A smoked glass wardrobe front changes the whole feel of a bedroom or dressing room: it softens reflections, hides what is inside and lets aluminium framing read as a design line rather than hardware. It is also one of those products where a vague enquiry produces a vague quotation. Before you contact a supplier, having the following information ready turns a first email into a workable proposal.

1. The room dimensions, and how you measured them

Smoked glass wardrobe fronts are made to measure, so the drawing matters more than the brochure. Send three numbers for each wall the unit occupies — width, height and depth — plus the position of anything that interrupts the run: a skirting line, a door swing, an air-conditioning return, a downlight, a power point or a window reveal. If the ceiling is not level, say so; a 10 mm variation across a 2.4 m tall door shows up immediately on a glass front.

Be explicit about which dimension governs. A unit that sits into a recess is measured to the smallest width; a free-standing unit butted to a wall can be eased. State whether your numbers are finished-floor-to-finished-ceiling, and whether floor finishes are already installed or still to come.

2. The glass look you actually want

"Smoked" covers a range of tints and densities. Two units described the same way can read very differently under the same lighting. Bring photographs of the reference you liked, and say what you want the front to do: conceal hanging clothes almost completely, or keep a soft suggestion of the interior behind it? Tint depth is easiest to settle when the supplier can send a sample off a reference rather than argue from a screen.

Decide early whether you want smoked glass in a frame or as a plain glass door. Our Smoked Glass Wardrobes are part of the Glass Door Wardrobes collection, where the glass itself carries the elevation. The Smoked Glass Aluminum Frame Wardrobes in the Glass & Aluminium Frame Wardrobes collection put the glass inside a metal border, which reads more like joinery and pairs well with matching framed cabinetry elsewhere in the same project.

Framed or frameless is not only an aesthetic decision. It changes how the door is supported, how the hardware is fixed and how a damaged panel is replaced later — so raise it in the first message, not after the quotation.

3. The door type and how the wardrobe will be used

Glass fronts behave differently depending on the opening mechanism. Sliding doors need clear track depth and a wall run long enough for the panels to overlap; hinged glass doors need clearance for the swing and solid support at the fixing line. Tell the supplier who uses the room and what goes inside — long hanging, folded storage, drawers, an island, lighting in the carcass — because internal layout drives door widths far more than taste does.

  • Number of doors you expect, and any width limit from the room geometry
  • Whether handles are acceptable or you want a handleless edge detail
  • Interior fit-out: shelving, drawers, hanging rails, integrated lighting
  • Whether the unit is for one bedroom or repeated across several rooms

4. Where the project sits and who else is on site

A single villa wardrobe and a repeat-floor enquiry need different conversations. If you are furnishing several apartments, a hotel floor or a villa with matching dressing rooms, say how many units and whether they share one design. Repeat quantities change packaging, spares and how carefully the first unit is signed off before production runs.

Also name the other trades in scope. Wardrobes meet flooring, wall finishes, ceiling lines and lighting, and a supplier who knows those interfaces early can flag clashes at the drawing stage. For projects where wardrobes are one line item among many — cabinetry, vanities, doors, panelling, flooring — sourcing them together with the rest of the fit-out reduces the number of separate deliveries and site handovers to manage.

5. What you need in writing before you commit

Ask for a shop drawing showing door sizes, track or hinge positions and internal layout, and read it against your own room measurements rather than trusting the caption. Then confirm the commercial terms in the same thread:

Item to confirmWhy it matters for glass fronts
Confirmed dimensions and finish codeTint, frame colour and hardware are specified per project; a verbal description is not an order.
Packaging and panel protectionGlass panels need crating and edge protection; how they travel determines what arrives on site.
Delivery terms and who receives the goodsDecides whether you need a dock, a lift booking or a ground-floor drop.
Spares and replacement policyA panel cut to size cannot be swapped from shelf stock; ask what is held and how replacements are ordered.
Installation responsibilityClarify whether your fitter installs, or the supplier provides guidance on site.
One habit saves a great deal of rework: send one consolidated pack — drawings, photographs, quantities and target dates — instead of answering questions one at a time. Suppliers quote faster and more accurately when the first message is complete.

6. What a good first reply should contain

A useful response from any wardrobe supplier includes a priced breakdown by unit, a marked-up drawing with dimensions you can check, notes on anything in your drawings that is unclear, and a realistic production window. If the reply is only a price, the specification has not been read yet — send the drawings again and ask for confirmation of sizes before you approve anything.

SANTERSON works as a furniture and building materials manufacturer on custom projects, from villa dressing rooms to hospitality fit-outs, so wardrobe enquiries usually arrive alongside cabinetry, doors, vanities and finishes. Our Turnkey Interior Project Solutions cover design coordination, production, logistics and site support, which means a smoked glass wardrobe can be specified as part of one package rather than bought in isolation from five vendors.

If you have drawings ready, send the room dimensions, a reference image for the tint, the number of units and your target site date. That is enough for us to come back with a proposal instead of another round of questions — see Contact Us to start.