A swim spa on a hotel terrace or in a villa garden has to work two ways at once: it is an amenity guests photograph and pay for, and it is a piece of plant that someone has to site, wire, fill, filter and maintain. That dual role is why project teams increasingly specify a compact configurable unit instead of a full pool. This guide walks through the selection decisions for Outdoor Swim Spa WS-PC05ST-S, one model in our configurable outdoor swim and hydrotherapy range, using the dimensions and equipment the catalogue actually lists.

Where this size of swim spa fits on site

The catalogue footprint for WS-PC05ST-S is 5000 × 2400 × 1470 mm. Read as a planning number, that is a shell roughly five metres long and just under two and a half metres wide — narrow enough to sit along a boundary wall, on a reinforced terrace, or in a courtyard where a lap pool would never be approved, while still giving an adult a straight run against the swim training system. The 1470 mm depth is a seated-and-standing depth rather than a diving depth, which suits hotel fitness use and family bathing, and it keeps the water volume modest for heating.

For villa projects we usually position this class of unit as the wellness element of an outdoor room: next to the lounger set, screened by a pergola or hardtop gazebo, with paving laid around it. For hospitality projects it typically serves a small number of rooms — a boutique wing, a presidential suite terrace, a gym extension — where a full swimming pool would be uneconomic to build and to staff.

What the catalogue specification covers

The figures below are transcribed from the product page for this model. Treat them as the baseline configuration, not as a fixed contract specification: what ships is defined by the configuration your project confirms with us.

ModelWS-PC05ST-S
Catalogue dimensions5000 × 2400 × 1470 mm
Control system1 set
Swim training system1 set
Filter pump1 pc
Jet total6 pcs
LED lights4 pcs
Total power (catalogue)6.55 kW
Features shownWater jets, LED lighting, Ozone, Swim training system

Two entries in that table deserve more attention than buyers usually give them. The first is total power: 6.55 kW is a substantial single load, and on both hotel and villa sites the electrical supply, protective device and cable route must be designed around it before the shell arrives — not after. The second is the swim training system. It is what separates a swim spa from a large spa tub, and it is the feature you are selling when the unit supports a gym, a rehabilitation offer or a "lap swimming without a pool" story in a villa listing.

Options to decide on before you order

The catalogue lists optional accessories for this range, and availability and compatibility vary by model. For project work we recommend settling these at quotation stage, because retrofitting them once the shell is craned into position is expensive:

  • Heat pump — decides whether the unit is a year-round amenity or a warm-weather one. In a hotel this drives both guest satisfaction and running cost.
  • UV sterilisation and ozone — chemical load management matters more in shared commercial use than in private villas, where bather loading is predictable.
  • Sand filtration versus the standard filter pump — a maintenance-interval decision for whoever is cleaning the plant on site.
  • Insulation — worth specifying for any installation that runs overnight or sits in a cooler climate.
  • Steps and access — accessibility, guest safety and paving detail all depend on how people enter the water.

Siting, delivery and commissioning as one package

The selection errors that cost project teams the most money are rarely about jets; they are about interfaces. Slab loading and drainage, the electrical run and its protection, a crane or rigging route to the courtyard, storage of the shell while trades finish around it, and commissioning with someone present who knows the control system. Our Turnkey Interior Project Solutions cover these stages as one scope — consultation, design and planning, production, logistics, installation and after-sales — so the swim spa is not left as an orphan item between a pool contractor, an electrician and a landscaper.

If your project needs a longer water column than 5000 mm allows, the same configurable range includes Outdoor Swim Spa WS-PC05ST-L at 5490 × 2400 × 1470 mm, and the wider Swimming Pools and Swim Spas category covers longer layouts with separate relaxation zones as well as round and square spa formats. Where a project wants a bespoke shape or a hydrotherapy pool built around an existing courtyard, we handle that through custom specification rather than by forcing a standard shell into the wrong space.

Before you issue the purchase order: confirm the exact equipment list for your configuration — control system, swim training unit, pumps, jet count and LED fittings — and hand the total power figure to the site electrician. Confirm included equipment and electrical requirements for the selected configuration in writing, along with the options you want fitted at the factory rather than on site.

Dimensions, equipment counts and power shown above are catalogue figures for this model and apply to the baseline configuration. Optional accessories vary by model and availability; specifications can be revised without notice, and final values are those confirmed in your project quotation.