Why a Specification Matters More Than a Picture
A wall-mounted media unit looks simple in a photograph. One panel, a shelf for the television, some closed storage below. The moment that image reaches a workshop, however, it becomes a set of unresolved questions: what size, which substrate, which edge, which hardware, who supplies the power and signal points behind the panel, and how the unit meets a finished wall that is never quite square. A Santerson Storage & Display Combo is supplied as a configurable system rather than a fixed catalogue item, so the specification you send is what determines whether the finished wall matches the drawing.
Built-in joinery is rarely rejected for its design. It is rejected, delayed or reworked because of gaps in the paperwork: a dimension taken before the floor finish was laid, a cable route left undecided, a finish named by colour alone. The checklist below covers the fields we need on every media wall enquiry, and explains what each one changes on site.
Start With the Room Record, Not the Unit
Before sizing anything, record the conditions the unit has to live with. For a villa or apartment fit-out, send us:
- A measured wall elevation with finished floor level, ceiling height and the position of skirting, cornices and any bulkheads.
- The wall construction — masonry, stud partition, or an existing framed wall — because fixing method and load capacity follow from it.
- The location of existing power, data, aerial and downlight circuits relative to the proposed unit.
- Door and opening clearances, plus the traffic line in front of the wall, so drawer and door swings are not blocked.
- For hospitality work, the room type and quantity, since repetition is what makes tolerances visible across a floor.
If you are working from our interior design services, this record is also the input for layout planning, concept design and 3D visualisation, so one set of measurements carries through from drawing to production.
The Eight Fields Every Specification Needs
| Field | What to state | Why it matters |
|---|---|---|
| Overall envelope | Width, height and depth at finished levels; whether the unit runs floor-to-ceiling or stops short | Sets panel joints, transport segments and whether site trimming is required |
| Television opening | Screen size range, mounting method, clear opening width and height, ventilation allowance | Determines bracket fixing, panel cut-out and rear clearance |
| Open versus closed ratio | How much display shelving, niches and closed cabinetry you want, and where | Drives the internal layout and how visible cable runs remain |
| Internal configuration | Shelf heights (fixed or adjustable), drawer counts, tall cabinet bays, appliance or equipment housing | Affects shelf spans, load deflection and hardware selection |
| Doors and access | Hinged, sliding or flap; handleless or handle; any sliding panel TV system travel direction and pocket | Sliding systems need track length and an overlap zone that hinged doors do not |
| Substrate and finish | Board type, veneer, lacquer, melamine or acrylic, sheen level, and a physical or named colour reference | Finish governs cost band, edge treatment and how light reads on the surface |
| Services | Cable pass-through positions, socket and switch positions, integrated lighting type and driver location | Drivers and transformers need a reachable position for maintenance |
| Interface details | Shadow gaps, scribes, skirting treatment, returns to adjacent joinery or wall panels | Decides whether the unit reads as built-in or as furniture against the wall |
Decide the Open-to-Closed Balance First
This is the decision that shapes everything else, and it is best made with the end user rather than at drawing stage. Display shelving needs a shelf span that will not sag under books and objects, and it keeps equipment visible unless you plan cable management deliberately. Closed cabinetry hides hardware but consumes internal depth with doors and hinges.
Two useful references when you are weighing the balance: open display niches within an integrated storage wall, where lit recesses carry the display role and everything untidy sits behind doors; and integrated media storage, where equipment, consoles and media are housed inside the same plane as the surrounding cabinetry. If you need the television itself concealed when not in use, a sliding panel arrangement solves it — but it needs the track zone planned from the first sketch, not added later.
For a whole-apartment package, the media wall rarely stands alone. Where bedroom and hallway joinery is being ordered at the same time, keep finish names and edge details identical across full height storage walls and shelving so the timber grain and sheen read as one scheme.
Write the Finish Field Carefully
"Grey oak, matt" is not a specification. Two buyers and two workshops will produce three different results from that phrase. For each surface in the unit, state:
- The material route — wood veneer, lacquer, melamine, acrylic or a decorated panel — not only the appearance.
- The sheen band you expect, and whether grain direction is continuous across adjacent panels.
- Edge treatment on visible shelf fronts and reveals: solid lipping, ABS edge, or a matched mitre.
- Whether interior cabinet boxes match the exterior finish or take a standard lining.
Our custom and OEM service covers bespoke finishes, textures and prototyping, so where a project needs a matched colour or a specific grain-matched run, that requirement should be written into the specification as a sample approval step rather than assumed.
Plan the Services Before Panels Are Cut
Cable and lighting decisions are the most common late change on a media wall. Settle them at drawing stage:
- Position every pass-through by dimension from a fixed corner, not "behind the TV".
- State which devices sit inside the unit and which sit behind the panel, with access to each.
- Choose integrated lighting — shelf strip, niche wash or vertical accent — and name the driver position where it can be reached after installation.
- Confirm switch control: local, remote, or linked to a room system, since wiring differs for each.
Where the joinery carries lighting, our integrated cabinet lighting range is specified alongside the carcass so profiles and diffusers are fixed to the shelf detail rather than surface-fitted afterwards.
Confirm Before Production: The Sign-Off List
- Elevation drawing signed against finished levels, with the datum stated on the sheet.
- Internal layout confirmed for every bay: shelf positions, drawer stacks, equipment housing.
- Finish schedule approved per surface, including sheen and edge treatment.
- Hardware confirmed — hinges, slides, handles or handleless profile — with opening direction.
- Services drawing issued: pass-throughs, sockets, drivers, lighting circuits.
- Delivery and access route checked: segment sizes against lifts, stairs and door widths.
- Site sequence agreed — where the unit sits relative to flooring, painting and other trades.
Dimensions for this collection are made to measure per project, and material, hardware and electrical options are confirmed with each specification. We do not publish fixed sizes or performance figures for configurable wall systems; the approved drawing is the controlling document.
Delivery, Installation and Handover
Because these units ship in panels rather than as one assembled box, the access route decides the segmentation. We handle freight by sea, air or rail with the associated paperwork and door-to-door delivery, and confirm segment sizes against your site access before packing. On site, installation is followed by inspection of doors, drawers and sliding mechanisms, with a snag list closed out before handover — details in installation and after-sales support.
For projects combining the media wall with other built-in joinery, kitchen cabinetry or interior fixtures, a single package keeps finish schedules and site sequencing under one coordination point. That is how the turnkey solutions workflow for villa, hospitality and office projects runs: consultation, design and planning, production, logistics, installation, after-sales.
Send us the wall elevation and the eight fields above, and we will return a configuration drawing with finish schedule for review before anything enters production. Enquiries reach our contact page, or phone and WhatsApp +86 139 2821 4007 to speak with Phillip about your project.