A hanging modular wardrobe looks simple on a drawing: carcasses fixed to the wall, doors in a chosen finish, internal fittings arranged around your clothes. The problems show up later — a door that fouls the skirting, a shelf that bows under folded knitwear, a finish that does not match the joinery delivered by another supplier. If you are specifying these wardrobes for a villa apartment or a residential project, work through the checklist below before you place an order.

1. Survey and wall conditions

SANTERSON hanging modular wardrobe specified to project dimensions
Hanging modular wardrobe made to the dimensions, layout and finish of an individual project.

Hanging systems carry their load through the wall, not through a floor frame, so the wall is the first item on the list. Before anything else, record:

  • The full run of the wardrobe — width, height to the ceiling or to the header line, and the depth you can actually clear once doors and handles are added.
  • What the wall is made of and whether it will take the fixing pattern. Block, framed stud, tiled and plasterboard walls each need a different fixing approach, and the supplier needs this information in writing.
  • Where skirtings, architraves, switches, sockets, radiators and ceiling cornices sit, because these decide whether the carcass sits flat or needs a scribe.
  • Floor level across the run. Even on a hung system, out-of-level floors change how the doors hang relative to the ceiling line.

Send the supplier the room drawings, not just an approximate length. Made-to-measure sizing is where modular wardrobes earn their cost, and it only works if the dimensions you send are the ones the fitter will find on site.

2. Layout: what goes inside before what goes on the front

Decide storage behaviour first, doors second. Walk the room in your head: what you hang daily, what you fold, what comes out seasonally, and whether ironing, luggage or a safe have a home. Then set the internal zoning.

ZoneDecide at specification stage
HangingSingle or double hang heights; pull-down rails for tall runs; where long garments go.
ShelvingShelf spans and load, adjustable versus fixed shelves, and shelf positions relative to hanging heights.
DrawersDrawer count, widths, runner type and soft-close; whether any drawer sits behind a door that limits pull-out.
Display and lightingGlass-fronted sections, open niches, and integrated cabinet lighting with its power feed and switch point.
AccessoriesTie and jewellery trays, trouser slides, valet rods, mirror panels on the door behind.

Within the same collection you can mix approaches — open modular wardrobes for a dressing area where you want everything in sight, and closed sections where dust and visual clutter matter. The point of the checklist is that each zone has a written decision attached to it, not an assumption carried into production.

3. Doors, openings and circulation

Doors are where a good layout fails in practice. Test the swing or slide against the room, not against the elevation drawing:

  • Hinged doors need clearance to open fully without hitting the bed, the en-suite entry or each other.
  • Sliding doors need a track zone and wall return; they save floor space but halve the opening at any one moment.
  • Glass-fronted doors change what you must keep tidy inside, and framed glass reads differently from frameless in a bedroom scheme.

If the scheme calls for glazed fronts, compare options in the same family — glass modular wardrobes sit alongside the hanging versions and are specified the same way, with dimensions, frame colour and glass tint confirmed per opening.

4. Materials, finishes and how they are matched

For each surface, write down the material, the finish and where that finish appears elsewhere in the project. A wardrobe that repeats the kitchen door profile or the veneer used on wall panelling is a deliberate choice, and it has to be stated in the order.

  • Carcass board and edge treatment — say what is visible when a door stands open.
  • Door substrate and surface: lacquer, laminate, veneer or solid timber, with the sheen level named.
  • Colour reference. Use the supplier's swatch or sample, and keep the same reference through the quotation, the production drawing and the delivery note.
  • Handles and hardware finish, including hinges, runners and any push-to-open gear.

Ask for a physical sample before signing off a large order. A screen colour is not a finish, and a single board sample lets you check it against fabric, flooring and lighting in the actual room.

5. Fixing detail and interface with the building

This section is where project buyers most often leave gaps. Put these in the specification:

  • Fixing method and substrate preparation, including any blocking or reinforcement the wall needs before delivery.
  • Who prepares the wall, and at what stage — usually the builder, working from a drawing you supply.
  • How the top and sides are closed off: scribes, headers, cornices or a shadow gap, and who paints or fills after installation.
  • Clearances for skirting and architrave, and whether these are removed and reinstated.
  • Power provision for internal lighting, including the cable route and where the transformer sits if it needs access later.

6. Documentation to request from the supplier

Before you confirm an order, ask for the pack that lets a site team install without phoning you:

  • Dimensioned elevation drawings for every run, with the internal layout shown.
  • A specification sheet listing materials, finishes and ironmongery by reference.
  • Packing list by unit or room, so crates go to the right floor on a multi-unit job.
  • Installation sequence and fixing drawings, including wall-preparation requirements.
  • The delivery terms: what is included in door-to-door delivery, and what happens on site after the crate arrives.

7. Delivery, handling and installation sequence

Built-in wardrobes are last in the trade sequence for a reason: paint, flooring and skirtings need to be finished or agreed first. Confirm the site conditions you are installing into — decoration complete, floors level and clean, heating running so boards have acclimatised. For overseas manufacture, allow time in the programme for production and freight rather than assuming the wardrobe can be brought forward, and check access at the property: lift sizes, stair turns and corridor widths decide whether a tall carcass arrives as one piece or in sections.

8. Handover and after installation

  • Check every door for alignment, closure and clearance along the full height.
  • Operate each drawer and slide fully, including any soft-close mechanism.
  • Confirm lighting works from its switch point and that any transformer is accessible.
  • Record finish references and drawings in the project file for future spare parts or extensions.
  • Note snags on the day rather than after decoration has been touched up.

Short version of the checklist:

  • Wall construction and survey data recorded, with fixing method assigned.
  • Internal zoning decided zone by zone and shown on the drawing.
  • Door type tested against circulation before ordering.
  • Materials and finishes named, with references quoted.
  • Interface details — scribes, headers, power for lighting — allocated to a trade.
  • Drawings, specification sheet and packing list requested from the supplier.
  • Site readiness confirmed before delivery is booked.
  • Handover checks recorded on the day of installation.

How a manufacturer works through this list with you

SANTERSON manufactures hanging modular wardrobes to project-specific dimensions, with the layout, materials and finishes set for each space. Because our custom and OEM service covers bespoke finishes and textures, the wardrobe fronts can be matched to the kitchen cabinetry, wall panelling and doors specified elsewhere in the same project, rather than being colour-matched after the fact by separate contractors. That coordination is what removes most of the arguments on site: one drawing set, one specification, one delivery schedule.

Send us the room drawings and the finishes you are working to, and we will come back with elevations, an internal layout and a specification you can put in front of your builder or client.

Start with your drawings

Share dimensions, wall construction and finish references for your wardrobe run. We will confirm the layout, materials and what your site team needs to prepare before installation.

Contact: PHILLIP  |  Phone / WhatsApp: +86-13928214007  |  Email: santerson@qq.com

Contact SANTERSON

Dimensions, materials and finish availability are confirmed per project at quotation stage. Installation requirements depend on the wall construction and site conditions of each property.