A wardrobe enquiry that arrives with a floor plan, a room elevation and a shortlist of finishes usually comes back with an accurate quotation and a clear production schedule. An enquiry that says only "oak wardrobe, 2 metres wide" usually comes back with more questions than answers. Solid timber is unforgiving about missing information: grain, cut method, moisture content and panel construction all change both the price and how the finished piece behaves in the room it lives in.
If you are sourcing Oak Solid Wood Wardrobes for a villa, apartment or hospitality room package, the checklist below is what we ask every project customer to have ready. Bring these items and the first round of correspondence can be about design and value instead of basic definitions.
1. Room dimensions taken the way a manufacturer reads them
Send the wall length, wall height and depth available, plus what the wardrobe has to work around: skirting, architraves, air-conditioning returns, doors that swing into the run, and corners that are out of plaster. For a fitted run, give both the minimum and maximum measurements along the wall rather than one averaged figure, because solid timber carcasses cannot be scribed to an uneven wall the way a plasterboard reveal can.
- Floor-to-ceiling height at the start, middle and end of the run
- Usable depth behind any door swing or handle projection
- Position of sockets, switches and light points that must stay reachable
- Whether the ceiling is level, raked or coffered
Photographs of the wall, taken straight on and from each end, cost nothing and resolve most of the ambiguity before a drawing is started.
2. What "solid wood" means for your specification
This is the single largest source of misunderstanding in solid timber wardrobe enquiries, and it is worth settling before you compare prices from two factories. A carcass can be built from solid oak throughout; it can combine solid oak frames with engineered panels; or it can be a substrate faced with an oak veneer that looks identical once installed. Each option behaves differently as the room warms and cools through the year, and each carries a different cost.
| Construction | What to ask the supplier to confirm |
|---|---|
| Solid timber throughout | Which parts are solid, panel construction (tongue-and-groove, framed panel), and how movement allowance is handled on wide doors |
| Solid frame with engineered core | Core material, thickness, edge banding method and finish compatibility between frame and panel |
| Oak veneer | Veneer cut and grain match, whether the specification is being described as veneer or as solid |
The Built-in Furniture range covers oak, walnut, cherry and mahogany in the Solid Wood Wardrobes line, including Classic Paneled Solid Wood Wardrobes, so the same room can be quoted against more than one construction type.
3. Interior layout, not just the outside face
The door style decides how the bedroom looks; the internal layout decides whether the wardrobe is used. Before you write to a supplier, walk through how the space will actually be filled and note hanging heights for long garments, drawer counts, shelf spans, lighting in niches, and whether an ironing board, vacuum or luggage has to fit inside.
- Hanging sections: single or double hang, plus a dedicated long-garment bay
- Drawers: number, depth, soft close, and whether they sit above or below hanging rails
- Shelves: span width, since a long unsupported shelf in solid timber will deflect over time
- Extras: trouser pull, valet rod, jewellery tray, integrated lighting, mirror on a door face
If the layout is still open, say so. A supplier who handles Interior Design Services can return a space plan and 3D rendering of the run, which is often faster than agreeing one over email.
4. Finish, hardware and the samples you want to see
"Oak" covers a wide field. Clear lacquer, white-washed, fumed, smoked, brushed and pigmented stains all read as oak on a brochure and look quite different against your flooring and doors. State the sheen level you expect and whether the finish is sprayed or wiped, then ask for physical samples of both the board and the stain before any order is placed.
- Finish system and sheen, plus who applies it - in the factory or on site
- Hinges, slides and handles: brand, load rating, soft close, and finish match to ironmongery elsewhere in the project
- Whether door heights need an anti-warp rail or tension device on tall leaves
5. Site conditions, sequence and access
Built-in joinery is a fixed interface with the building, so its tolerances depend on work that finishes before it. Tell the supplier where the project stands: whether floors, plaster and paint are complete, and how the room will be heated and ventilated once occupied. Solid timber responds to the conditions around it, and a factory that knows those conditions can design for them rather than discover them later.
- Trade sequence: which trades finish before the joinery is fitted
- Whether the wall shares a bathroom, or the floor beneath has underfloor heating
- Delivery route - lift dimensions, stair width, corridor turns and parking for a long vehicle
- Who fits on site: your contractor, or the supplier's installation team
For projects overseas, this is also where Furniture Logistics and Door-to-door Delivery arrangements get settled: crate sizing, container loading plan, import paperwork and the delivery address all follow from the dimensions you supply.
6. Commercial details that let a quotation be compared
| Item to state in the enquiry | Why it matters |
|---|---|
| Quantity of sets or linear metres, and whether it is one-off or repeated across units | Repeated layouts price differently from a single bespoke piece |
| Target delivery window and the date the room must be finished | Solid timber needs drying, assembly and finishing time that cannot be compressed without risk |
| Incoterms you want quoted - FOB, CIF or delivered to site | Makes two factories' prices comparable on the same basis |
| Payment terms and how variations are priced after approval | Change orders on joinery are common; agreeing the mechanism early avoids disputes |
| Inspection point before shipment, and who signs off the approved drawing | The approved drawing is the reference for everything that follows |
Where the wardrobe is part of a wider room package - cabinetry, doors, wall panelling, flooring - it is worth asking whether one supplier can cover the whole scope. When One-stop Furniture and Building Materials Supplier arrangements are used, finish matching, drawing coordination and shipment scheduling sit under a single point of responsibility.
A short list to paste into your next enquiry
- Room measurements at three points, with photographs of the wall
- Construction type confirmed: solid, framed, or veneer - stated in writing
- Internal layout and the items that must fit inside
- Finish system, sheen and sample requirement
- Hardware specification and load ratings
- Site condition, trade sequence and delivery access
- Quantity, target window, Incoterms and inspection point
Send those seven items and a competent supplier will reply with a drawing, an itemised price and a realistic production date rather than a set of questions.