A square swim spa in a compact footprint is one of the easiest outdoor water features to specify for a villa terrace, a resort courtyard or a hotel wellness deck — and one of the easiest to get wrong on paper. This article walks through how OEM sourcing works for our Outdoor Swim Spa WS-PC03: what has to be fixed before a drawing is issued, what can legitimately be changed under an OEM or custom programme, and which confirmations decide whether the finished unit behaves on site the way it did in the quotation.
What the standard WS-PC03 configuration already covers
WS-PC03 sits in our configurable outdoor swim and hydrotherapy range, with catalogue dimensions of 3000 × 3000 × 1000 mm. The square plan is what makes the model useful in tight settings: it fits a paved terrace corner, a podium deck or an indoor wet room without the long swimming channel that elongated models require. That also means there is little spare room to absorb errors — the shell, the plant space, the access hatch and the circulation route around the unit all have to be planned together.
The specification shown on our product page gives a starting point for comparison between configurations:
| Model | WS-PC03 |
| Catalogue dimensions | 3000 × 3000 × 1000 mm |
| Jet total | 50 pcs, including 4 water columns |
| Water pump / filter pump | 1 pc each |
| Control system | 1 set |
| LED lights | 1 pc |
| Total power | 2.75 kW |
| Features shown | Water jets, LED lighting, Ozone |
| Swim training system | Not listed for this model |
Two details in that table matter more than they look. The swim training system is not listed for WS-PC03, so a buyer who wants lap swimming against a current should be steered to the longer models in the swim spa range instead of having a jet added after the fact. And the 2.75 kW figure is the total power for that configuration; it moves as soon as heating, extra pumps or additional treatment equipment enter the specification.
For buyers who want the same square plan with more water volume, our customizable shape outdoor spa covers square, round, oval and curved layouts in an acrylic shell with structural reinforcement — useful when the space is fixed but the seating arrangement is not.
Step 1: agree the fixed dimensions and siting before anything else
OEM work on a spa shell is more constrained than re-covering furniture. The shell mould, the reinforcement layout and the position of the plant compartment follow from the external size and the internal seating geometry. In practice we ask buyers to settle three things first:
- The finished external size, including cladding thickness — not just the acrylic shell.
- How the unit meets the ground: fully recessed, partially recessed, or free-standing on a deck with steps.
- Where the operator can reach the pumps, filter and control system after installation, without removing finishes.
Once those are fixed, everything else in the OEM discussion becomes a priced option rather than a redesign. If the required size is materially different from 3000 × 3000 × 1000 mm, we would normally propose an existing model that matches the space instead of forcing a non-standard shell. The same applies to siting: recessed, semi-recessed and free-standing builds need different detailing around the cabinet, the steps and the access panel, and that decision changes the drawings.
Step 2: choose what to change under the OEM programme
Our Custom & OEM service covers custom design and prototyping, bespoke material finishes and textures, OEM manufacturing, flexible minimum order quantities and brand customisation such as logos and packaging. For a swim spa, that usually translates into the following decisions:
- Cabinet finish. Cladding colour and texture to match adjacent façade or decking materials, so the exterior reads as part of the building rather than as equipment placed in front of it.
- Water treatment. Ozone is shown on the standard configuration; UV sterilisation and sand filtration are options listed in our catalogue for this range. Which combination applies depends on usage intensity and the maintenance routine the owner will actually run.
- Heating. A heat pump can be included where year-round water temperature is required. This is the single biggest change to the electrical load, so it must be decided before the power figure is quoted.
- Insulation and steps. Insulation limits heat loss and running cost where the water is kept warm in cool conditions; integrated or separate steps affect the footprint and the entry height.
- Controls and lighting. Control system layout and LED arrangement, including any branding elements on panels and packaging.
Catalogue-listed options for this range also include additional control systems, water pumps and sand filtration. Availability and compatibility vary by model, so each option has to be confirmed against the specific unit being produced — an option that exists somewhere in the catalogue is not automatically available on WS-PC03.
Step 3: confirm the equipment list, siting and power supply before ordering
This is where most swim spa enquiries stall. Before production starts, we need written confirmation of:
- Included equipment. The exact jet count, pump set, filter, control system and lighting for the order — not a general model name, because two configurations of the same model can differ in what is in the cabinet.
- Electrical requirements. Supply voltage, phase, dedicated circuits, protection device and the routing of cables to the control position. Electrical work on site should be shown on the drawing package that accompanies the order.
- Structural support. A filled spa is a heavy concentrated load. The deck, slab or recess must be engineered for it by the party responsible for the building works.
- Access and handling. Route from the delivery vehicle to the final position, including gate widths, crane or lifting requirements if the unit crosses a roof or upper balcony.
Because SANTERSON supplies furniture and building materials as one package, the swim spa is often ordered alongside the terrace finishes, outdoor furniture and interior fixtures around it. That is convenient, but it does not merge responsibilities: the site preparation stays with the local contractor, while we coordinate production, packing and shipment from our side under our one-stop solution scope.
Step 4: production, QC and shipping checkpoints
For an OEM order the sequence follows our cooperation steps: project brief and design proposal, quotation with the option list priced line by line, then production and quality control at assembly. Two checks are worth insisting on before the unit is crated — a filled functional test of jets, pump, filter, ozone or UV equipment and controls, and a signed record of the final configuration against the order sheet. On our side we prepare commercial invoices, packing lists and shipping documents under our logistics and door-to-door delivery service; buyers should confirm the import terms, duties and delivery scope that apply in their own country for each shipment rather than assuming them.
Specification note: dimensions, jet counts and power ratings quoted above are transcribed from the WS-PC03 catalogue page. Treat them as the reference configuration for comparison, and confirm the included equipment and electrical requirements for the exact configuration being ordered before any site works begin.
Common OEM mistakes we see on enquiries
- Buying a model by name. The same model code can be quoted with different options, so the option list — not the code — is what should appear on the purchase order.
- Adding heating after the electrical plan is fixed. A heat pump changes load and circuit sizing; late changes mean rework by the local electrician.
- No access provision. A recessed unit with no reachable plant space turns a filter replacement into demolition.
- Assuming a swim current is available. WS-PC03 does not list a swim training system; if lap swimming is the brief, the model choice should change at enquiry stage.
A short FAQ for buyers specifying WS-PC03
Can the square footprint be changed?
Small changes to cladding, steps and cabinet detailing are normal OEM work. Changing the shell size itself is a different conversation — we would first check whether another model in the range already fits the space.
Can our own brand be applied?
Yes, within our OEM programme: engraving, embossing, logos and packaging are listed services. Confirm artwork, placement and minimum order quantities before production.
Does the standard configuration include a heat pump?
The catalogue features for this model are water jets, LED lighting and ozone; heat pumps appear in the options list for the range. If heated year-round use is required, ask for it on the enquiry so the power figure and circuit sizing reflect the finished build.
Who handles installation?
We describe on-site installation, inspection and snags, warranty coverage, spare parts and ongoing maintenance as part of our installation and after-sales support. Site preparation such as foundations, electrical supply and waterproofing stays with the local contractor. Scope, response times and warranty terms should be confirmed in writing for your project.
If you are specifying a swim spa for a villa, resort or hotel wellness area, send us the space dimensions, intended use and target configuration, and we will reply with the matching model, an itemised option list and the electrical requirements for that build. Enquiries: contact SANTERSON.