A raised panel wardrobe door is one of the easiest built-in items to get wrong on a project. The profile reads as classic without being fussy, but the panel only looks right when the frame widths, door sizes and the wall behind it are all agreed in advance. Because these doors are made to measure rather than picked off a shelf, everything the buyer sends us shapes the outcome: the opening, the room condition, the storage plan and the finish schedule. Below is the shortlist of measurements and project inputs we work from on raised panel wardrobes, and what each one changes.

Start with the opening, not the door

Wardrobe carcasses are built to fit the structure, so we need the opening recorded at three heights and three widths across the same run — top, middle and bottom for height, left, centre and right for width. Older villas and renovated apartments rarely give you a square, plumb wall, and a difference of around 15 mm between the two ends of a long run is one we check for on site. That difference decides whether we scribe the end panel, pack out the frame, or split the run into differently sized doors.

  • Overall width, height and depth of the alcove or wall run, measured at several points rather than one.
  • Floor-to-ceiling height at the deepest point, plus the floor finish build-up if screed, tile or engineered boards are still to be laid.
  • Position and projection of skirting, architraves, cornices, downlights, air grilles and any exposed pipework inside the run.
  • Location of switches, sockets, thermostat panels and structural columns that a carcass or door would cover.
  • Ceiling void depth if the wardrobe is to be taken to the ceiling with a bulkhead above it.

Door geometry: what fixes the panel proportions

On a raised panel door the frame — stile and rail — carries the moulding, and the field sits proud of it. Two numbers drive how the door reads in a room: the width of each door leaf and the width of the frame around the field. A narrow wardrobe door with a wide frame looks heavy; a tall door with a thin frame can look flimsy and, on wider leaves, is more prone to cupping over time.

  • Number of doors across the run, and whether leaves should be equal width or paired around an off-centre opening.
  • Hinged or sliding operation. Hinged leaves need clearance from beds, vanities and door swings; where the frontage is tight, a sliding door corner wardrobe keeps the run usable right into the return wall.
  • Preferred frame width and profile depth, or a sample / existing door to match on a renovation.
  • Panel style within the same family — recessed panel wardrobes sit the field below the frame, which reads flatter and is easier to wipe down.
  • Handle or handleless edge detail, and whether hardware should be supplied with the doors or sourced locally.

The internal layout you actually want

Panel doors hide the storage plan, so send us that plan early — it changes shelf positions, hanging rail heights and whether an interior needs a deeper carcass. We build wardrobes around how the space is used: long hanging for coats and dresses, double hanging for shirts, drawers for folded items, open niches for daily bags. Our custom minimalist bedroom wardrobe work follows the same method, so if a project mixes classic panel doors in one bedroom with flat-front storage in another, the internal modules stay consistent.

  • Hanging heights required, including full-length sections and any pull-down rails.
  • Drawer counts and depths, plus whether trays should be pull-out or fixed shelving.
  • Lighting inside the carcass: door-activated, motion sensor, or none.
  • Any integrated vanity, ironing station, laundry hamper bay or safe location.

Materials, finishes and the rest of the schedule

Panelled doors are a finish decision as much as a profile decision. Classic panelled solid wood wardrobes behave differently from veneered or lacquered fronts in dry rooms and near heating outlets, so we match the board and surface to the room rather than defaulting to one specification across a whole building. Send the finish schedule with the joinery pack: paint colour and sheen for painted doors, veneer species and grain cut for timber fronts, and edge treatment where the door meets a wall.

Where a project carries other built-ins — kitchen cabinetry, media walls, wall panel systems — send those drawings too. We run the same veneer, lacquer and ironmongery across wardrobes and panelling so the joinery reads as one package instead of several trades interpreting a mood board separately.

Project inputs beyond the tape measure

InputWhy we need it
Room list with quantities per bedroom, plus a marked-up plan of each wardrobe wallSets the door count, carcass sizes and production split across the project.
Construction stage — slab, plasterboard, or already fitted outDetermines whether we site-measure now or schedule measurement after finishes are in.
Floor finish levels and door thresholdsControls carcass base detail and clearance under hinged leaves.
Finish schedule and ironmongery sourceKeeps doors, panelling and cabinetry on one specification.
Delivery address, access route and lift or stair dimensionsDecides panel sizes, packaging and whether carcasses are assembled on site.
Local installer arrangementWe supply installation guidance and site coordination; who fixes on site changes the handover plan.

One point worth stating plainly: raised panel wardrobe fronts are made to measure, with material, finish and layout specified per project. The dimensions and specifications above are what we confirm with you before production starts, not a standard size list.

How the information reaches us

SANTERSON is a China-based furniture and building materials manufacturer supplying project orders for villas, hotels and offices. For built-in joinery we work from your drawings first, then confirm dimensions on site or through your site team before release to production. Custom and OEM work covers bespoke sizes, finishes and branding, with freight arranged to the delivery address — useful when a project has several bedroom types repeated across a building.

Send us the opening dimensions, a marked-up elevation of each wardrobe wall, your internal storage requirements and the finish schedule. We will return a specification and quotation for the panel doors and carcasses, with any conflicts in the drawings flagged before anything goes into production.