A swim spa quotation is only as good as the information behind it. For Outdoor Swim Spa WS-S08M, the difference between a rough ball-park figure and an order-ready price comes down to what you send us before we quote: site conditions, the configuration you actually want, and how the unit will reach your project. This guide walks through each item so a first enquiry can turn into a firm quotation without three rounds of back-and-forth.
Start from the standard specification
WS-S08M is part of our configurable outdoor swim and hydrotherapy range. The catalogue entry lists the shell at 8020 × 2260 × 1280 mm, with water jets, LED lighting and ozone treatment among the features shown for this model. The specification block on the product page records a control system (1 set), two water pumps, one filter pump, 58 jets in total, one main LED light plus 26 small LED lights, and a total power figure of 6.95 kW.
Read those numbers as a starting point rather than a fixed order. The product page does not list a swim training system for this model, so if lap swimming is part of your plan, say so in the enquiry and we will confirm what applies to the configuration you select. Electrical load, pump count and jet layout all change with options, and we quote exactly what is specified at the time.
| Catalogue dimensions | 8020 × 2260 × 1280 mm |
| Features shown | Water jets, LED lighting, Ozone |
| Pumps | Water pump 2 pcs; filter pump 1 pc |
| Jets | 58 pcs in total |
| Lighting | 1 LED light; 26 small LED lights |
| Total power | 6.95 kW (as listed for this configuration) |
Tell us which options belong in your build
The catalogue lists optional accessories for this range, and availability and compatibility vary by model. Before we price the unit, confirm which of these you want:
- Control system — the standard set shown in the specification, or an alternative arrangement.
- UV sterilisation and ozone — how you intend to manage water treatment on site.
- Water pumps and heat pump — including whether year-round use is expected.
- Sand filtration and insulation — relevant where the spa sits in a cooler or exposed location.
- Steps and access — entry side, step style and any accessibility requirement.
If none of the standard layouts suits your terrace, courtyard or resort deck, our Customizable Shape Outdoor Spa covers square, round, oval and curved forms with an acrylic shell and structural reinforcement, for gardens, terraces and leisure areas. Send a sketch or a plan drawing and we will work from that instead.
Send the site information with your enquiry
The fastest quotations come with the site facts already attached. Please include:
- Delivery address and whether the site is a private villa, hotel, resort or clubhouse.
- Ground conditions — slab, deck, plinth or recessed installation, plus access for delivery.
- Available power supply and the local electrical standard, so the 6.95 kW figure can be checked against what your site provides.
- Quantity and target installation date.
- Any finish preference for the cabinet or surround, if the spa is being integrated into a larger outdoor scheme.
Where the swim spa forms part of wider works, we can coordinate it alongside other items in the same project. As a one-stop furniture and building materials supplier, SANTERSON handles design consultation, material selection, production and site coordination for villa, hospitality and office projects, so pool, outdoor furniture, lighting and finishes can be scheduled together rather than managed as separate purchases.
What happens after you submit the enquiry
Our service workflow runs through consultation, design and planning, production, logistics, installation and after-sales. For a swim spa this means:
- Configuration review. We confirm the model, options and included equipment against your site conditions, and flag anything the catalogue does not settle.
- Quotation and detail confirmation. You receive an itemised price covering the selected configuration, packaging and the agreed delivery terms.
- Production and quality checks. The unit is built to the confirmed specification before shipment release.
- Freight and documentation. Sea, air and rail forwarding with the commercial paperwork your import clearance needs; door-to-door delivery can be arranged where required.
- Installation and after-sales. On-site guidance, inspection of the completed work, and support for spare parts and maintenance afterwards.
A short checklist for your first message
Copy this list into your enquiry so we can return a workable quotation quickly:
- Model: Outdoor Swim Spa WS-S08M (or "not sure — please advise on size")
- Dimensions available on site, with a photo or drawing of the position
- Options required from the accessory list above
- Power supply details and local electrical standard
- Quantity, project type, delivery address and target date
- Whether you need door-to-door delivery and on-site installation support
Send your WS-S08M enquiry with the details above and we will confirm the configuration, included equipment and electrical requirements before pricing. Contact SANTERSON — ask for Phillip, by phone or WhatsApp on +86-13928214007, or email santerson@qq.com. Our contact page lists business hours as Monday–Saturday, 8:00 AM–6:00 PM (GMT+8).