A tall cabinet enquiry usually fails in one of two ways: the drawing is not ready, or the information that reaches the factory is too thin to price. Santerson Open Shelf Tall Cabinets are made to measure for each project, so the quality of your first message decides how quickly you get a usable quotation instead of another round of questions.

The unit sits in our bathroom range and is configured rather than ordered off a shelf: finish, layout and dimensions are specified per space. That makes preparation on your side genuinely useful. Below is the shortlist we would ask you to bring to an enquiry, and what each item changes in the outcome.

Start with the wall, not the cabinet

Send a dimensioned sketch or the architectural drawing of the bathroom or laundry area where the unit will stand. For an open-shelf tall unit the details that matter most are easy to miss on a general room plan:

  • Floor-to-ceiling height at the exact position, including finished floor levels and any ceiling bulkhead.
  • The clear width of the recess or wall run, plus whether adjacent doors, drawers or a vanity overhang into it.
  • Where services run: water supply, waste, and any electrical points behind or beside the unit.
  • Wall build-up — stud, brick, or framed cavity — because fixing method and load path follow from it.
  • Floor finish thickness at the threshold, which affects whether the unit sits on a plinth or is held clear.

If you are working from a set of drawings issued by someone else, mark the wall in question and send that page. A marked-up plan answers most layout questions in one exchange.

Decide what the shelves have to hold

Open shelving is judged by how it behaves after handover, not how it looks on a render. Tell us the intended use and we can set shelf spacing and construction around it:

  • Towels and linens in guest bathrooms versus heavier stock in a housekeeping or utility room.
  • Baskets, hampers or appliances that need to slide in and out without fouling the shelf above.
  • Display items, where spacing and sightlines matter more than capacity.

Where you are unsure, say so. We would rather propose an arrangement for your review than guess at a loading you never intended. If part of the run needs doors and part needs to stay open, Santerson Open Storage in the same bathroom range can be configured to match the finish.

Choose finishes against the room, not the sample book

Material and finish are specified per project. To keep the specification review short, send:

  • A reference to the finish already used in the property — a previous order code, a photograph of installed joinery, or the designer's schedule line.
  • The room's exposure: an ensuite with daily steam and low airflow behaves differently from a guest powder room.
  • Edge and handle preference, since an open-shelf unit still needs its carcass edges and any hardware resolved.

Where the tall cabinet must visually continue cabinetry elsewhere in the property, flag that early. Matching a tone across separate orders is a specification task, not something to correct after production.

What we send back, and what happens next

With those inputs an enquiry moves quickly through our usual sequence: brief and design proposal, quotation with details confirmed, then production, shipment and follow-up. Because the unit is made to measure, dimensions and the selected specification are confirmed with you before manufacture.

What you provideWhat it unlocks
Dimensioned plan of the positionCabinet footprint, clearance to doors and services, fixing method
Intended loading and shelf contentsShelf spacing, span and construction
Finish reference or room exposure notesMaterial and finish selection for review
Project location and delivery arrangementPackaging, container loading and freight planning
Programme dates for the fit-outProduction sequence and shipment timing

For a single villa bathroom the list above may fill half a page. For an apartment or hospitality job, put the same information into a schedule with one line per unit type, and note which bathrooms repeat — that is where made-to-measure work either saves money or quietly multiplies variations.

Related units in the same range

Tall cabinets rarely sit alone. Two configurations we specify alongside them:

Before you send an enquiry, confirm two things for your own file: the finished floor and ceiling levels at the position, and who is responsible for services that pass behind the unit. Those two items cause most re-quotations on bathroom joinery.

Send us the drawing, the loading requirement and a finish reference, and we will return a configuration you can review against your programme — with dimensions and specification confirmed before anything goes into production.