A request for quote on metallic acrylic cabinets rarely fails because the buyer asked for the wrong product. It fails because two suppliers priced two different things, and the numbers came back uncomparable. One quotation covers a made-to-measure run in a single finish with hardware included; the other covers standard carcasses, no handles, flat-pack, port of loading only. Neither is wrong — but the buyer cannot award from it.

Metallic acrylic door panels sit at the more finish-sensitive end of the cabinet range, which is exactly where missing information turns into rework. The checklist below is what we need from a project buyer to quote accurately the first time, and it is equally useful as an audit sheet when you are reading three competing offers.

Start With Scope, Not Finish

Before any surface decision, fix what the quotation has to cover. Metallic acrylic is a door and panel finish; the carcass, the interior fittings, the worktop and the appliances usually sit outside it. State plainly which of these you want priced and which you are supplying yourself.

  • Cabinet lines only, or a full fit-out that also covers custom built-in kitchen cabinets for the whole home — tall units, laundry joinery and other built-in cabinetry in matching or complementary finishes.
  • Whether carcasses are included with the doors, or whether you are buying door panels against locally sourced boxes. This single line changes the price more than any finish choice.
  • Worktops, splashbacks, plinths, scribes and trims — in scope or excluded.
  • Hardware: hinges, drawer runners, lift systems, legs, handles or handleless profiles. Our custom built-in kitchen cabinets are supplied with matching cabinet hardware — hinges, drawer slide rails, support legs and connecting brackets — specified on request, so say explicitly whether you want that bundled or quoted separately.
  • Appliances. If integrated appliances are in scope, we need the model list at quotation stage, because appliance cut-outs drive carcass dimensions.

The Drawings We Actually Need

A floor plan alone is not enough for a made-to-measure quotation. The Metallic Acrylic Cabinets range is built to project-specific dimensions, so the quote follows the accuracy of your information.

DocumentWhat it must show for an accurate price
Cabinet elevationsEvery run, both walls, with overall height and width per section, and the split between wall units, base units and tall units.
Cross-sectionsCarcass depth, door thickness, worktop thickness, plinth height, and any scribe or filler at uneven walls or ceilings.
Floor plan with levelsSnap lines, finished floor levels, and whether the slab is level. Out-of-level floors change the scribing allowance.
Services setting-outSink, hob, oven, dishwasher and extractor positions, plus gas and water points and flue routes.
Appliance scheduleModel numbers and dimensions for every integrated unit.
Interior layout preferenceDrawer stacks versus hinged doors, pull-out larder, corner solutions, cutlery organisation — this is where price per metre varies most.

If drawings are still at concept stage, say so and send what you have. We can work from a marked-up plan and confirm dimensions in production rather than stall the quotation.

Specify the Metallic Finish Properly

"Metallic" is not a specification. Two panels can both be called metallic and look nothing alike under kitchen lighting, because metallic acrylic varies in sheen level, in the depth of the metallic flake, and in whether the surface is brushed, mirrored or softly satin.

Name the direction you are heading in

Tell us the effect you want, and we will match it against what the panel range offers. Useful reference points:

  • Sheen level. A high-sheen metallic reflects furniture and windows; a satin metallic holds the colour and reads calmer in a small kitchen. If you are weighing both, compare them against High Gloss Acrylic Cabinets and Matte Acrylic Cabinets so the metallic sits in context rather than on a sample card.
  • Tone family. Warm bronze and champagne tones behave differently from cool gunmetal and steel. Bring a finish board with your floor, worktop and hardware samples; metallic panels pick up their neighbours.
  • Combination intent. If the metallic is only for an island or tall bank with plainer fronts elsewhere, send Two Tone Acrylic Cabinets as your reference point and mark which doors carry which finish. Mixed-finish jobs need a clear schedule per elevation, or the wrong door arrives in the wrong run.
  • Directionality. Some metallic and textured panels have a directional grain. Confirm on the drawing whether the layout may be reversed on return runs; if not, mark that clearly.

Ask for physical samples before you commit

Request the sample in the actual panel construction, not a printed swatch, and view it on site at both day and artificial light. Then record the sample reference in the purchase order. A quotation should name the approved finish by reference; wording such as "grey metallic" alone is not enough to hold a supplier to.

Quantities, Sizes and Tolerances

Give quantities as a schedule, not a total run length. Per-elevation counts let us price door panels, carcasses and hardware consistently, and they let you compare offers line by line.

  • Number of doors, drawers and tall units per elevation, with panel sizes for each.
  • Whether any unit is full height to the ceiling, and whether a crown or scribe is required at the top.
  • Corner and awkward geometry: angled runs, appliance housing widths, chimney casings.
  • Spare panels. For a handover where the client will maintain the kitchen themselves, buyers commonly order a small spare set of doors to keep on site for future replacement. Ask for it as a priced option rather than assuming it is included.

For multi-unit work — a villa portfolio or several repeat kitchen layouts in one development — state the unit count and how many identical repeats there are. Repeat quantities drive both price and production planning, and they change what we recommend for site tolerances.

Delivery Terms and the Quoted Basis

Quote comparisons go wrong most often on logistics terms. Put the delivery basis in writing, and make sure every supplier quotes on the same one.

Item to stateWhy it matters
Delivery address and site accessTruck size, lift capacity and whether goods go to a store or straight to floor.
Incoterms and who clears customsDuty, clearance and inland freight are the usual hidden deltas between two offers.
Packaging basisFlat-pack versus assembled units changes both price and installation time on site.
Required on-site date, working back from itMade-to-measure joinery has to be scheduled into production; a late finish approval moves the whole delivery.
Split deliveriesIf cabinets must arrive in phases, say so at quotation stage — partial shipments are priced differently.

Our logistics service covers freight by sea, air and rail, customs paperwork, container loading and door-to-door delivery, but the exact route, terms and transit arrangement for your project are confirmed case by case in the quotation. Do not assume a transit time that another supplier offered you.

The Commercial Details That Prevent Disputes

  • What the price excludes. Ask every supplier to list exclusions in writing. Missing items surface later as variations.
  • Payment stages. State the deposit, the milestone before shipment, and the balance — and which document triggers each stage.
  • Validity period. Panel and hardware costs move; a quote without an expiry date is not comparable across months.
  • Change-order basis. Agree now how a late layout change or finish change is priced. This is the most common source of friction on made-to-measure joinery.
  • Approval samples and sign-off. Name who signs off the finish sample and the shop drawings, and when. Production starts after sign-off, not before.
  • Warranty and spare parts. Ask what is covered, for how long, and whether replacement doors can be matched later — metallic batches can vary between production runs, which is one more reason to order spares with the original job.

A Short Checklist to Paste Into Your Enquiry

  • Project name, site address, and whether this is a single home or a villa portfolio.
  • Scope: doors only, doors plus carcasses, or full fit-out including other built-in joinery.
  • Elevations with dimensions, cross-sections, services setting-out and appliance schedule.
  • Finish direction, sample reference, sheen level, and which elevations carry which finish.
  • Hardware: brand or type, handleless or handled, soft-close requirement.
  • Quantities per elevation, plus any spare door sets.
  • Delivery terms, Incoterms, required on-site date and any phased delivery.
  • Exclusions, quote validity, payment stages and change-order basis.

Send that set of information with your enquiry and you will get quotations you can actually compare, on the same basis, and a production schedule that does not slip while the finish is still being argued over. If your drawings are incomplete, send what exists and tell us which decisions are still open; we will price around them and flag the risk rather than quote blind.

All dimensions, finishes and delivery terms in a quotation are project-specific and must be confirmed against approved shop drawings and samples before production.