A freestanding cabinet looks like the easiest item on a fit-out schedule to specify, and that is exactly where the cost surprises start. Before you send an enquiry about a Santerson Freestanding Cabinet, gather six sets of information. With them, your supplier can quote a real price instead of a range, and you avoid the change orders that stall joinery production.
First, Confirm Which Cabinet You Are Actually Enquiring About
This is the single most common cause of mismatched quotations, because "freestanding cabinet" describes a form factor, not one product. On the SANTERSON catalogue the name appears in two different collections.
| If your room is… | The relevant listing is… | What changes in the enquiry |
|---|---|---|
| A living room, study or hallway where the piece will display objects and store things | Santerson Freestanding Cabinet, in the Display Cabinets collection for residential living projects | You specify glazing, shelving, lighting and interior layout |
| A bathroom or utility area where the piece sits on the floor next to a basin or vanity run | Santerson Freestanding Cabinets, in the Storage Units collection for residential bathroom projects | You specify basin and countertop interface, moisture exposure, hardware and plumbing clearances |
Both listings describe configurable pieces with made-to-measure sizing and selectable materials and finishes. Quote the exact page name and URL in your enquiry so the supplier is not guessing which collection to price. If you are furnishing a villa or apartment where both appear, send both URLs and ask for them to be quoted as one package.
Prepare the Room Data Before You Write a Single Word
Made-to-measure work is only as good as the dimensions behind it. A supplier cannot convert "about 1.8 metres" into a production drawing, and an incorrect height turns into a site problem the moment the cabinet arrives.
- Three reference points, not one. Give length, height and depth, and note the floor-to-ceiling height separately because slab levels vary across a room.
- Obstructions in writing. Skirting boards, door swings, light switches, radiators, air grilles, power outlets and wall returns all change a cabinet footprint.
- Floor finish build-up. State whether the stated floor level is finished or structural. Tile, adhesive and underlay can take up centimetres that decide whether a base sits flush.
- Access route to the room. Lift dimensions, stair widths, corridor turns and door heights determine whether a built-up unit travels in one piece or in sections.
Photographs of the wall and a simple dimensioned sketch are worth more than a detailed written description. Send them with the first enquiry rather than waiting to be asked.
Decide What Goes Inside Before You Talk About Looks
Interior layout drives price far more than appearance, so settle it before discussing colour. Open shelving, drawers, closed compartments and glass-fronted sections each need different carcass work, hardware and load assumptions.
For a display cabinet, list what you intend to store and show: books, ceramics, glassware, collections, bar service or media equipment. Weight per shelf and the height of the tallest item set shelf spacing and shelf thickness. If you want lighting inside, say so at the outset rather than as an afterthought — integrated light needs a power feed, a driver location and a switch plan, and those details belong in the first drawing round.
If display cabinets are part of a wider living scheme, it is usually cheaper to specify them alongside related pieces from the same collection at the outset. The Santerson Curio Cabinets and Santerson Illuminated Display Cabinet pages sit in the same collection and carry the same made-to-measure configuration options, so an enquiry that names all three keeps the specification in one conversation.
Bring Finish References, Not Adjectives
"Matte grey" means several different products depending on who is reading it. SANTERSON's catalogue separates finishes by both surface type and application, from lacquered and acrylic surfaces to melamine, veneer and PVC. Send the product page or a finish code you have already seen on the site, and state which surface family you want.
- Name the surface you are comparing against, with its catalogue link if you found it online.
- Say what must match: an existing kitchen run, wardrobes, wall panelling or a door set.
- State the sheen requirement and whether fingerprints and marks matter for that room.
- For bathrooms and utility areas, describe the moisture exposure you actually expect — shower splash zone, ventilated bathroom or a dry cloakroom are treated differently.
If you need a finish outside what is published, ask about bespoke finishes rather than assuming either way. SANTERSON's Custom & OEM service covers custom furniture design and prototyping alongside material, finish and texture choices, which is the right route when a project has a specified colour or grain to hit.
Say Who You Are and What Else Is in the Package
Suppliers sequence work differently for one homeowner buying a single piece than for a contractor buying across several apartments. Being explicit shortens the reply.
- Your role: homeowner, interior designer, builder, developer or procurement lead.
- Quantity and spread: one unit, or the same cabinet repeated across several rooms or units.
- The wider scope: cabinets quoted together with interior fixtures, kitchen cabinetry, wardrobes or bathroom products are usually handled as one project file.
- Programme: the date the pieces must be on site, and any site milestone that cannot move.
SANTERSON works as a furniture and building materials manufacturer for villa, hospitality and office projects, so an enquiry that names the room schedule and the delivery destination can be routed to project handling rather than treated as a single-item order.
Settle Delivery and Installation Expectations in Writing
A cabinet quoted on the factory floor is not the same number as a cabinet landed in a room and installed. Ask how the price you receive is structured before you compare two quotations.
Ask your supplier these five questions
1. What is included in the quoted price, and where does that price stop?
2. How will the unit be packed, and can it pass the access route you measured?
3. Who handles freight, customs paperwork and delivery to your address?
4. Who installs on site, and who carries out the final inspection with you?
5. What happens if a panel arrives damaged or an opening is wrong on site?
SANTERSON's service pages describe freight forwarding by sea, air and rail with customs documentation, container loading and door-to-door delivery, plus on-site installation, inspection and after-sales support. Import terms, duties, transit time, insurance and the exact scope of installation depend on your country and project, so confirm them for your specific order rather than assuming a published figure applies to you.
Check These Before You Press Send
- The exact product page and collection name are quoted, so display cabinet and bathroom storage unit are not confused.
- Dimensions include floor-to-ceiling height and the finished floor level you are working to.
- Obstructions, power outlets and access route are documented with photos or a sketch.
- Interior layout, shelf loads and any lighting requirement are listed.
- Finish references use catalogue names or codes, not colour adjectives.
- Your role, quantities, destination and required on-site date are stated.
Common Questions
Can the size really be changed, or is it a fixed catalogue item?
The product pages describe made-to-measure sizing with selectable materials and finishes, so dimensions are set per project. Supply your measurements with the enquiry and ask for a drawing back before production.
Should I enquire about one cabinet or several pieces together?
Send everything in the same room or apartment at once. Related items such as wall-mounted display cabinets and open shelving can then share a carcass and finish specification, which keeps the joinery consistent and the paperwork in one file.
What is the least useful information to send?
A photograph with no dimensions, or a request for "a similar cabinet". Neither lets a supplier produce a drawing, and both lead to quotations you cannot compare fairly.
How do I confirm the specification once a quotation arrives?
Ask for a dimensioned drawing and a written specification of materials, finish, hardware and interior layout, then check it against your room data before you approve production. The product pages note that dimensions, materials, finishes and storage details should be confirmed for each selected configuration.
Bring those six sets of information to your first enquiry and the conversation moves straight from "how much" to a drawing you can approve — which is where a made-to-measure cabinet either saves money or quietly costs it.