabinet Lighting is specified with the cabinetry, so agree it at the same time as the elevations: which bays are lit, whether light is top-down or concealed in a shadow gap, where the transformer sits and remains accessible, and what the electrician must pull into the wall before it closes. Confirm electrical ratings and compatibility for each configuration with our team before the drawings are frozen.

What to Put in Writing Before Production

Item to confirmWhy it matters before production
Overall width, height and section split against site dimensionsSet-out errors are the most expensive variation on a made-to-measure wall
Carcass depth and projection into the roomAffects circulation, door swings and adjacent built-ins
Open-to-closed ratio and shelf spansDetermines hardware, shelf thickness and load capacity
Panel type: hinged, sliding or concealedChanges tracks, clearances and ceiling/floor details
Finish code, sheen and grain direction per elevationPrevents mismatched faces across a long run
Lighting positions, driver access and circuit planCabling must be in the wall before it closes
Screen or appliance sizes and ventilationCannot be corrected after carcasses are built
Packaging, container loading and delivery sequenceBuilt-in joinery arriving out of sequence stalls installation
Product listings in this collection are configurable, so published pages do not carry fixed dimensions, substrate specifications or technical performance data. Treat every number in your drawings as a project-specific figure that we confirm with you against the selected configuration.

How Delivery and Installation Fit the Programme

Because the wall is manufactured to order, it should be released once the wet trades, flooring and ceiling lines in that room are settled. We handle freight by sea, air and rail with customs paperwork and door-to-door delivery under Furniture Logistics and Door-to-door Delivery, and installation support with inspection and snags under Furniture Installation and After-sales Support. Tell us the site sequence you are working to — including who sets out on site and what must be complete before the wall arrives — so delivery timing matches your programme rather than the other way round.

A Short Briefing Checklist for Your Enquiry

  • Room and wall run, with finished floor and ceiling levels
  • Screens, appliances or equipment to be built in, with sizes
  • Preferred storage mix: open display, closed compartments, niches, media
  • Panel preference: hinged, sliding, concealed or handleless
  • Two or three finish directions, plus what must be matched on site
  • Lighting intent and who supplies the electrical work
  • Site address, delivery access and target installation window

Send drawings or a room sketch and we will come back with an elevation-level proposal for Santerson Full Height Storage Walls, including the configuration options that suit your dimensions. For whole-apartment or villa packages, we coordinate this wall alongside cabinetry, doors, panelling and flooring under Turnkey Interior Project Solutions, which keeps one set of details across the fit-out.

Working on a villa, apartment or hospitality fit-out? Send us your wall dimensions and finish direction and we will prepare a made-to-measure proposal for your project — details on our Contact page.