A swim spa enquiry that only says "5 metres, six jets" will come back with a quotation you cannot compare against anyone else's. Below is the brief we work from on the Outdoor Swim Spa WS-PC05ST-S, written so that project owners, contractors and interior consultants can hand the same list to any manufacturer and get a like-for-like answer.

Start With the Installation Envelope, Not the Model Number

The catalogue drawing for this model shows an outer shell of 5000 × 2400 × 1470 mm. Treat that as the starting point for a site conversation, not as the number you build around. Before a manufacturer can confirm whether the shell fits, they need to know how it will sit on site:

  • Semi-recessed, fully above ground, or fully in-ground? Each option changes the access provisions — steps and platforms for an above-ground unit, a perimeter inspection void and drainage for a buried one.
  • What surrounds the shell? Decking boards, coping, planters and pool fences all consume clearance. Give the finished deck level relative to the water line, because that determines both step height and the depth of the seating zone inside the shell.
  • How does the unit reach the site? A 5 m shell has to pass through gates, around corners and over slabs with a load limit. Say so in the first message; it affects whether the shell arrives as one piece or in sections, and that changes the price more than any accessory will.
  • Where is the plant allowed to sit? Filter pump, control system and any heat pump need ventilation, weather protection and a service reach. A niche behind the unit is not the same as a plant room 8 m away.

Confirm What the Specification Table Actually Includes

Our published table for this model lists one control system, one swim training system, one filter pump, six jets in total, four LED lights and a total power figure of 6.55 kW. Two entries deserve attention before you compare quotations:

  • The water pump is not listed. On this catalogue page the swim pump appears as an option rather than in the standard list, so two suppliers can both claim to supply "the WS-PC05ST-S" and deliver different hydraulic packages. Ask which pumps are included and at what output.
  • Total power is a package figure, not a fixed one. 6.55 kW reflects the equipment set shown on the catalogue page. Add a heat pump, change the swim unit or specify sand filtration instead of cartridge filtration, and the connected load moves with it.

Ask for the bill of materials in writing: item name, quantity, output rating, brand where it matters, and what is excluded. A single page like that settles most disputes before they start.

Item to specifyWhat to write in the brief
Shell sizeCatalogue 5000 × 2400 × 1470 mm; state which dimensions are fixed and which can change, and give your site limit.
Swim training systemQuantity and type, plus whether you want an adjustable resistance setting for different swimmers.
JetsTotal number, position along the shell, and which seats they serve. Six jets is a total, not six per seat.
FiltrationFilter pump quantity and filtration type; the catalogue lists sand filtration among the options on this range.
Water treatmentOzone appears in the features shown for this model; UV sterilisation is listed separately as an option.
LightingNumber of LED fittings and control method — local keypad, remote or app.
HeatingState your target water temperature and whether a heat pump is in scope; it drives both price and electrical load.
Insulation and stepsList them explicitly. Both are optional accessories and are easy to lose between revisions of a quotation.

Give the Electrical Contractor's Constraints Up Front

Electrical ambiguity is the most common cause of a stalled swim spa order. A brief that answers these four questions in the first round saves time on both sides:

  • What supply is available at the property — single phase or three phase, and what voltage?
  • Is there spare capacity in the distribution board, or does a new sub-main need to be run from the meter?
  • Who provides the isolator, the protective device and the RCD/RCBO, and who installs them? Manufacturers typically supply the unit and the local electrician supplies the final connection.
  • What cable route is realistic, and how long will the run be? Cable length becomes a real cost on a large villa site.
The power figures published for any model describe the equipment set shown on that catalogue page. Your local electrical design, including protection, earthing and any requirements set by the local network operator or building authority, must be confirmed with a licensed electrician in your country — a manufacturer's specification sheet is not a compliance document.

Say Who Is Responsible for Civil Works

A swim spa sits at the boundary between two trades, and that is exactly where responsibility gets dropped. Write one line in the brief for each of these:

  • Foundation. Who designs and pours the slab or strip footing, and to what load? A fully buried shell needs a retaining structure; an above-ground unit on a timber deck needs the framing checked by the deck designer.
  • Drainage and waterproofing. For recessed installations, who provides the sump, the perimeter drain and the tanking?
  • Access and lifting. Who supplies the crane or forklift on delivery day, and who prepares the access path?
  • Finishing. Who fixes the coping, decking and any enclosure after the shell is set?

Ask About Customisation Before You Accept a Standard Shell

Because we manufacture rather than re-box, several details that look fixed on a datasheet can often be adjusted: jet layout to match how the client actually uses the water, seat depth, colour of the acrylic shell and of the cabinet cladding, and whether the control panel ends up on the long side or the short side. Ask which changes are available for your project — including whether dimensions can move at all — before treating any catalogue figure as final. If you are specifying for a hotel or a villa package, it is also worth raising Custom & OEM Service early: branding, cabinet finish and control defaults are easier to change at drawing stage than after production starts.

Related models in the same family are worth putting in the comparison. WS-PC05ST is listed with the same 5000 × 2400 × 1470 mm shell, while WS-PC05ST-L is the longer variant — useful when the site has the length and the client wants more swim zone rather than a shorter hydrotherapy stretch.

Delivery, Site Access and Handover

For an order going overseas, ask the supplier to state in writing how the unit is packed, which port it leaves from, whether customs paperwork such as the commercial invoice, packing list and certificate of origin is provided, and who handles the last leg to your gate. Our Logistics & Door-to-Door Delivery service covers freight forwarding by sea, air and rail with documentation support, but import duties, local taxes and any permit requirements are the buyer's side of the line and should be checked with your own customs broker.

Then agree what "finished" means. Commissioning on site, a walkthrough of the control system, spare-parts provision for consumables such as filters, and the warranty terms — including what voids them — should all appear in the order confirmation rather than in a follow-up email six months later. See Installation & After-sales Support for how we handle handover, and ask your supplier to state their warranty period and exclusions in writing.

A Short Brief Checklist

  • ☐ Site photos, plan and finished levels, plus how the shell reaches its final position
  • ☐ Installation type: above ground, semi-recessed or fully in-ground
  • ☐ Required equipment list with quantities — swim system, jets, filtration, treatment, lighting, heating, insulation, steps
  • ☐ Supply type and electrical constraints at the property
  • ☐ Named responsibility for slab, drainage, lifting, coping and decking
  • ☐ Delivery terms, documentation and who clears customs
  • ☐ Commissioning, spares and warranty written into the order confirmation

Send the same list to three suppliers and the quotations start to line up. Where they still differ, the gap is usually something the brief made visible — a swim pump quoted by one supplier and left out by another, an unquoted heat pump, or a crane nobody budgeted for.

Send us your site drawings and equipment list. As a China-based furniture and building materials manufacturer, SANTERSON quotes the WS-PC05ST-S against your actual installation condition, including customisation, freight and handover. Contact PHILLIP by phone or WhatsApp on +86-13928214007, or email santerson@qq.com.